Lochinvar Boiler Piping Diagrams and Flow Switch Adjustments for Optimal Performance

Page 16

3 Hydronic piping

Flow switch adjustment

Refer to Table 3A for the proper setting of the sensitivity screw. For reference, the position of the screw prior to setting should be turned clockwise with a Phillips driver until it stops (FIG. 3-3). Proceed to turn the screw counterclockwise the amount of turns listed in Table 3A based on the model.

Consult the manufacturer’s instructions for wiring the flow switch to your system.

Table 3A Paddle Size / Sensitivity Screw Adjustment

MODEL

PADDLE SIZE

SENSITIVITY SCREW

ADJUSTMENT

 

 

 

 

Note: Paddles are included with the flow switch.

400

#3

 

7½ turns

501

#3

 

5½ turns

601

#3

 

7¼ turns

701

#3

 

5¼ turns

801

#3

 

3¼ turns

 

 

Turn the

sensitivity screw clockwise to

NOTICE

 

 

increase the flow rate required to activate

 

 

the switch. Turn the sensitivity screw

 

 

counterclockwise to decrease the flow rate

 

 

required to activate the switch.

Figure 3-3Flow Switch Adjustment

NORMALLY

OPEN

SENSITIVITY

ADJUSTMENT

GROUND

COMMON NORMALLY

CLOSED

16

Outdoor Knight XL Installation & Operation Manual

Near boiler piping components

1.Boiler system piping:

Boiler system piping MUST be sized per the pipe requirements listed in Table 3B. Reducing the pipe size can restrict the flow rate through the boiler, causing inadvertent high limit shutdowns and poor system performance. Flow rates are based on 20 feet (6 m) of piping, 4 - 90° elbows, and 2 - fully ported ball valves.

2.Boiler system circulating pump:

(Field supplied.) The boiler circulating pump should be based on 20 feet (6 m) of piping, 4 - 90° elbows, and 2 - fully ported ball valves.

3.Domestic hot water circulating pump:

(Field supplied.) The pump MUST be sized to meet the specified minimum flow requirements listed in FIG.’s 3-5 and 3-6. Consult the indirect water heater operating guide to determine flow characteristics for the selected product used.

4.Variable speed boiler system circulator:

Outdoor Knight XL boilers are capable of controlling a variable speed boiler system circulator. Variable speed circulators MUST be sized to meet the specified minimum flow requirements listed in FIG.’s 3-5 and 3-6 on page 16 at full speed.

5.Boiler isolation valves:

Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler.

6.Check valves:

Field supplied. Check valves are recommended for installation as shown in FIG.’s 3-7 through 3-11. Failure to install check valves could result in a reverse flow condition during pump(s) off cycle.

7.Domestic indirect hot water isolation valves:

Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler.

8.Anti-scald mixing valve:

Field supplied. An anti-scald mixing valve is recommended when storing domestic hot water above 115°F (46°C).

9.Unions:

Field supplied. Recommended for unit serviceability.

10.Temperature and pressure gauge:

Factory supplied. The temperature and pressure gauge is shipped loose. It is the responsibility of the contractor to install the temperature and pressure gauge on the boiler water outlet.

11.Pressure relief valve:

Factory supplied. The pressure relief valve is sized to ASME specifications.

Image 16 Contents
Outdoor Knight XL Models 400 Contents When servicing boiler Please read before proceedingOutdoor Knight XL How it works Stainless steel heat exchangerModel Models 601 Ratings Outdoor Knight XL Boiler Ahri RatingDetermine boiler location Installation must comply withBefore locating the boiler, check Provide clearances Outdoor vent / air intake locationFlooring and foundation Prevent combustion air contaminationPrepare boiler Install flue pipe assembly Models 400Remove boiler from wood pallet 3Install flue pipe assembly Models 701 Models 7014Installing Propane Orifice Model Gas conversions ModelModels 601 Leveling the boilerHydronic piping TEE with 1 Fitting on TOP Nipple Close Nipple Flow switch adjustment Near boiler piping componentsCirculator sizing Near boiler piping connectionsVariable speed pump option Pressure Head Feet20F 25F 30F 35F Model 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Number of Units Manifold Pipe Sizes in Inches mm10Multiple Boilers Primary/Secondary Piping Temperature Wires to Loop Sensors 120VAC to Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply InchesGas valve replacement Gas pressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor High gas pressure switchLow gas pressure switch ThermostatFlow switch Alarm contactsWiring of the cascade ModBus3Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade Operating information GeneralHow the boiler operates How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Access modes InstallerOutdoor Knight XL control module UserCall for Heat Information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Flue vent system and air piping Check water systemCheck expansion tank Check boiler relief valveCheck ignition ground wiring Check all boiler wiringCheck control settings Inspect ignition and flame sense electrodesCheck flame signal Cleaning boiler heat exchangerReview with owner Model Kit Part Component Number DescriptionDiagrams High Voltage2Ladder Diagram