Viking Access Systems Q7 manual Step, Technical TIP Before completing the installation procedure

Page 19

GATE OPERATOR INSTALLATION

!TECHNICAL TIP: Before completing the installation procedure;

Open and close the gate manually, making sure there is sufficient space between the gate and adjacent walls.

Check that the wheels are turning freely on the track and there are no restrictions while pushing the gate to the open and closed positions.

Confirm that there is adequate spacing for the guide rollers and that there are no restrictions throughout the travel of the gate.

STEP 1

Before securing the chassis to the concrete pad or posts, make sure the gate and operator are LEVEL and PARALLEL. Minimum distance between the operator and gate is 2”.

STEP 2

Chain Installation: Before welding the provided chain brackets, make sure the chain will be in a straight line with, and at the same height as, the chain leaving the gate operator rollers.

VIKING TECHNICAL SUPPORT 1.800.908.0884

1 7

 

 

Image 19
Contents Instructions Viking Q-7 Slide Gate Operator Vehicular Gate Operator Revision Q7NXMN10.E December Description Parts DiagramOperator References Control Board References EMI Board ConnectorTable of Contents Important Safety Instructions Important Safety InformationImportant Installation Instructions Important Installation Instructions General Safety Precautions MaintenanceGlossary UL325 Gate Operator ClassificationsSecondary Entrapment Protection Photo Beam non-contact sensor InstallationTo resume normal operation Edge Sensor contact sensor InstallationWhen manual operation is required Manual ReleaseManual Reset for the Audible Alarm Audible Alarm Reset Switch InstallationSingle Phase 50Hz / 60Hz SpecificationsLocate Control Buttons Concrete Pad Installation Gate Operator InstallationSuggested Positive Stop Types Positive Stop InstallationOperator Positioning Step Technical TIP Before completing the installation procedureTips for proper ground installation Electrical InstallationHigh Voltage Supply Option Solar Supply Option Electrical InstallationLimits Setup To Readjust the Open Limit To Readjust the Close LimitMS1 MS2 MASTER/SLAVE SetupTwo Wire Communication Cable RequirementsRequired ADD-ON Wireless Communication OptionsODS Control Board SetupInitial Settings Timer Hold Open TimerLast Open Power Failure Option Auto Open Power Failure OptionODS Obstruction Detection Sensor Obstruction Sensor Primary Entrapment ProtectionViking Heater Viking Lock ModeThis page Left Blank Intentionally Check for proper operation Accessory ConnectionsRe-Open Photo Beam vehicular Safety COM +Open-Stop-Close Radio Receiver TypicalOpen Only ATG Anti-Tailgate Anti-Tailgate, Open Commands & Guard StationOpen Commands Guard StationViking Loop Rack Guidelines for Loop Installation Accessory ConnectionsMagnetic Lock, Lock Solenoid Power for the LocksMagnetic Lock Lock Solenoid Barrier Arm B-12 Synchronization Option Synchronization with B-12LED References TroubleshootingTroubleshooting LCD Display References LCD MSG MeaningTroubleshooting Error Messages Check SolutionsPower Connections Access Control ConnectionsTechnical TIP Viking uses Appendix aRelays In General GeneralCommon Radio Receivers Connections Batteries & Fuse Appendix CSolar Applications PanelsViking Expansion Products Viking Konnect Diagnostic Tool On-site remoteViking Konnect Master/Slave Kit Secure and reliable OUR Continuous Commitment to Excellence Standard Features