Combined Air Inlet Points

The air inlet pipes from multiple appliances installed with an Intelli-Vent system can be combined to a single common connection based on the cross sectional area of the common pipe as defined in the Direct Vent basic information section.

Maximum Length of an Intelli-Vent System

The maximum installed length of the air inlet pipe from the appliance to the air inlet cap is 100 equivalent feet (30.5 m) in length. The maximum installed length of the flue pipe from the appliance to the termination cap is 100 equivalent feet (30.5 m) in length. Subtract 5 feet (1.52 m) of equivalent length for each 90° elbow installed in either the flue pipe or the air inlet pipe.

Subtract 2 1/2 feet (0.7 m) of equivalent length for each 45° elbow installed in either the flue pipe or the air inlet pipe.

VERTICAL INTELLI-VENT WITH SIDEWALL COMBUSTION AIR

FIG. 27 Vertical Intelli-Vent Installation - Sidewall Combustion Air Inlet

Intelli-Vent systems are installed with a Category IV flue and a separate combustion air pipe to the outdoors. The Vertical Intelli-Vent system terminates the flue at the rooftop and air inlet at the sidewall. The flue outlet and combustion air intake terminates in different pressure zones.

Follow all requirements in the General Category IV Venting sections for proper installation and venting of flue products vertically to the outdoors. All other general installation requirements must be followed.

The Intelli-Vent system requires the installation of an additional pipe to supply combustion air from outdoors directly to the appliance.

Termination point for the flue products must follow the clearance requirements in the Vertical Vent Termination section of the Category IV Venting.

CAUTION￿

Appliances that are shut down or will not operate may experience freezing due to convective airflow in the air inlet pipe connected to the appliance.

SIDEWALL COMBUSTION

AIR INLET

FIG. 28 Air Inlet Cap for Sidewall Termination

The air inlet cap for the sidewall air inlet must be purchased from the appliance manufacturer.

The part numbers for the required sidewall air inlet cap kit are listed by unit size. The appliance manufacturer, in accordance with CSA requirements, must furnish the sidewall air inlet cap. Each kit includes the special combustion air inlet cap for installation on an exterior sidewall.

TABLE - H

 

 

 

 

Air Inlet

 

Sidewall

Input

 

Flue

 

Pipe

 

Air Inlet

Btu/hr

 

Size

 

Size

 

Cap Kit

 

 

 

 

 

 

 

1,500,000

 

6"

 

6"

 

SAK3000

___________

 

___________

 

___________

 

___________

1,700,000

 

7"

 

7"*

 

SAK3001

___________

 

___________

 

___________

 

___________

2,000,000

 

8"

 

8"

 

SAK3002

 

 

 

 

 

 

 

*Piping from the appliance to the air inlet cap may be either 7" or 8" connecting to an 8" sidewall cap provided in the kit.

19

Image 19 Contents
Special Instructions To Owner WarrantyIFB/IFW-i&s-05 Table of Contents Owner Warning Checking EquipmentDo not What to do if YOU Smell GASClearances from Combustible Construction Installation Procedure Location of UnitRecommended Service Clearances Table aCombustion Air Direct from Outside 500 in2 3226 cm2 667 in2 4303 cm2 000 in2 12,903 cm2 Table BMinimum Recommended Combustion AIR Supply to Mechanical RoomConstruction Air Filter Construction AIR FilterCategory IV Flue Pipe Sizes Construction AIR Filter Kits Table CVenting Table DVenting Guidelines for a Category IV Vent Category IV Positive Pressure Venting SystemCategory IV Venting Category IV Flue Pipe MaterialsGeneral Category IV Vent Termination Clearances Drain Tee InstallationExceed a maximum of 100 equivalent feet 30.5 m in length Vertical Venting Terminations Masonry Chimney InstallationsSidewall Vent Sidewall Venting TerminationsTable E Sidewall Vent Cap KitsDirect Vent INTELLI-VENT Systems Location of a Sidewall Vent TerminationLength of Air Inlet Pipe Table FDirect Vent and Intelli-Vent Flue Air Inlet Pipe Sizes Air InletCombined Combustion Air Inlet Points Vertical Direct Vent SystemsHorizontal Direct Vent Multiple Vertical Direct Vent InstallationsTable G Sidewall Combustion AIR InletLocation of a Sidewall Air Inlet Cap These are Multiple Horizontal Direct Vent InstallationsAir Inlet Sidewall Input Flue Pipe Btu/hr Size Table HCombined Air Inlet Points Maximum Length of an Intelli-Vent System500,000 SVK3026 Horizontal INTELLI-VENT with Vertical Combustion AIRAir Inlet Sidewall Input Flue Pipe Btu/hr Size Cap KitLocation of a Rooftop Air Inlet Cap Vertical Combustion Horizontal INTELLI-VENT AIR InletTable J Table L GAS Supply GAS Pressure TestTable K GAS ConnectionTable N Recommended Gas Pipe Size Single Appliance InstallationsMultiple Appliance Installations Gas Pipe Size Chart Table MChecking GAS Supply Pressure GAS Manifold Pressure AdjustmentInstall Piping to Control GAS PipingChecking Manifold GAS Pressure Water Connections Water ConnectionsInlet and Outlet Connections Secondary Heat Exchanger Primary Heat ExchangerMinimum Pipe Size Requirements Bypass Valve Synchronization Integral BypassBypass Initial Set-up of Maximum Water Flow Bypass Piping AssemblyIntegral Circulator Optional Intermittent Pump OperationBypass Operation Minimum Water TemperaturesBtu/hr Input Temperature Rise Table PGAS Train and Controls Water Flow SwitchTable Q LOW Water CutoffDiaphragm GAS Valve Ratio GAS Valve Relief ValveElectrical Connections Jacket AssemblyFront Control Panel Locations Access to Components and ControlsTransformer and Relay Locations Variable Frequency DriveLOW AIR Pressure Switch High GAS Pressure Switch LOW GAS Pressure Switch OptionalExcel Be used as a diagnostic indicator To Activate the Manual Override Temperature AdjustmentDefault Values Pre-programmed in the Excel Table SAccessing the SIX Changeable Points from Command Display Password FunctionConfiguring Command Display Table T Display Default ValuesSequencing Type Calculated Set PointTotal Run Time Set Point TempCommand Display Data Screen Hot Surface Igniter On Status PointsTable U Status Point Operational ModesOptional on Heating Boilers Only Outdoor Reset Function SelectionsEfficiency Optimized with Time Equalization Multiple Appliance InstallationsInterfacing Multiple Appliances Singly Terminated FTT Network Bus Topology SpecificationsTable W Additional Components Used to Interface Multiple Appliances Wire Termination for E-Bus ConnectionTypical Building Management System Diagram High Water Temperature Limit ControlHOT Surface Ignition System Service PartsIgnition Module Lockout Functions Table Z Diagnostic Status IndicationTable Y Ignition and Control TimingsTable AA OPERATION/DIAGNOSTIC LIGHTS, Resets and SwitchesIndicator BurnerCombustion Air Blower and Transition Chamber Combustion AIR BlowerCondensate Drain Location On Rear Condensate ManagementSystem Optional Table BBCondensate Trap Installation Condensate TestingReplenishing the Neutralizer Lighting Instructions Install Condensate TrapIgnition System Checkout To Turn OFF GAS to ApplianceHeat Transfer Process Sequence of OperationEnd of Sequence MaintenanceBurner Maintenance Burner Removal and CleaningLocation of Primary Heat Exchanger Burner Cleaning ProcedureSecondary Heat Exchanger Inspection Lubrication Freeze Protection Water Connections Heating Boilers only Heating Boiler InstallationsFreeze Protection for a Heating Boiler System If Required Water TreatmentCirculator Pump Operation Primary Loop Circulator Pump SpecificationsPiping Lengths Boiler Circulator Pump LimitationsPRIMARY/SECONDARY Boiler Piping Minimum Boiler Water TemperaturesBtu/hr Input Maximum Flow Boiler Temperature Rise Chart Table DDTable CC Maximum Flow for Heating BoilerTypical Heating Boiler Installations TEMPERATURE/PRESSURE GaugePlacing the Boiler Operation Boiler Operating Temperature Control Installation with a Chilled Water SystemBoiler Operation Typical Water Heater Piping with Storage Tank Water Velocity ControlTable FF Table EEMaximum Flow Rate Btu/hr Input Water Chemistry Single Water Heater Piping with Two Storage Tanks Piping Multiple Unit InstallationsCommon Manifold Table GGPump Operation Heat ExchangerTable HH Thermostat SettingsThermal Expansion Optional Relief ValveCathodic Protection Ladder Diagram PWM Wiring Diagram
Related manuals
Manual 20 pages 6.19 Kb Manual 16 pages 33.86 Kb Manual 56 pages 36.01 Kb Manual 56 pages 40.75 Kb