Herrmidifier Co Steam Distribution, Blower Version 6000-1,2, DUCTED VERSION 6000-3,4

Page 8
Steam Distribution

Steam Distribution

Blower Version (6000-1,2)

The 6000 Series Steam Humidifier with the built in blower pack should be mounted a minimum of 18” from the ceiling. There should also be 5' of horizontal clearance in front of the unit to prevent stem from condensing on obstructions (See Figure 1). There is an adjustable louver to adjust the direction of the steam plume.

WARNING!

Do not adjust this louver to extreme angles as it will restrict the airflow causing condensation to form around the steam distribution manifold.

WARNING!

Locate away from areas where people can walk into steam path.

Figure 5

DUCTED VERSION (6000-3,4)

Herrmidifier supplies a stainless steel duct distributor for injecting pure steam into the duct. This can be installed in the bottom or the side of the duct (See Figure 5). When installing in the side of the ductwork make sure it is positioned to allow condensate to drain back down the steam hose. The duct distributor pipe has a built in pitch to allow condensate to drain back into the hose. The hose must be installed with a minimum 8% (1” per foot) pitch back to the humidifier to allow condensate to drain back to the steam cylinder (See Figures 5 & 6). A minimum of 5 feet downstream clearance before any bends or obstructions is recommended for most applications (See Figure 2). However, different psychrometric conditions may require greater or lesser steam absorption distances. A minimum duct temperature of 60 degrees F is recommended. Temperatures below this may cause condensation to form in the duct. Lined duct may be used if the thickness is 1” or less.

Distributor Mounting Instructions

Sheet metal Duct:

Make a 1-1/4" hole in the duct at desired location. Insert duct distributor and secure with self-tapping sheet metal screws (supplied by others).

Fiberboard Duct:

Make a 1-1/4" hole in the duct at desired location. Insert duct distributor and mark the four holes on flange. Drill

(4)¼”- holes at marked locations. Cut an access hole in duct and install the enclosed tee nuts from the inside of the duct. Fasten distributor with enclosed ¼” bolts.

Figure 6

8

Image 8
Contents Electronic Steam Humidifiers Installation Operation Service6000 Series TABLE OF CONTENTS SECTION III INSTALLATION INSTRUCTIONSSECTION V TROUBLESHOOTING GUIDE SECTION VI SUGGESTED SPECIFICATIONSSECTION I WARRANTY Warranty SECTION II UNIT OPERATION Basic Operation Key Features Adjustable SetpointsFaults ConductivityEngineering and Application Allowable Operating ConditionsPlumbing SECTION III INSTALLATION INSTRUCTIONS MountingRemove foam packing from top of tank Steam Distribution Blower Version 6000-1,2DUCTED VERSION 6000-3,4 Distributor Mounting InstructionsWiring Figure Supply PowerElectrical Characteristics Control Circuit ConnectionsStart-upInstructions SECTION IV OPERATING INSTRUCTIONSChecklist Checklist completed byHumidifier Installer Company Checklist completion dateMaintenance To remove the cylinderFigure 11A Figure 11B Extended ShutdownSECTION V TROUBLESHOOTING GUIDE Circuit Board SettingsStandard Settings High Conductivity SettingsProblem / Symptom See - NON-FAULTACTIVATEDFAULT ACTIVATED PROBLEMS Fill System FaultReason - Correction Non-FaultActivated ProblemsProblem / Symptom Reason - Correction Non-FaultActivated Problems - Cont’dProblem / Symptom Blower Version Wiring Diagram6000-1and Blower Version Exploded View 6000-1and Blower Version Parts List 6000-1and Ducted Version Exploded View 6000-3and Ducted Version Parts List 6000-3and Ducted Version Wiring Diagram 6000-3and SECTION VI SUGGESTED SPECIFICATIONS Suggested Specifications Part I-ScopePart II -Scope Part 3 --Execution