Lochinvar 1, 000 through 2 warranty

Page 80

Revision Notes: Rev. 4 (IFB/IFW-i&s-04) reflects additional text on Page 39, changes made to Figures 47 & 48, Table AA (Page 51), and LBLs on Pages 77-79.

Revision 5 (ECO #C02870) reflects changes made to the scald section, pages 70, 73, and 75, the addition of a mixing valve to the piping diagrams (FIG’s 83 - 86), edits made to FIG. 80 (pg. 66), and a title change on FIG.’s 3 and 4 on page 4.

80

1/09-Printed in U.S.A.

 

Image 80 Contents
IFB/IFW-i&s-05 WarrantySpecial Instructions To Owner Table of Contents Checking Equipment Do notWhat to do if YOU Smell GAS Owner WarningInstallation Procedure Location of Unit Recommended Service ClearancesTable a Clearances from Combustible ConstructionCombustion Air Direct from Outside Table B Minimum Recommended CombustionAIR Supply to Mechanical Room 500 in2 3226 cm2 667 in2 4303 cm2 000 in2 12,903 cm2Construction AIR Filter Construction Air FilterConstruction AIR Filter Kits Table C VentingTable D Category IV Flue Pipe SizesCategory IV Positive Pressure Venting System Category IV VentingCategory IV Flue Pipe Materials Venting Guidelines for a Category IV VentExceed a maximum of 100 equivalent feet 30.5 m in length Drain Tee InstallationGeneral Category IV Vent Termination Clearances Masonry Chimney Installations Vertical Venting TerminationsSidewall Venting Terminations Table ESidewall Vent Cap Kits Sidewall VentLocation of a Sidewall Vent Termination Direct Vent INTELLI-VENT SystemsTable F Direct Vent and Intelli-Vent Flue Air Inlet Pipe SizesAir Inlet Length of Air Inlet PipeVertical Direct Vent Systems Combined Combustion Air Inlet PointsMultiple Vertical Direct Vent Installations Horizontal Direct VentLocation of a Sidewall Air Inlet Cap Sidewall Combustion AIR InletTable G Multiple Horizontal Direct Vent Installations These areTable H Combined Air Inlet PointsMaximum Length of an Intelli-Vent System Air Inlet Sidewall Input Flue Pipe Btu/hr SizeHorizontal INTELLI-VENT with Vertical Combustion AIR Air Inlet Sidewall Input Flue PipeBtu/hr Size Cap Kit 500,000 SVK3026Vertical Combustion Horizontal INTELLI-VENT AIR Inlet Location of a Rooftop Air Inlet CapTable J GAS Supply GAS Pressure Test Table KGAS Connection Table LRecommended Gas Pipe Size Single Appliance Installations Multiple Appliance Installations Gas Pipe Size ChartTable M Table NGAS Manifold Pressure Adjustment Install Piping to ControlGAS Piping Checking GAS Supply PressureChecking Manifold GAS Pressure Water Connections Water ConnectionsMinimum Pipe Size Requirements Secondary Heat Exchanger Primary Heat ExchangerInlet and Outlet Connections Integral Bypass Bypass Valve SynchronizationBypass Piping Assembly Integral CirculatorOptional Intermittent Pump Operation Bypass Initial Set-up of Maximum Water FlowMinimum Water Temperatures Btu/hr Input Temperature RiseTable P Bypass OperationWater Flow Switch Table QLOW Water Cutoff GAS Train and ControlsRelief Valve Diaphragm GAS Valve Ratio GAS ValveJacket Assembly Electrical ConnectionsAccess to Components and Controls Front Control Panel LocationsVariable Frequency Drive Transformer and Relay LocationsExcel High GAS Pressure Switch LOW GAS Pressure Switch OptionalLOW AIR Pressure Switch Be used as a diagnostic indicator Temperature Adjustment Default Values Pre-programmed in the ExcelTable S To Activate the Manual OverridePassword Function Configuring Command DisplayTable T Display Default Values Accessing the SIX Changeable Points from Command DisplayCalculated Set Point Total Run TimeSet Point Temp Sequencing TypeCommand Display Data Screen Status Points Table UStatus Point Operational Modes Hot Surface Igniter OnOutdoor Reset Function Selections Optional on Heating Boilers OnlyMultiple Appliance Installations Efficiency Optimized with Time EqualizationTable W Singly Terminated FTT Network Bus Topology SpecificationsInterfacing Multiple Appliances Wire Termination for E-Bus Connection Additional Components Used to Interface Multiple AppliancesHigh Water Temperature Limit Control Typical Building Management System DiagramIgnition Module Lockout Functions Service PartsHOT Surface Ignition System Diagnostic Status Indication Table YIgnition and Control Timings Table ZOPERATION/DIAGNOSTIC LIGHTS, Resets and Switches IndicatorBurner Table AACombustion AIR Blower Combustion Air Blower and Transition ChamberCondensate Management System OptionalTable BB Condensate Drain Location On RearReplenishing the Neutralizer Condensate TestingCondensate Trap Installation Install Condensate Trap Lighting InstructionsTo Turn OFF GAS to Appliance Ignition System CheckoutSequence of Operation Heat Transfer ProcessMaintenance End of SequenceBurner Removal and Cleaning Burner MaintenanceBurner Cleaning Procedure Location of Primary Heat ExchangerSecondary Heat Exchanger Inspection Lubrication Freeze Protection Heating Boiler Installations Freeze Protection for a Heating Boiler System If RequiredWater Treatment Water Connections Heating Boilers onlyPrimary Loop Circulator Pump Specifications Piping LengthsBoiler Circulator Pump Limitations Circulator Pump OperationMinimum Boiler Water Temperatures PRIMARY/SECONDARY Boiler PipingBoiler Temperature Rise Chart Table DD Table CCMaximum Flow for Heating Boiler Btu/hr Input Maximum FlowPlacing the Boiler Operation TEMPERATURE/PRESSURE GaugeTypical Heating Boiler Installations Boiler Operation Installation with a Chilled Water SystemBoiler Operating Temperature Control Water Velocity Control Typical Water Heater Piping with Storage TankMaximum Flow Rate Btu/hr Input Table EETable FF Water Chemistry Piping Multiple Unit Installations Single Water Heater Piping with Two Storage TanksTable GG Pump OperationHeat Exchanger Common ManifoldThermostat Settings Table HHCathodic Protection Optional Relief ValveThermal Expansion Ladder Diagram PWM Wiring Diagram
Related manuals
Manual 20 pages 6.19 Kb Manual 16 pages 33.86 Kb Manual 56 pages 36.01 Kb Manual 56 pages 40.75 Kb