Lochinvar 51 operation manual Multiventing vertical terminations, Minimum Combustion AIR Typical

Page 30

Installation & Operation Manual

5Vertical direct venting

Vertical termination – optional concentric vent

￿WARNING

Do not operate the appliance with the rain cap removed or recirculation of combustion products may occur. Water may also collect inside the larger combustion air pipe and flow to the burner enclosure. Failure to follow this warning could result in product damage or improper operation, personal injury, or death.

CAUTION

DO NOT use field-supplied couplings to

extend pipes. Airflow restriction will occur.

 

6.

Install the rain cap and the small diameter pipe assembly

 

into the roof penetration assembly. Ensure the small

 

diameter pipe is cemented and bottomed in the Y

 

concentric fitting.

7.

Cement the appliance combustion air and vent pipes to the

 

concentric vent termination assembly. See FIG. 5-6 for

4.Install the Y concentric fitting pipe assembly through the structure’s hole and field supplied roof boot/flashing.

NOTICE

Do not allow insulation or other materials

to accumulate inside the pipe assembly

 

 

when installing through the hole.

5.Secure the assembly to the roof structure as shown below in FIG. 5-6 using field supplied metal strapping or equivalent support material.

Figure 5-6Concentric Vent Roof Installation

NOTICE

Ensure termination height is above the

roof surface or anticipated snow level (12

 

 

 

inches in U.S.A. or 18 inches in Canada) as

 

shown in FIG. 5-4, page 29.

 

If assembly is too short to meet height

NOTICE

requirement, the two (2) pipes supplied in

 

 

the kit may be replaced by using the same

 

diameter, field supplied SDR-26 PVC

 

(D2241) pipe. Do not extend dimension D

 

more than 60 inches (see FIG. 4-8, page 25).

proper pipe attachment.

8. Operate the appliance through one (1) heat cycle to ensure

combustion air and vent pipes are properly connected to

the concentric vent termination connections.

Multiventing vertical terminations

When two (2) or more direct vent appliances are vented near each other, each appliance must be individually vented (see FIG. 5-7). NEVER common vent or breach vent this appliance. When two (2) or more direct vent appliances are vented near each other, two (2) vent terminations may be installed as shown in FIG. 5-7. It is important that vent terminations be made as shown to avoid recirculation of flue gases.

Figure 5-7Concentric Vent and Combustion Air Vertical Termination

12”

MINIMUM

COMBUSTION

AIR (TYPICAL)

12” (18” FOR CANADA) MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL. MAXIMUM OF 24” ABOVE ROOF.

30

Image 30
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchangerModels 51 Ratings Knight Wall Mount Boiler =B=R RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Wall mounting location Provide air openings to roomVent and air piping Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Mounting to a metal studded wall Mounting the boilerMounting to a concrete wall Mounting to a wood studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Direct venting options Vertical Vent, Sidewall AirInstalling vent and air piping Install vent and combustion air pipingRequirements for installation in Canada PVC/CPVC Vent piping materialsApproved Stainless Steel Vent Manufacturers PVC/CPVC air intake/vent connectionsAir inlet pipe materials MakeBoiler Stainless steel ventBoiler Flue Boiler Flue Intake Air AdapterVent and air system Stainless steel air intake/vent connectionsRemoving from existing vent Vent, air piping and terminationOptional room air Model Kit Number KIT30051 Air contaminationVent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Vent Size2AClearance to Gravity Air Inlets Termination and fittings Prepare wall penetrationsPrepare wall penetrations Alternate Field Supplied Option Multiple vent/air terminationsSidewall termination installation Sidewall termination optional concentric ventDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletHydronic piping Near boiler piping components Near boiler piping connections Circulator sizingModel Minimum Pipe Pump Size GrundfosArmstrong Model Grundfos Variable speed pump setupVariable speed pump option UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Multiple Boilers Multiple Temperatures Model 8Single Boiler Zoned with Valves Model 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasNatural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsFlow switch Outdoor temperature sensorLouver proving switch ThermostatSystem supply sensor Alarm contactsWiring of the cascade Boiler management systemInstallation Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayAccess modes InstallerUser Knight wall mount boiler control module 1Control PanelCall for Heat Information Right Select no Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Check control settings Check ignition ground wiringCheck all boiler wiring Check expansion tankReview with owner Check flame signalCleaning boiler heat exchanger Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram Page Page

51 specifications

Lochinvar 51 is an innovative and robust residential boiler system designed for high-efficiency heating needs. A popular choice among homeowners, the Lochinvar 51 stands out in the market due to its advanced features and eco-friendly technologies.

One of the main features of Lochinvar 51 is its compact design, making it ideal for installation in limited space environments such as attics or closets. Despite its small footprint, it boasts a powerful heating capacity, suitable for varying home sizes. The boiler operates with a modulating gas burner that allows it to adjust its heat output according to the demand, ensuring efficiency and comfort throughout the day.

The Lochinvar 51 employs a cutting-edge heat exchanger made from stainless steel, which is highly durable and resistant to corrosion. This design not only enhances the boiler's performance but also increases its lifespan. The unit offers impressive AFUE (Annual Fuel Utilization Efficiency) ratings, showcasing its capability to convert a significant portion of fuel into usable heat, thus minimizing energy waste and reducing heating costs.

Technologically, the Lochinvar 51 is equipped with advanced control systems that facilitate precise temperature management. The intuitive interface allows homeowners to easily set their desired temperature and monitor the system’s performance. Additionally, the integration of outdoor reset technology helps optimize energy consumption by adjusting the water temperature based on outside weather conditions, leading to further energy savings.

Safety features are also paramount in the Lochinvar 51. It includes built-in safeguards that monitor pressure and temperature, automatically shutting down the system in case of any irregularities. This not only protects the boiler but also ensures peace of mind for users.

Moreover, Lochinvar 51 supports compatibility with smart home systems, providing homeowners with remote control capabilities via mobile devices. This innovative feature enhances user convenience, allowing for easy adjustments and monitoring of the heating system from anywhere.

In conclusion, the Lochinvar 51 is an exceptional choice for homeowners looking for a reliable, efficient, and technologically advanced heating solution. With its impressive heating capacity, durable design, and innovative control features, it sets a high standard in residential boiler performance, making it a top contender in today’s market.