SECTION IV OPERATING INSTRUCTIONS
Start-up Instructions
1.Check that the humidifier is properly mounted and level.
2.Check that the water fill and drain are properly connected.
3.Check that the correct voltage and amperage services are supplied.
4.Check all controls are wired properly.
5.Check that the steam distributor is properly installed and that the steam hose has been properly routed without any kinks or flat spots.
6.With power off,
7.With the
8.Turn the control and high limit (ducted versions only) humidistats up to there highest setting. The contractor should pull in.
9.After approximately a twenty second delay, the fill valve should open and water begins to fill the cylinder to the preset amp level or cylinder full condition, depending on the incoming water supply. When starting up the unit, it is best to put an amp clamp on the power leg that passes through the
NOTE
If upon initial
torroid transformer. Insure that the humidifier fills to "cylinder full" (approximately 1.5” from the top of the cylinder), or that the amperage reaches the data plate maximum and the fill valve closes.
10.All units are equipped with a
11.Reset control and high limit humidistats to there desired settings. Typical control humidistat settings are
NOTE
The capacity of the humidifier can be adjusted between 500% and 100% of the maximum level by adjusting the capacity adjustment potentiometer (labeled R39) on the main circuit board. All blower versions are set from the factory to produce 4 lbs/hr. If the psychrometric conditions permit, the
CAUTION!
Inadequate airflow may allow humidity to collect in areas causing condensation.
Figure 9
10