Lochinvar 400-801 operation manual Prepare boiler, Remove boiler from wood pallet

Page 10

Outdoor Knight XL Installation & Operation Manual

2 Prepare boiler

Remove boiler from wood pallet

1.After removing the outer shipping carton from the boiler, remove the parts box.

2.Remove the front door to access the lag bolts in front of the unit (FIG. 2-1).

3.To remove the boiler from the pallet (after removing the front door):

a.Remove the two lag bolts from the wood pallet inside the boiler (FIG. 2-1).

b.Detach the boiler from the lag bolts in the rear of the unit, see FIG. 2-1.

NOTICE

Do not drop the boiler or bump the

jacket on the floor or pallet. Damage to

 

the boiler can result.

Figure 2-1Boiler Mounted on Shipping Pallet

Install flue pipe assembly

Models 400 - 601

This unit is provided with all of the necessary venting components. All components must be installed prior to operation.

1.Locate all venting components from the installation kit and carton.

2.Before connecting the vent pipe sections or components, verify that the gasket is seated evenly inside the groove in the female end of the elbow and flue adaptor (FIG. 2-2).

3.Remove the provided screws from the vent cover and use them to install the vent strap (FIG. 2-2).

4.Insert the elbow into flue adaptor (FIG. 2-2).

￿ CAUTION

Do NOT use grease or other lubricant

on the vent seals. Only water may be

 

used for this purpose. Grease or other

 

lubricant can make the seal brittle or

 

cause tearing of the seal surface which

 

can result in flue gas leakage.

5.Slide the vent pipe through the wall strap and insert it into the elbow (FIG. 2-2).

6.Install the bird screen into the top of the vent.

Figure 2-2Install flue pipe assembly - Models 400 - 601

. 2

WALL STRAP

AND SCREWS

BIRD SCREEN

VENT PIPE

ELBOW

IMG00444

FLUE

ADAPTER

NOTE: VERIFY THAT GASKET IS SEATED EVENLY

INSIDE THE GROOVE IN ELBOW AND ADAPTER

10

Image 10 Contents
Outdoor Knight XL Models 400 Contents When servicing boiler Please read before proceedingOutdoor Knight XL How it works Stainless steel heat exchangerModel Models 601 Ratings Outdoor Knight XL Boiler Ahri RatingDetermine boiler location Installation must comply withBefore locating the boiler, check Flooring and foundation Provide clearancesOutdoor vent / air intake location Prevent combustion air contaminationPrepare boiler Install flue pipe assembly Models 400Remove boiler from wood pallet 3Install flue pipe assembly Models 701 Models 7014Installing Propane Orifice Model Gas conversions ModelModels 601 Leveling the boilerHydronic piping TEE with 1 Fitting on TOP Nipple Close Nipple Flow switch adjustment Near boiler piping componentsCirculator sizing Near boiler piping connectionsVariable speed pump option Pressure Head Feet20F 25F 30F 35F Model 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Number of Units Manifold Pipe Sizes in Inches mm10Multiple Boilers Primary/Secondary Piping Temperature Wires to Loop Sensors 120VAC to Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply InchesGas valve replacement Gas pressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsLow gas pressure switch Outdoor temperature sensorHigh gas pressure switch ThermostatWiring of the cascade Flow switchAlarm contacts ModBus3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade How the boiler operates Operating informationGeneral How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Outdoor Knight XL control module Access modesInstaller UserCall for Heat Information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Inspect ignition and flame sense electrodesReview with owner Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionDiagrams High Voltage2Ladder Diagram