GATE OPERATOR INSTALLATION

Concrete Pad Installation

1. Follow the local building code to determine the required depth of the concrete pad.

2.Pad measurements recommended by Viking Access Systems are at least 28” long, 18” wide and 24” deep to ensure the stable operation of the operator, and a minimum of 4” above level grade to avoid any flooding of the machinery.

3.Provide a sufficient number of conduit pathways for all low power accessories such as loop detector leads, maglock, non-contact sensors, contact sensors, safety and other commands. Also provide conduit for the power supply to the operator.

!DO NOT run low voltage and high voltage wiring in the same conduit.

!Provide at least 12” separation between low and high voltage conduits.

1 4

VIKING TECHNICAL SUPPORT 1.800.908.0884

 

 

Image 16
Contents Instructions Viking Q-7 Slide Gate Operator Vehicular Gate Operator Revision Q7NXMN10.E December Parts Diagram DescriptionOperator References EMI Board Connector Control Board ReferencesTable of Contents Important Safety Instructions Important Safety InformationImportant Installation Instructions Important Installation Instructions Maintenance General Safety PrecautionsUL325 Gate Operator Classifications GlossaryPhoto Beam non-contact sensor Installation Secondary Entrapment ProtectionEdge Sensor contact sensor Installation When manual operation is requiredManual Release To resume normal operationAudible Alarm Reset Switch Installation Manual Reset for the Audible AlarmSingle Phase 50Hz / 60Hz SpecificationsLocate Control Buttons Gate Operator Installation Concrete Pad InstallationPositive Stop Installation Suggested Positive Stop TypesOperator Positioning Technical TIP Before completing the installation procedure StepTips for proper ground installation Electrical InstallationHigh Voltage Supply Option Electrical Installation Solar Supply OptionLimits Setup To Readjust the Close Limit To Readjust the Open LimitMASTER/SLAVE Setup Two Wire CommunicationCable Requirements MS1 MS2Wireless Communication Options Required ADD-ONControl Board Setup Initial SettingsTimer Hold Open Timer ODSAuto Open Power Failure Option Last Open Power Failure OptionObstruction Sensor Primary Entrapment Protection ODS Obstruction Detection SensorViking Lock Mode Viking HeaterThis page Left Blank Intentionally Accessory Connections Re-Open Photo Beam vehicular SafetyCOM + Check for proper operationOpen-Stop-Close Radio Receiver TypicalOpen Only Anti-Tailgate, Open Commands & Guard Station Open CommandsGuard Station ATG Anti-TailgateViking Loop Rack Accessory Connections Guidelines for Loop InstallationMagnetic Lock, Lock Solenoid Power for the LocksMagnetic Lock Lock Solenoid Synchronization with B-12 Barrier Arm B-12 Synchronization OptionTroubleshooting LED ReferencesTroubleshooting LCD MSG Meaning LCD Display ReferencesTroubleshooting Error Messages Solutions CheckAccess Control Connections Power ConnectionsAppendix a Relays In GeneralGeneral Technical TIP Viking usesCommon Radio Receivers Connections Appendix C Solar ApplicationsPanels Batteries & FuseViking Expansion Products Viking Konnect Diagnostic Tool On-site remoteViking Konnect Master/Slave Kit Secure and reliable OUR Continuous Commitment to Excellence Standard Features