Nortec Industries Airfog Series installation manual Introduction

Page 8

10-00

INTRODUCTION

10-00

Page 1 2008-04-11

Image 8
Contents Airfog SeriesTM Proprietary Notice Liability Notice Table of Contents SHUT-DOWN Procedure List of Figures List of Tables This page Intentionally Left Blank Introduction Introduction General Airfog Technical Considerations Older Nortec Airfog System Components 10-00 This page Intentionally Left Blank Installation Installation Nozzle System LayoutTypical Nozzle Layout for Wall Mounted System Multi Zone Layout Cleaning IntroductionSupply Feed Lines Mounting of NozzlesWater and Air Line Pressure Control Connecting Nozzles Saddle Clamp InstallationVacuum Valve Pilot Operated AIR Regulator10-10 Vacuum Valve Operation Electrical Wiring Primary AIR Pressure ControlPrimary Water Pressure Control Control PanelPrimary Air Pressure Control Section Schematic Plumbing Layout Pilot LinesThis page Intentionally Left Blank Mini & Octo Installation AFE Self Contained Airfog Systems AFE Mini SystemsMini Installations Installation Procedure AFE Octo SystemsOcto Layout with Interfaces 10-20 Ceiling Mounting of Octo Four Octo Units with a Single Control Panel START-UP Procedure Compressed AIR Supply Water SupplySelf Cleaning Cycle Adjustment Setting the System for Normal Operation Capacity Output vs. Vacuum Valve Adjustment This page Intentionally Left Blank SHUT-DOWN Procedure 10-40AFE, MINI, and Octo Shut Down Procedures Maintenance 10-50Maintenance Unscheduled Maintenance 10-50 Troubleshooting 10-60Troubleshooting 10-60 This page Intentionally Left Blank Spare Parts 10-70Spare Parts Octo Exploded View Octo This page Intentionally Left Blank Item # Description QTY Vacuum Valve Exploded View Item # Description Octo Mini Standard Control Panel Exploded View AFE This page Intentionally Left Blank Warranty Authorized Agent