Lochinvar 51 operation manual PVC/CPVC air intake/vent connections, Air inlet pipe materials, Make

Page 17

Installation & Operation Manual

3General venting (continued)

5.Dry fit vent or air piping to ensure proper fit up before assembling any joint. The pipe should go a third to two-thirds into the fitting to ensure proper sealing after cement is applied.

6.Priming and Cementing:

a.Handle fittings and pipes carefully to prevent contamination of surfaces.

b.Apply a liberal even coat of primer to the fitting socket.

c.Apply a liberal even coat of primer to the pipe end to approximately 1/2" beyond the socket depth.

d.Apply a second primer coat to the fitting socket.

Table 3A Vent Pipe, and Fittings

e.While primer is still wet, apply an even coat of approved cement to the pipe equal to the depth of the fitting socket.

f.While primer is still wet, apply an even coat of approved cement to the fitting socket.

g.Apply a second coat of cement to the pipe.

h.While the cement is still wet, insert the pipe into the fitting, if possible twist the pipe a 1/4 turn as you insert it. NOTE: If voids are present, sufficient cement was not applied and joint could be defective.

i.Wipe excess cement from the joint removing ring or beads as it will needlessly soften the pipe.

All vent pipe materials and fittings must comply with the following:

Item

 

Material

Standards for installation in:

 

 

 

 

 

 

United States

Canada

 

 

PVC schedule 40

ANSI/ASTM D1785

CPVC and PVC venting must be ULC-

 

 

 

 

S636 Certified. IPEX is an approved

 

 

PVC-DWV

ANSI/ASTM D2665

Vent pipe and fittings

 

manufacturer in Canada supplying vent

 

CPVC schedule 40/80

ANSI/ASTM F441

 

 

material listed to ULC-S636.

 

 

AL29-4C

UL1738

ULC-S636

Pipe cement/primer

 

PVC

ANSI/ASTM D2564

IPEX System 636

 

CPVC

ANSI/ASTM F493

Cements & Primers

 

 

 

 

NOTICE: DO NOT USE CELLULAR (FOAM) CORE PIPE

 

 

 

 

 

Approved Stainless Steel Vent Manufacturers

 

 

 

 

 

 

 

Make

 

Model

 

 

 

ProTech Systems (Simpson Dura-Vent Co.)

 

FasNSeal Vent / FasNSeal Flex* Vent

 

 

 

 

Z-Flex (Nova Flex Group)

 

 

Z-Vent

 

 

 

Heat Fab (Selkirk Corporation)

 

Saf-T Vent

 

 

 

 

 

*Use of FasNSeal Flex smooth inner wall vent is to be used in vertical or near vertical sections only, taking precaution to ensure no sagging occurs of the vent system. Connect to the FasNSeal rigid vent using specially designed adapters and sealing method, see manufacturer’s instructions.

PVC/CPVC air intake/vent connections

1.Combustion Air Intake Connector (FIG. 3-9) - Used to provide combustion air directly to the unit from outdoors. A fitting is provided on the unit for final connection. Combustion air piping must be supported per guidelines listed in the National Mechanical Code, Section 305, Table 305.4 or as local codes dictate.

2.Vent Connector (FIG. 3-9) - Used to provide a passageway for conveying combustion gases to the outside. A transition fitting is provided on the unit for final connection. Vent piping must be supported per the National Building Code, Section 305, Table 305.4 or as local codes dictate.

Air inlet pipe materials:

The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from the following list:

PVC, CPVC or ABS

Dryer Vent or Sealed Flexible Duct (not recommended for rooftop air inlet)

Galvanized steel vent pipe with joints and seams sealed as specified in this section.

Type “B” double-wall vent with joints and seams sealed as specified in this section.

AL29-4C, stainless steel material to be sealed to specification of its manufacturer.

*Plastic pipe may require an adapter (not provided) to transition between the air inlet connection on the appliance and the plastic air inlet pipe.

Figure 3-9Near Boiler PVC/CPVC Venting

VENT

AIR

17

Image 17
Contents Models 51 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight Wall Mount Boiler How it worksModels 51 Knight Wall Mount Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Vent and air piping Provide air openings to roomWall mounting location Prevent combustion air contaminationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet Mounting to a concrete wall Mounting the boilerMounting to a metal studded wall Mounting to a wood studded wallDirect venting options Sidewall Vent General ventingDirect venting options Vertical Vent, Sidewall Air Direct venting options Vertical VentRequirements for installation in Canada Install vent and combustion air pipingInstalling vent and air piping PVC/CPVC Vent piping materialsAir inlet pipe materials PVC/CPVC air intake/vent connectionsApproved Stainless Steel Vent Manufacturers MakeBoiler Flue Stainless steel ventBoiler Boiler Flue Intake Air AdapterRemoving from existing vent Stainless steel air intake/vent connectionsVent and air system Vent, air piping and terminationModel Kit Number KIT30051 Air contamination Optional room airSidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Vent Size2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrationsTermination and fittings Multiple vent/air terminationsDescription and usage Sidewall termination installationSidewall termination optional concentric vent Sidewall termination optional concentric vent models 8Concentric Vent Dimensional DrawingMultiventing sidewall terminations 10Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrationsVertical termination optional concentric vent Vertical termination installationMinimum Combustion AIR Typical Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric ventingAIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet Existing vent as a chaseHydronic piping Near boiler piping components Circulator sizing Near boiler piping connectionsArmstrong ModelMinimum Pipe Pump Size Grundfos Variable speed pump option Variable speed pump setupModel Grundfos UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Multiple Boilers Multiple Temperatures Model 8Single Boiler Zoned with Valves Model 10Single Boiler Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsLouver proving switch Outdoor temperature sensorFlow switch ThermostatWiring of the cascade Alarm contactsSystem supply sensor Boiler management systemInstallation Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuits Clean/Inspect Trap AssemblyInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationUser Access modesInstaller 1Control Panel Knight wall mount boiler control moduleCall for Heat Information Right Select no Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check all boiler wiring Check ignition ground wiringCheck control settings Check expansion tankCleaning boiler heat exchanger Check flame signalReview with owner Oiled bearing circulatorsPC Interface Diagrams2Wiring Diagram Page Page

51 specifications

Lochinvar 51 is an innovative and robust residential boiler system designed for high-efficiency heating needs. A popular choice among homeowners, the Lochinvar 51 stands out in the market due to its advanced features and eco-friendly technologies.

One of the main features of Lochinvar 51 is its compact design, making it ideal for installation in limited space environments such as attics or closets. Despite its small footprint, it boasts a powerful heating capacity, suitable for varying home sizes. The boiler operates with a modulating gas burner that allows it to adjust its heat output according to the demand, ensuring efficiency and comfort throughout the day.

The Lochinvar 51 employs a cutting-edge heat exchanger made from stainless steel, which is highly durable and resistant to corrosion. This design not only enhances the boiler's performance but also increases its lifespan. The unit offers impressive AFUE (Annual Fuel Utilization Efficiency) ratings, showcasing its capability to convert a significant portion of fuel into usable heat, thus minimizing energy waste and reducing heating costs.

Technologically, the Lochinvar 51 is equipped with advanced control systems that facilitate precise temperature management. The intuitive interface allows homeowners to easily set their desired temperature and monitor the system’s performance. Additionally, the integration of outdoor reset technology helps optimize energy consumption by adjusting the water temperature based on outside weather conditions, leading to further energy savings.

Safety features are also paramount in the Lochinvar 51. It includes built-in safeguards that monitor pressure and temperature, automatically shutting down the system in case of any irregularities. This not only protects the boiler but also ensures peace of mind for users.

Moreover, Lochinvar 51 supports compatibility with smart home systems, providing homeowners with remote control capabilities via mobile devices. This innovative feature enhances user convenience, allowing for easy adjustments and monitoring of the heating system from anywhere.

In conclusion, the Lochinvar 51 is an exceptional choice for homeowners looking for a reliable, efficient, and technologically advanced heating solution. With its impressive heating capacity, durable design, and innovative control features, it sets a high standard in residential boiler performance, making it a top contender in today’s market.