2 Prepare boiler

Gas conversions

￿WARNING

Model 400

For a boiler already installed, you must turn off gas supply, turn off power and allow boiler to cool before proceeding. You must also completely test the boiler after conversion to verify performance as described under Start-up, Section 10 of this manual. Failure to comply could result in severe personal injury, death, or substantial property damage.

For the 400 Model you must install a propane orifice to operate the Outdoor Knight XL on propane gas. Verify when installing that the orifice size marking matches boiler size (Model 400 - 8.0 LP orifice stamping).

Models 501 - 801 do not require an orifice installation for propane operation, but they will require a valve adjustment.

￿WARNING After converting to LP, check combustion per the Start-up procedure in Section 10

of this manual. Failure to check and verify combustion could result in severe personal injury, death, or substantial property damage.

Model 400: Inspect the O-ring when the ￿ DANGER blower is disassembled. The O-ring must

be in good condition and must be installed. Failure to comply will cause a gas leak, resulting in severe personal injury or death.

Figure 2-4Installing Propane Orifice - Model 400

BLOWER

O-RING VENTURI

SCREWS

QTY. 3

1.Remove the top and front access covers from the unit (tools required for removal).

2.Remove the three screws securing the venturi to the blower. Note: When separating the venturi from the blower, take care not to damage the O-ring inside the blower (FIG. 2-4).

3.Remove the four star-drive screws securing the gas valve to the venturi (FIG. 2-4).

4.Locate the propane orifice disk from the conversion kit bag.Verify that the stamping on the orifice disk matches the boiler size (Model 400 - 8.0 LP orifice stamping).

5.Remove the existing orifice from the O-ring in the side of the gas valve and replace it with the orifice from the kit. Position and secure the orifice in the valve as shown in FIG. 2-4.

6.Reposition the gas valve against the venturi and replace the star-drive screws (FIG. 2-4) securing the valve to the venturi.

7.Inspect the O-ring inside the blower. Handle the O-ring with care, do not damage. Reposition the venturi against the blower and replace the screws securing the venturi to the blower (FIG. 2-4).

8.After installation is complete, attach the propane conversion label (in the conversion kit bag) next to the boiler rating plate. Attach the LP caution label (in the conversion kit bag) to the left side of the unit in the lower left corner.

9.Replace the top and front access covers.

SCREWS O-RING

QTY. 4

BRASS ORIFICE

GAS VALVE

12

Image 12 Contents
Outdoor Knight XL Models 400 Contents When servicing boiler Please read before proceedingOutdoor Knight XL How it works Stainless steel heat exchangerModel Models 601 Ratings Outdoor Knight XL Boiler Ahri RatingInstallation must comply with Determine boiler locationBefore locating the boiler, check Provide clearances Outdoor vent / air intake locationFlooring and foundation Prevent combustion air contaminationInstall flue pipe assembly Models 400 Prepare boilerRemove boiler from wood pallet 3Install flue pipe assembly Models 701 Models 7014Installing Propane Orifice Model Gas conversions ModelModels 601 Leveling the boilerHydronic piping TEE with 1 Fitting on TOP Nipple Close Nipple Flow switch adjustment Near boiler piping componentsNear boiler piping connections Circulator sizingVariable speed pump option Head Feet Pressure20F 25F 30F 35F Model 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Number of Units Manifold Pipe Sizes in Inches mm10Multiple Boilers Primary/Secondary Piping Temperature Wires to Loop Sensors 120VAC to Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply InchesGas valve replacement Gas pressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor High gas pressure switchLow gas pressure switch ThermostatFlow switch Alarm contactsWiring of the cascade ModBus3Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneVerify DHW mode Set domestic hot water DHW operationConfiguration of the cascade Operating information GeneralHow the boiler operates How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Access modes InstallerOutdoor Knight XL control module UserCall for Heat Information Dial Function Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Flue vent system and air piping Check water systemCheck expansion tank Check boiler relief valveCheck ignition ground wiring Check all boiler wiringCheck control settings Inspect ignition and flame sense electrodesCheck flame signal Cleaning boiler heat exchangerReview with owner Model Kit Part Component Number DescriptionDiagrams High Voltage2Ladder Diagram