FireplaceXtrordinair 36 DV EFIII owner manual Power Heat Duct

Page 46

4 6 Optional Equipment (for qualified installers only)

POWER HEAT DUCT (part # 98500769)

The optional heat duct allows the fireplace to transfer heat to separate locations in the home. One or two ducts may be used. Installation should take place prior installing drywall.

Warning: This kit must be installed as specified in these instructions. Do not modify any component.

Warning: Use of any external blower other than the Travis Power Heat Duct Blower will void the warranty and listing of this appliance and may create a fire hazard.

Note :

The power heat duct must be installed by a qualified service technician.

Note :

Some building codes

 

Floor

 

may require the use of

 

 

Junction Box

Boot

 

firestop spacers

Maximum Duct

 

 

Length = 20'

 

whenever the duct

 

 

 

 

 

passes from room to

 

 

 

room.

Rheostat

 

 

 

 

Note :

When routing ducts

(with cover plate)

 

 

 

 

through a cold area

Use 10” x 3-1/4”

Blower

 

(e.g. crawl space) we

wall stack (duct)

Box

 

Duct Adapter

 

when passing

 

recommend insulating

through tight

(6” Round to 10” x 3-1/4”)

 

the duct with fiberglass

areas.

6" Duct

 

 

 

insulation. If paper-

 

Starter Ring

 

backed insulation is

 

 

 

 

 

used, the paper can not

 

 

 

contact the duct.

 

 

 

 

Heat Duct

Grill

 

Electrical

Wall Adapter

Wiring

 

 

(for use on

 

 

2 x 4 walls)

 

 

 

Electrical

 

 

Source

Determine the route for the heat duct using the illustration below as a guide

NOTE:

Air flow through the duct is affected by length and number of bends. Keep the length and number of bends to the minimum to maximize performance.

Blower Box

When the duct penetrates the fireplace enclosure vertically and the top of the enclosure is within 36” of the top of the fireplace, a firestop spacer that maintains a 1/2” clearance between all sides of the duct and any combustible material must be used.

1/2”

 

Co-Axial Vent

0” Clearance to

 

Combustibles

 

(for intake air

 

20’ Maximum

and exhaust)

 

 

 

Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Duct Adapter

 

 

 

 

 

 

Use 10” x 3-1/4” wall stack

 

 

 

 

 

(6” Round to 10” x 3-1/4” -

 

 

 

 

 

 

(duct) when passing

 

 

 

 

 

 

 

included with the power heat

 

 

 

 

 

 

through tight areas.

 

 

 

 

 

vent kit)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Travis Industries

4040708

1 0 0 - 0 1 1 6 0

Image 46 Contents
If YOU Smell GAS Introduction Important Information 2IntroductionTravis Industries 4040708 0 0 1 1 6 Table of Contents Safety Precautions If YOU Smell GASThis Manual Features Installation Options 6Features and SpecificationsNatural Gas Propane Installation Overview Installation WarningsPacking List Additional Items Required Minimum Framing Dimensions Fireplace Placement RequirementsClearances Corner Installations Raised FireplacesHearth Requirements Floor Mounted FireplacesFacing Requirements Facing Over 1 ThickFacing Detail TOP ViewFace Dimensions Installation forModifying the Face Angle for Rectangular Faces Facing and Hearth Examples Side ViewDV Fireplace Combustible Mantels Mantel RequirementsNon-Combustible Mantels Use of 8 Diameter Pipe Vent RequirementsAltitude Considerations Part Numbers for 6-5/8 Diameter VentVent Installation Horizontal Vent RequirementsElbows Approved Vent ConfigurationsRestrictor Position Measuring Vent LengthsZero or Two 45 Offsets Horizontal Terminations using 6-5/8 Diameter Vent 0feet 5feet 10feet 12max 10 max FeetFeet 5feet 10feet 15feet 20feet 25max 40 max Horizontal Terminations using 8 Diameter Vent Termination Requirements see the illustration below Gas Line Connection Gas Line RequirementsFuel Gas Inlet PressureElectrical Connection Finalizing the Installation Re-Attaching the Glass Frame8Finalizing the Installation Glass Frame Removal Spring Pin InstallationTop Step 0Finalizing the InstallationFront View Side View Correct 2Finalizing the Installation Fine Tuning the EMBER-FYRE BurnerBefore You Begin Operation3Location of Controls See explanation below 4Operation Starting The Pilot FlameStarting the Fireplace for the First Time Adjusting the Flame HeightTurning the Fireplace On and Off 6Operation Adjusting the Blower SpeedOptional Power Heat Duct Normal Operating SoundsYearly Service Procedure Maintenance3Maintaining Your Fireplaces Appearance Maintenance TroubleshootingWhat Turns the Main Burners On and Off How this Fireplace WorksWhat Prevents Gas Buildup Wiring Diagram 0MaintenanceReplacement Parts List Safety Label Minimum Clearances to Combustibles 2Limited 7 Year Warranty Years 1 & 2 Coverage Parts & LaborBurner Replacement LP Conversion InstructionsOptional Equipment for qualified installers only Slotted Screwdriver Or T-20 Torx Power Heat Duct Wall or Ceiling Mounting Optional Equipment for qualified installers only Wiring Diagram Follow the directions below to wire the blower box Maintenance Instructions 2Index