2Prepare boiler (continued)

13.Reattach the wiring connector to the gas valve. Tighten the screw on the wiring connector to secure to the gas valve.

14.Turn the gas valve power switch to the “ON” position.

15.Reattach the bezel to the unit. Reconnect the ribbon cable to the control board.

16.After installation is complete, fill out the gas conversion label (in the conversion kit bag) and affix it to the unit under the boiler rating plate inside the unit. Attach the LP caution label (in the conversion kit bag) to the left side of the unit in the lower left corner.

17.Replace the front access cover.

￿ WARNING

After converting to LP, check combustion

 

per the Start-up procedure in Section 10

 

of this manual. Failure to check and

 

verify combustion could result in severe

 

personal injury, death, or substantial

 

property damage.

Figure 2-3Installing Propane Orifice

Mounting the boiler

See page 9 of this manual for boiler mounting location instructions.

Installation & Operation Manual

￿WARNING The boiler is too heavy for a single person to lift. A minimum of two people is needed for

mounting the boiler onto the bracket.

Mounting to a concrete wall:

1.Mount the wall bracket using the two (2) wedge anchor bolts provided with the bracket. To mount the wedge anchor bolts, drill a 1/4" diameter hole 1 1/8" deep and insert anchor. Hang the bracket from the anchor and secure with the two nuts provided. Make sure the top edge of the bracket is away from the wall. Ensure bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

Note: If wall thickness does not allow a 1 1/8" deep hole, field supplied hardware suitable for the application should be provided.

2.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) remaining anchors, following the instructions above.

The boiler is too heavy for a single person to ￿ WARNING lift. A minimum of two people is needed for

mounting the boiler onto the bracket.

Mounting to a metal studded wall:

1.The wall mount bracket is designed for a stud spacing of 16 inches from center. For other stud spacing a solid mounting surface must be provided by the installer.

￿WARNING Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the studs only.

2.Mount the wall bracket using two (2) field supplied toggle bolts capable of supporting 100 pounds each. Ensure the top edge of the bracket is away from the wall. Ensure the bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

3.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) field supplied toggle bolts.

￿WARNING The boiler is too heavy for a single person to lift. A minimum of two people is needed for

NOTICE

The Knight Wall Mount boiler is not intended for floor installation.

mounting the boiler onto the bracket.

Figure 2-4Mounting the Boiler

Mounting to a wood studded wall:

1.The wall mount bracket is designed for a stud spacing of 16 inches from center. For other stud spacing a solid mounting surface must be provided by the installer.

￿WARNING Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the studs

only.

2.Mount the wall bracket using the 2 1/4" lag bolts provided. Make sure the top edge of the bracket is away from the wall. Ensure the bracket is level when mounted. Extreme care is needed to ensure the bolts are secured in the center of the studs.

3.Hang the boiler on the bracket and secure the bottom of the boiler with two (2) additional lag bolts provided.

WALL:

WOOD OR METAL STUDS ON 16" CENTERS

-OR-

MASONRY / POURED CONCRETE

MOUNTING BRACKET (FACTORY SUPPLIED)

FASTENERS

APPROPRIATE

FOR WALL TYPE

QTY: 4

13

Image 13
Contents Models 51 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight Wall Mount Boiler How it worksModels 51 Knight Wall Mount Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Vent and air piping Provide air openings to roomWall mounting location Prevent combustion air contaminationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Mounting to a concrete wall Mounting the boilerMounting to a metal studded wall Mounting to a wood studded wallDirect venting options Sidewall Vent General ventingDirect venting options Vertical Vent, Sidewall Air Direct venting options Vertical VentRequirements for installation in Canada Install vent and combustion air pipingInstalling vent and air piping PVC/CPVC Vent piping materialsAir inlet pipe materials PVC/CPVC air intake/vent connectionsApproved Stainless Steel Vent Manufacturers MakeBoiler Flue Stainless steel ventBoiler Boiler Flue Intake Air AdapterRemoving from existing vent Stainless steel air intake/vent connectionsVent and air system Vent, air piping and terminationModel Kit Number KIT30051 Air contamination Optional room airSidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Vent Size2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrationsTermination and fittings Multiple vent/air terminationsSidewall termination optional concentric vent Sidewall termination installationDescription and usage Sidewall termination optional concentric vent models 8Concentric Vent Dimensional DrawingMultiventing sidewall terminations 10Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrationsVertical termination optional concentric vent Vertical termination installationMinimum Combustion AIR Typical Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric ventingAIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet Existing vent as a chaseHydronic piping Near boiler piping components Circulator sizing Near boiler piping connectionsMinimum Pipe Pump Size Grundfos ModelArmstrong Variable speed pump option Variable speed pump setupModel Grundfos UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Multiple Boilers Multiple Temperatures Model 8Single Boiler Zoned with Valves Model 10Single Boiler Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsLouver proving switch Outdoor temperature sensorFlow switch ThermostatWiring of the cascade Alarm contactsSystem supply sensor Boiler management systemInstallation Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuits Clean/Inspect Trap AssemblyInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Natural Gas Propane Set space heating operationConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationInstaller Access modesUser 1Control Panel Knight wall mount boiler control moduleCall for Heat Information Right Select no Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check all boiler wiring Check ignition ground wiringCheck control settings Check expansion tankCleaning boiler heat exchanger Check flame signalReview with owner Oiled bearing circulatorsPC Interface Diagrams2Wiring Diagram Page Page

51 specifications

Lochinvar 51 is an innovative and robust residential boiler system designed for high-efficiency heating needs. A popular choice among homeowners, the Lochinvar 51 stands out in the market due to its advanced features and eco-friendly technologies.

One of the main features of Lochinvar 51 is its compact design, making it ideal for installation in limited space environments such as attics or closets. Despite its small footprint, it boasts a powerful heating capacity, suitable for varying home sizes. The boiler operates with a modulating gas burner that allows it to adjust its heat output according to the demand, ensuring efficiency and comfort throughout the day.

The Lochinvar 51 employs a cutting-edge heat exchanger made from stainless steel, which is highly durable and resistant to corrosion. This design not only enhances the boiler's performance but also increases its lifespan. The unit offers impressive AFUE (Annual Fuel Utilization Efficiency) ratings, showcasing its capability to convert a significant portion of fuel into usable heat, thus minimizing energy waste and reducing heating costs.

Technologically, the Lochinvar 51 is equipped with advanced control systems that facilitate precise temperature management. The intuitive interface allows homeowners to easily set their desired temperature and monitor the system’s performance. Additionally, the integration of outdoor reset technology helps optimize energy consumption by adjusting the water temperature based on outside weather conditions, leading to further energy savings.

Safety features are also paramount in the Lochinvar 51. It includes built-in safeguards that monitor pressure and temperature, automatically shutting down the system in case of any irregularities. This not only protects the boiler but also ensures peace of mind for users.

Moreover, Lochinvar 51 supports compatibility with smart home systems, providing homeowners with remote control capabilities via mobile devices. This innovative feature enhances user convenience, allowing for easy adjustments and monitoring of the heating system from anywhere.

In conclusion, the Lochinvar 51 is an exceptional choice for homeowners looking for a reliable, efficient, and technologically advanced heating solution. With its impressive heating capacity, durable design, and innovative control features, it sets a high standard in residential boiler performance, making it a top contender in today’s market.