Lochinvar 51 Install vent and combustion air piping, Requirements for installation in Canada

Page 16

3General venting

Install vent and combustion air piping

The Knight wall mount boiler must be ￿ DANGER vented and supplied with combustion and

ventilation air as described in this section. Ensure the vent and air piping and the

Installation & Operation Manual

￿WARNING Insulation should not be used on PVC or CPVC venting materials. The use of

insulation will cause increased vent wall temperatures, which could result in vent pipe failure.

combustion air supply comply with these instructions regarding vent system, air system, and combustion air quality. See also Section 1 of this manual.

Inspect finished vent and air piping thoroughly to ensure all are airtight and comply with the instructions provided and

￿WARNING

For models 50 - 105 when transitioning from 2 to 3 inch vent diameter, a 2" pipe section and 2" to 3" increaser are required to be CPVC when PVC/CPVC vent is used.

For installations using 2" vent, the first seven (7) equivalent feet of vent must be CPVC (field supplied). See examples below.

with all requirements of applicable codes.

Failure to provide a properly installed vent and air system will cause severe personal injury or death.

Examples: 1. Seven (7) feet vertical

2.Connector + 90° elbow + 2 feet horizontal

3.One (1) foot vertical + 90° elbow + 1 foot horizontal

PVC/CPVC Vent piping materials

Requirements for installation in Canada

￿WARNING

NOTICE

￿WARNING

NOTICE

￿WARNING

Use only the materials listed in Table 3A for vent pipe, and fittings. Failure to comply could result in severe personal injury, death, or substantial property damage.

Installation must comply with local requirements and with the National Fuel Gas Code, ANSI Z223.1 for U.S. installations or CSA B149.1 for Canadian installations.

For closet and alcove installations, CPVC or stainless steel material MUST BE used in a closet/alcove structure. Failure to follow this warning could result in fire, personal injury, or death.

All PVC vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of a 1/4 inch per foot back to the boiler (to allow drainage of condensate).

This appliance requires a special venting system. The vent connection to the appliance must be made with the starter

1.Installations must be made with a vent pipe system certified to ULC-S636.

IPEX is an approved vent manufacturer in Canada supplying vent material listed to ULC-S636.

2.The first three (3) feet of plastic vent pipe from the appliance flue outlet must be readily accessible for visual inspection.

3.The components of the certified vent system must not be interchanged with other vent systems or unlisted pipe/fittings.

4.The 2" and 3" Concentric Vent Kits available from Lochinvar (see Section 4 – Sidewall Termination – Optional Concentric Vent) and the 2" and 3" Concentric Vent Kits available from IPEX are approved for use on the Knight wall mount boiler. Both kits are listed to the ULC-S636 standard for use in Canada.

￿CAUTION Improper installation of PVC or CPVC systems may result in injury or death.

Installing vent and air piping

CPVC pipe section provided with the appliance if PVC/CPVC vent is to be used. For stainless steel venting use an adapter from Table 3B (page 18) that corresponds

NOTICE

Use only cleaners, primers, and solvents that are approved for the materials which are joined together.

with the intended vent manufacturer to be used and discard the CPVC starter piece. The field provided vent fittings must be cemented to the CPVC pipe section using an “All Purpose Cement” suitable for PVC and CPVC pipe. Use only the vent materials, primer, and cement specified in this manual to make the vent connections. Failure to follow this warning could result in fire, personal injury, or death.

1.Work from the boiler to vent or air termination. Do not exceed the lengths given in this manual for the air or vent piping.

2.Cut pipe to the required lengths and deburr the inside and outside of the pipe ends.

3.Chamfer outside of each pipe end to ensure even cement distribution when joining.

4.Clean all pipe ends and fittings using a clean dry rag. (Moisture will retard curing and dirt or grease will prevent adhesion.)

16

Image 16
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchangerModels 51 Ratings Knight Wall Mount Boiler =B=R RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Vent and air pipingWall mounting location Prevent combustion air contaminationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Mounting the boiler Mounting to a concrete wallMounting to a metal studded wall Mounting to a wood studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Direct venting options Vertical Vent, Sidewall AirInstall vent and combustion air piping Requirements for installation in CanadaInstalling vent and air piping PVC/CPVC Vent piping materialsPVC/CPVC air intake/vent connections Air inlet pipe materialsApproved Stainless Steel Vent Manufacturers MakeStainless steel vent Boiler FlueBoiler Boiler Flue Intake Air AdapterStainless steel air intake/vent connections Removing from existing ventVent and air system Vent, air piping and terminationOptional room air Model Kit Number KIT30051 Air contaminationIf using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Vent Size2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Multiple vent/air terminationsSidewall termination optional concentric vent Sidewall termination installationDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletHydronic piping Near boiler piping components Near boiler piping connections Circulator sizingMinimum Pipe Pump Size Grundfos ModelArmstrong Variable speed pump setup Variable speed pump optionModel Grundfos UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Multiple Boilers Multiple Temperatures Model 8Single Boiler Zoned with Valves Model 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchFlow switch ThermostatAlarm contacts Wiring of the cascadeSystem supply sensor Boiler management systemInstallation Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemClean/Inspect Trap Assembly Check for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayInstaller Access modesUser Knight wall mount boiler control module 1Control PanelCall for Heat Information Right Select no Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check ignition ground wiring Check all boiler wiringCheck control settings Check expansion tankCheck flame signal Cleaning boiler heat exchangerReview with owner Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram Page Page

51 specifications

Lochinvar 51 is an innovative and robust residential boiler system designed for high-efficiency heating needs. A popular choice among homeowners, the Lochinvar 51 stands out in the market due to its advanced features and eco-friendly technologies.

One of the main features of Lochinvar 51 is its compact design, making it ideal for installation in limited space environments such as attics or closets. Despite its small footprint, it boasts a powerful heating capacity, suitable for varying home sizes. The boiler operates with a modulating gas burner that allows it to adjust its heat output according to the demand, ensuring efficiency and comfort throughout the day.

The Lochinvar 51 employs a cutting-edge heat exchanger made from stainless steel, which is highly durable and resistant to corrosion. This design not only enhances the boiler's performance but also increases its lifespan. The unit offers impressive AFUE (Annual Fuel Utilization Efficiency) ratings, showcasing its capability to convert a significant portion of fuel into usable heat, thus minimizing energy waste and reducing heating costs.

Technologically, the Lochinvar 51 is equipped with advanced control systems that facilitate precise temperature management. The intuitive interface allows homeowners to easily set their desired temperature and monitor the system’s performance. Additionally, the integration of outdoor reset technology helps optimize energy consumption by adjusting the water temperature based on outside weather conditions, leading to further energy savings.

Safety features are also paramount in the Lochinvar 51. It includes built-in safeguards that monitor pressure and temperature, automatically shutting down the system in case of any irregularities. This not only protects the boiler but also ensures peace of mind for users.

Moreover, Lochinvar 51 supports compatibility with smart home systems, providing homeowners with remote control capabilities via mobile devices. This innovative feature enhances user convenience, allowing for easy adjustments and monitoring of the heating system from anywhere.

In conclusion, the Lochinvar 51 is an exceptional choice for homeowners looking for a reliable, efficient, and technologically advanced heating solution. With its impressive heating capacity, durable design, and innovative control features, it sets a high standard in residential boiler performance, making it a top contender in today’s market.