Lochinvar 400-801 operation manual Hydronic piping

Page 14

3 Hydronic piping

System water piping methods

The Outdoor Knight XL is designed to function in a closed loop pressurized system not less than 12 psi (83 kPa). A temperature and pressure gauge is included to monitor system pressure and outlet temperature and should be located on the boiler outlet.

It is important to note that the boiler has a minimal amount of pressure drop which must be figured in when sizing the circulators. Each boiler installation must have an air elimination device, which will remove air from the system. Install the boiler so the gas ignition system components are protected from water (dripping, spraying, etc.) during appliance operation or basic service of circulator replacement, valves, and others.

Observe a minimum of 1/4 inch (6 mm) clearance around all un-insulated hot water pipes when openings around the pipes are not protected by non-combustible materials.

Low water cutoff device

On a boiler installed above radiation level, some states and local codes require a low water cutoff device at the time of installation.

Chilled water system

If the boiler supplies hot water to heating coils in air handler units, flow control valves or other devices must be installed to prevent gravity circulation of heater water in the coils during the cooling cycle. A chilled water medium must be piped in parallel with the heater.

Freeze protection

Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attacking the metallic system components. Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution. Allowance should be made for the expansion of the glycol solution in the system piping.

￿WARNING Use only inhibited propylene glycol solutions, which are specifically formulated

for hydronic systems. Ethylene glycol is toxic and can attack gaskets and seals used in hydronic systems.

14

Outdoor Knight XL Installation & Operation Manual

General piping information

Basic steps are listed below along with illustrations on the following pages (FIG.’s 3-7 through 3-11), which will guide you through the installation of the Outdoor Knight XL (reference FIG.’s 3-4A and 3-4B).

1.Connect the system return marked “Inlet”.

2.Connect the system supply marked “Outlet”.

3.Install purge and balance valve or shutoff valve and drain on system return to purge air out of each zone.

4.Install a backflow preventer on the cold feed make-up water line.

5.Install a pressure reducing valve on the cold feed make-up water line, (15 psi (103 kPa) nominal). Check temperature and pressure gauge (shipped separately), which should read a minimum pressure of 12 psi (83 kPa).

6.Consult the factory for a pump and/or pump cover. If a field-supplied pump is used, install per the manufacturer’s specifications in regard to indoor or outdoor location. An outdoor rated pump is recommended.

7.Install a circulator as shown on the piping diagrams in this section. Make sure the circulator is properly sized for the system and friction loss.

8.Install an expansion tank on the system supply. Consult the tank manufacturer’s instruction for specific information relating to tank installation. Size the expansion tank for the required system volume and capacity.

9.Install an air elimination device on the system supply.

10.Install a drain valve at the lowest point of the system. Note: The boiler cannot be drained completely of water without purging the unit with an air pressure of 15 psi (103 kPa).

11.This appliance is supplied with a relief valve sized in accordance with ASME Boiler and Pressure Vessel Code, Section IV (“Heating Boilers”). Pipe the discharge of the safety relief valve to prevent injury in the event of pressure relief. Pipe the discharge to a drain. Provide piping that is the same size as the safety relief valve outlet. Never block the outlet of the safety relief valve.

￿ WARNING

The relief valve, tee and any other necessary

 

fittings are shipped in the install kit with the

 

boiler and are to be field installed (FIG.’s

 

3-1 and 3-2).

12.On any pre-existing system, it is good practice to install a field supplied strainer to prevent damage to the heat exchanger.

See the piping illustrations included in this section, FIG.’s 3-7 and 3-11 for suggested guidelines in piping the Outdoor Knight XL.

NOTICE

Please note that these illustrations are

meant to show system piping concept only,

 

 

the installer is responsible for all equipment

 

and detailing required by local codes.

Image 14
Contents Outdoor Knight XL Models 400 Contents When servicing boiler Please read before proceedingOutdoor Knight XL How it works Stainless steel heat exchangerModel Models 601 Ratings Outdoor Knight XL Boiler Ahri RatingBefore locating the boiler, check Installation must comply withDetermine boiler location Flooring and foundation Provide clearancesOutdoor vent / air intake location Prevent combustion air contaminationRemove boiler from wood pallet Install flue pipe assembly Models 400Prepare boiler 3Install flue pipe assembly Models 701 Models 7014Installing Propane Orifice Model Gas conversions ModelModels 601 Leveling the boilerHydronic piping TEE with 1 Fitting on TOP Nipple Close Nipple Flow switch adjustment Near boiler piping componentsVariable speed pump option Near boiler piping connectionsCirculator sizing 20F 25F 30F 35F Model Head FeetPressure 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Number of Units Manifold Pipe Sizes in Inches mm10Multiple Boilers Primary/Secondary Piping Temperature Wires to Loop Sensors 120VAC to Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply InchesGas valve replacement Gas pressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsLow gas pressure switch Outdoor temperature sensorHigh gas pressure switch ThermostatWiring of the cascade Flow switchAlarm contacts ModBus3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation How the boiler operates Operating informationGeneral How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Outdoor Knight XL control module Access modesInstaller UserCall for Heat Information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Inspect ignition and flame sense electrodesReview with owner Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionDiagrams High Voltage2Ladder Diagram
Related manuals
Manual 48 pages 50.5 Kb

400-801 specifications

The Lochinvar 400-801 is a high-efficiency commercial boiler that embodies advanced engineering and cutting-edge technology. Designed for a variety of commercial applications, this boiler is known for its reliability, efficiency, and robust performance.

One of the standout features of the Lochinvar 400-801 is its high thermal efficiency, which can reach up to 99%. This efficiency not only reduces fuel consumption but also lowers operating costs, making it an economical choice for businesses seeking to minimize overhead. The boiler employs a stainless steel fire-tube heat exchanger that ensures optimal heat transfer and durability. This construction allows for enhanced resistance to corrosion, thereby extending the boiler's lifespan.

The Lochinvar 400-801 is equipped with advanced control technologies that enhance its performance. With its built-in SMART SYSTEM control, users can easily monitor and manage the boiler’s operations, optimizing performance while ensuring ease of use. This control system features a user-friendly interface that provides real-time data, including temperature settings, pressure readings, and operational status, allowing for quick diagnostics and efficient troubleshooting.

Safety is paramount in the design of the Lochinvar 400-801. The boiler includes a comprehensive safety system that incorporates multiple safety interlocks and a venting system that prevents backflow and ensures safe exhaust. Moreover, the unit is designed to operate with minimal noise, making it suitable for environments where noise reduction is crucial.

Installation and maintenance of the Lochinvar 400-801 are straightforward, thanks to its compact design and multiple venting options. The low-profile construction allows for flexibility in placement, making it an ideal fit for tight spaces. Maintenance tasks are simplified with accessible components, minimizing downtime and ensuring the system operates efficiently over its lifespan.

In conclusion, the Lochinvar 400-801 stands out in the commercial boiler market with its blend of efficiency, reliability, and innovation. With its advanced technologies and features, businesses can achieve significant energy savings while ensuring comfortable and consistent heat for various applications. The Lochinvar 400-801 is an investment in quality and performance, backed by a well-established brand in the heating industry. Whether for a new installation or a replacement, this boiler offers a comprehensive solution for commercial heating needs.