Lochinvar 1, 000 through 2 Table F, Direct Vent and Intelli-Vent Flue Air Inlet Pipe Sizes

Page 14

In cold climates, the use of type “B” double wall vent pipe or an insulated single wall pipe for combustion air is recommended to help prevent moisture in the cool incoming air from condensing and leaking from the inlet pipe.

Termination point for the flue products must follow the clearance requirements in the Vertical or Horizontal Vent Termination sections of the Category IV Venting.

CAUTION￿

Appliances that are shut down or will not operate may experience freezing due to convective airflow in the air inlet pipe connected to the appliance.

TABLE - F

Direct Vent and Intelli-Vent Flue

and Air Inlet Pipe Sizes

 

 

 

Air Inlet

Input Btu/hr

 

Flue Size

Pipe Size

 

 

 

 

1,500,000

 

6"

6"

________________

 

______________

________________

1,700,000

 

7"

7"*

________________

 

_____________

________________

2,000,000

 

8"

8"

 

 

 

 

*Piping from the appliance to the air inlet cap may be either 7" or 8". An 8" diameter sidewall air inlet cap is provided in the vent kit.

Length of Air Inlet Pipe

The maximum total length of the sidewall or vertical roof top combustion air inlet pipe as installed from the appliance to the air inlet cap must not exceed 100 equivalent feet (30.5 m) in length. Subtract 5 feet (1.52 m) of equivalent length for each 90° elbow installed in the air inlet pipe system. Subtract 2 1/2 feet (0.7 m) of equivalent length for each 45° elbow installed in the air inlet pipe system.

Do not exceed limits for the combustion air inlet piping lengths.

Air Inlet Pipe Materials

The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from those specified in this section.

Select air inlet pipe material from the following specified materials:

PVC, CPVC or ABS (6", 7"or 8" I.D.)*.

Dryer Vent or Sealed Flexible Duct (not recommended for roof top air inlet).

Galvanized steel vent pipe with joints and seams sealed as specified below.

Type “B” double wall vent with joints and seams sealed as specified below.

* Plastic pipe may require an adapter (not provided) to transition between the air inlet connection on the appliance and the plastic air inlet pipe.

WARNING￿

Using vent or air intake materials other than those specified, failure to properly seal all seams and joints or failure to follow vent pipe manufacturer’s instructions can result in personal injury, death or property damage. Mixing of venting materials will void the warranty and certification of the appliance.

NOTE:

The use of double wall vent or insulated material for the combustion air inlet pipe is recommended in cold climates to prevent the condensation of airborne moisture in the incoming combustion air.

Sealing of Type “B” double wall vent material or galvanized vent pipe material used for air inlet pipe on a sidewall or vertical roof top Combustion Air Supply System.

a.Seal all joints and seams of the air inlet pipe using either Aluminum Foil Duct Tape meeting UL Standard 723 or 181A-P or a high quality UL Listed silicon sealant such as those manufactured by Dow Corning or General Electric.

b.Do not install seams of vent pipe on the bottom of horizontal runs.

c.Secure all joints with a minimum of three sheet metal screws or pop rivets. Apply aluminum

foil duct tape or silicone sealant

to all

screws

or rivets installed in the vent pipe.

 

 

d. Ensure that the air inlet pipes

are

properly

supported.

 

 

The PVC, CPVC or ABS air inlet pipe should be cleaned and sealed with the pipe manufacturers recommended solvents and standard commercial pipe cement for the material used. The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe should use a silicone

14

Image 14 Contents
IFB/IFW-i&s-05 WarrantySpecial Instructions To Owner Table of Contents What to do if YOU Smell GAS Checking EquipmentDo not Owner WarningTable a Installation Procedure Location of UnitRecommended Service Clearances Clearances from Combustible ConstructionCombustion Air Direct from Outside AIR Supply to Mechanical Room Table BMinimum Recommended Combustion 500 in2 3226 cm2 667 in2 4303 cm2 000 in2 12,903 cm2Construction AIR Filter Construction Air FilterTable D Construction AIR Filter Kits Table CVenting Category IV Flue Pipe SizesCategory IV Flue Pipe Materials Category IV Positive Pressure Venting SystemCategory IV Venting Venting Guidelines for a Category IV VentExceed a maximum of 100 equivalent feet 30.5 m in length Drain Tee InstallationGeneral Category IV Vent Termination Clearances Masonry Chimney Installations Vertical Venting TerminationsSidewall Vent Cap Kits Sidewall Venting TerminationsTable E Sidewall VentLocation of a Sidewall Vent Termination Direct Vent INTELLI-VENT SystemsAir Inlet Table FDirect Vent and Intelli-Vent Flue Air Inlet Pipe Sizes Length of Air Inlet PipeVertical Direct Vent Systems Combined Combustion Air Inlet PointsMultiple Vertical Direct Vent Installations Horizontal Direct VentLocation of a Sidewall Air Inlet Cap Sidewall Combustion AIR InletTable G Multiple Horizontal Direct Vent Installations These areMaximum Length of an Intelli-Vent System Table HCombined Air Inlet Points Air Inlet Sidewall Input Flue Pipe Btu/hr SizeBtu/hr Size Cap Kit Horizontal INTELLI-VENT with Vertical Combustion AIRAir Inlet Sidewall Input Flue Pipe 500,000 SVK3026Vertical Combustion Horizontal INTELLI-VENT AIR Inlet Location of a Rooftop Air Inlet CapTable J GAS Connection GAS Supply GAS Pressure TestTable K Table LTable M Recommended Gas Pipe Size Single Appliance InstallationsMultiple Appliance Installations Gas Pipe Size Chart Table NGAS Piping GAS Manifold Pressure AdjustmentInstall Piping to Control Checking GAS Supply PressureChecking Manifold GAS Pressure Water Connections Water ConnectionsMinimum Pipe Size Requirements Secondary Heat Exchanger Primary Heat ExchangerInlet and Outlet Connections Integral Bypass Bypass Valve SynchronizationOptional Intermittent Pump Operation Bypass Piping AssemblyIntegral Circulator Bypass Initial Set-up of Maximum Water FlowTable P Minimum Water TemperaturesBtu/hr Input Temperature Rise Bypass OperationLOW Water Cutoff Water Flow SwitchTable Q GAS Train and ControlsRelief Valve Diaphragm GAS Valve Ratio GAS ValveJacket Assembly Electrical ConnectionsAccess to Components and Controls Front Control Panel LocationsVariable Frequency Drive Transformer and Relay LocationsExcel High GAS Pressure Switch LOW GAS Pressure Switch OptionalLOW AIR Pressure Switch Be used as a diagnostic indicator Table S Temperature AdjustmentDefault Values Pre-programmed in the Excel To Activate the Manual OverrideTable T Display Default Values Password FunctionConfiguring Command Display Accessing the SIX Changeable Points from Command DisplaySet Point Temp Calculated Set PointTotal Run Time Sequencing TypeCommand Display Data Screen Status Point Operational Modes Status PointsTable U Hot Surface Igniter OnOutdoor Reset Function Selections Optional on Heating Boilers OnlyMultiple Appliance Installations Efficiency Optimized with Time EqualizationTable W Singly Terminated FTT Network Bus Topology SpecificationsInterfacing Multiple Appliances Wire Termination for E-Bus Connection Additional Components Used to Interface Multiple AppliancesHigh Water Temperature Limit Control Typical Building Management System DiagramIgnition Module Lockout Functions Service PartsHOT Surface Ignition System Ignition and Control Timings Diagnostic Status IndicationTable Y Table ZBurner OPERATION/DIAGNOSTIC LIGHTS, Resets and SwitchesIndicator Table AACombustion AIR Blower Combustion Air Blower and Transition ChamberTable BB Condensate ManagementSystem Optional Condensate Drain Location On RearReplenishing the Neutralizer Condensate TestingCondensate Trap Installation Install Condensate Trap Lighting InstructionsTo Turn OFF GAS to Appliance Ignition System CheckoutSequence of Operation Heat Transfer ProcessMaintenance End of SequenceBurner Removal and Cleaning Burner MaintenanceBurner Cleaning Procedure Location of Primary Heat ExchangerSecondary Heat Exchanger Inspection Lubrication Freeze Protection Water Treatment Heating Boiler InstallationsFreeze Protection for a Heating Boiler System If Required Water Connections Heating Boilers onlyBoiler Circulator Pump Limitations Primary Loop Circulator Pump SpecificationsPiping Lengths Circulator Pump OperationMinimum Boiler Water Temperatures PRIMARY/SECONDARY Boiler PipingMaximum Flow for Heating Boiler Boiler Temperature Rise Chart Table DDTable CC Btu/hr Input Maximum FlowPlacing the Boiler Operation TEMPERATURE/PRESSURE GaugeTypical Heating Boiler Installations Boiler Operation Installation with a Chilled Water SystemBoiler Operating Temperature Control Water Velocity Control Typical Water Heater Piping with Storage TankMaximum Flow Rate Btu/hr Input Table EETable FF Water Chemistry Piping Multiple Unit Installations Single Water Heater Piping with Two Storage TanksHeat Exchanger Table GGPump Operation Common ManifoldThermostat Settings Table HHCathodic Protection Optional Relief ValveThermal Expansion Ladder Diagram PWM Wiring Diagram
Related manuals
Manual 20 pages 6.19 Kb Manual 16 pages 33.86 Kb Manual 56 pages 36.01 Kb Manual 56 pages 40.75 Kb