Lochinvar 51 operation manual Prepare boiler, Remove boiler from wood pallet, Gas conversions

Page 12

Installation & Operation Manual

2Prepare boiler

Remove boiler from wood pallet

1.After removing the outer shipping carton from the boiler, remove the parts box.

2.To remove the boiler from the pallet:

a.Remove the two (2) lag bolts securing the bottom of the unit to the pallet.

b.Lift the boiler off the wall bracket mounted to the pallet.

3.Remove the two (2) lag bolts securing the wall bracket to the wood pallet. Be certain not to lose the wall bracket as it will be needed for securing the boiler to the wall (FIG. 2-1).

Table 2A LP Conversion Table

 

LP Conversion Table

Model

 

LP Orifice Stamping

51

 

50

81

 

80

106

 

105

151

 

210 / W150

211

 

210 / W150

1.

Remove the front access cover from the unit (no tools

 

required for removal).

2.

Disconnect the ribbon cable from the control board.

 

Remove the four (4) screws securing the bezel to the front of

 

the unit and remove the bezel.

NOTICE

Do not drop the boiler or bump the jacket on the floor or pallet. Damage to the boiler can result.

3.

Locate the power switch on the gas valve and turn the power

 

switch to the “OFF” position (FIG. 2-2).

4.

Disconnect the Molex plug from the wiring connector

Figure 2-1Boiler Mounted on Shipping Pallet

REMOVE SHIPPING [WALL] BRACKET

DO NOT DISCARD-

WILL BE NEEDED TO

SECURE THE BOILER

TO THE WALL

 

located on the gas valve.

5.

Using a 5/16" nut driver, loosen the band clamp securing the

 

air intake coupler to the gas valve venturi. Remove the air

 

intake pipe and coupler from the gas valve venturi.

6.

Using a 4mm Allen wrench, remove the two (2) screws

 

securing the gas valve venturi to the inlet of the combustion

 

blower (FIG. 2-2). Remove the gas valve venturi assembly

 

from the unit.

Figure 2-2Gas Valve Power Switch & Venturi Removal

REMOVE THE TWO (2) SCREWS

SECURING THE GAS VALVE VENTURI

TO THE INLET OF THE COMBUSTION BLOWER

POWER SWITCH

Gas conversions

DETAIL

￿WARNING

12

The gas conversion procedure should be accomplished BEFORE the boiler is installed. For a boiler already installed, you must turn off gas supply, turn off power, and allow the boiler to cool before proceeding. You must also completely test the boiler after conversion to verify performance as described under Start-up, Section 10 of this manual.

You must install the propane orifice to fire the Knight wall mount boiler on propane. Verify when installing that the orifice size marking matches boiler size (Table 2A). Failure to comply could result in severe personal injury, death, or substantial property damage.

7.Using a 4mm Allen wrench, remove the four (4) screws securing the gas valve to the venturi (FIG. 2-3).

8.Locate the propane orifice disk from the conversion kit bag. Verify that the stamping on the orifice disk matches the boiler size (51 - 211, see Table 2A).

9.Place the orifice into the black rubber grommet in the side of the gas valve and secure inside the gas valve (see FIG. 2-3).

10.Reposition the gas valve against the venturi and replace the four (4) screws removed in Step 7, securing the valve to the venturi (FIG. 2-3).

11.Reposition the gas valve venturi assembly inside the unit. Secure the gas valve venturi to the combustion blower by replacing the two (2) screws removed in Step 6 (FIG. 2-2).

12.Reattach the air intake pipe and coupler to the gas valve venturi. Tighten the band clamp to secure.

Image 12
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchangerModels 51 Ratings Knight Wall Mount Boiler =B=R RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Vent and air pipingWall mounting location Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Mounting the boiler Mounting to a concrete wallMounting to a metal studded wall Mounting to a wood studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Direct venting options Vertical Vent, Sidewall AirInstall vent and combustion air piping Requirements for installation in CanadaInstalling vent and air piping PVC/CPVC Vent piping materialsPVC/CPVC air intake/vent connections Air inlet pipe materialsApproved Stainless Steel Vent Manufacturers MakeStainless steel vent Boiler FlueBoiler Boiler Flue Intake Air AdapterStainless steel air intake/vent connections Removing from existing ventVent and air system Vent, air piping and terminationOptional room air Model Kit Number KIT30051 Air contaminationIf using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Vent Size2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Multiple vent/air terminationsSidewall termination installation Sidewall termination optional concentric ventDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletHydronic piping Near boiler piping components Near boiler piping connections Circulator sizingModel Minimum Pipe Pump Size GrundfosArmstrong Variable speed pump setup Variable speed pump optionModel Grundfos UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Multiple Boilers Multiple Temperatures Model 8Single Boiler Zoned with Valves Model 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasNatural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchFlow switch ThermostatAlarm contacts Wiring of the cascadeSystem supply sensor Boiler management systemInstallation Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemClean/Inspect Trap Assembly Check for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayAccess modes InstallerUser Knight wall mount boiler control module 1Control PanelCall for Heat Information Right Select no Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Check ignition ground wiring Check all boiler wiringCheck control settings Check expansion tankCheck flame signal Cleaning boiler heat exchangerReview with owner Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram Page Page

51 specifications

Lochinvar 51 is an innovative and robust residential boiler system designed for high-efficiency heating needs. A popular choice among homeowners, the Lochinvar 51 stands out in the market due to its advanced features and eco-friendly technologies.

One of the main features of Lochinvar 51 is its compact design, making it ideal for installation in limited space environments such as attics or closets. Despite its small footprint, it boasts a powerful heating capacity, suitable for varying home sizes. The boiler operates with a modulating gas burner that allows it to adjust its heat output according to the demand, ensuring efficiency and comfort throughout the day.

The Lochinvar 51 employs a cutting-edge heat exchanger made from stainless steel, which is highly durable and resistant to corrosion. This design not only enhances the boiler's performance but also increases its lifespan. The unit offers impressive AFUE (Annual Fuel Utilization Efficiency) ratings, showcasing its capability to convert a significant portion of fuel into usable heat, thus minimizing energy waste and reducing heating costs.

Technologically, the Lochinvar 51 is equipped with advanced control systems that facilitate precise temperature management. The intuitive interface allows homeowners to easily set their desired temperature and monitor the system’s performance. Additionally, the integration of outdoor reset technology helps optimize energy consumption by adjusting the water temperature based on outside weather conditions, leading to further energy savings.

Safety features are also paramount in the Lochinvar 51. It includes built-in safeguards that monitor pressure and temperature, automatically shutting down the system in case of any irregularities. This not only protects the boiler but also ensures peace of mind for users.

Moreover, Lochinvar 51 supports compatibility with smart home systems, providing homeowners with remote control capabilities via mobile devices. This innovative feature enhances user convenience, allowing for easy adjustments and monitoring of the heating system from anywhere.

In conclusion, the Lochinvar 51 is an exceptional choice for homeowners looking for a reliable, efficient, and technologically advanced heating solution. With its impressive heating capacity, durable design, and innovative control features, it sets a high standard in residential boiler performance, making it a top contender in today’s market.