Lochinvar 000 through 2, 1 warranty Secondary Heat Exchanger Inspection

Page 61

NOTE:

G. SECONDARY HEAT EXCHANGER INSPECTION

 

 

 

All gaskets/sealant on disassembled components or jacket panels must be replaced with new gaskets/ sealant on reassembly. Gasket and sealant kits are available from your distributor.

F.PRIMARY HEAT EXCHANGER INSPECTION

1.Turn off all power to the appliance.

2.Turn off main gas to appliance.

3.Remove the front outer jacket door.

4.Remove the front inner jacket door.

5. Check the heat exchanger surface

for

soot.

If

soot

is present, heat exchanger must

be

cleaned

and

problem corrected.

 

 

 

 

6.Remove burner as described in Burner Maintenance procedure.

7.Check “V” baffles on the exchanger. Remove and clean if necessary.

8. Remove soot

from heat exchanger with a

stiff

bristle brush.

Use a vacuum to remove loose

soot

from surfaces and inner chamber.

 

9.The heat exchanger can be removed by disconnecting all water piping to the bypass and secondary heat exchanger, removing the screws holding the heat exchanger to the top of the inner jacket. and sliding the heat exchanger towards the

front of

the

appliance.

Once

 

the

heat

exchanger

is

removed,

a garden

hose

can

be

used

to

wash

the

tubes

to

ensure

that all

soot is

removed

from

the

heat

exchanger

surfaces.

NOTE:

Do

not

wet

the insulation blankets on the

inside

of

the

outer

jacket panels.

 

 

 

 

 

 

 

 

10.Ensure that any soot present on the burner is removed. See Burner Cleaning Procedure.

11.Carefully reinstall the heat exchanger and “V” baffles if removed from the appliance.

12. Reinstall

inner

jacket

panels,

burner,

manifolds,

wires and

hoses.

Use

new

gasket

material to

ensure a proper air seal.

 

 

 

13.Reassemble all gas and water piping. Test for gas leaks.

14.Reassemble outer jacket panels.

15.Cycle unit and check for proper operation.

FIG. 78 Location of Secondary Heat Exchanger

1.Turn off all power to the appliance.

2.Turn off main gas to appliance.

3.Break the union, pump flange and bypass valve

flange to remove the pump and external portion of the bypass assembly.

4.Remove the inner jacket door.

5.Check the heat exchanger surface for soot or

fouling.

If soot is present,

heat exchanger must

be cleaned and problem corrected.

 

6.Check “V” baffles on the exchanger. Remove and clean if necessary.

7.Remove soot from heat exchanger with a soft bristle brush. Use care not to damage coating on the exterior of the secondary heat exchanger. Use a vacuum to remove loose soot from surfaces and inner chamber.

8.The heat exchanger can be removed by disconnecting all water piping to the bypass and secondary heat exchanger and sliding the heat exchanger towards the rear of the appliance. Once

the heat exchanger is removed, a garden hose can be used to wash the tubes to ensure that all surface deposits are removed from the exterior of the heat exchanger surfaces.

61

Image 61
Contents Special Instructions To Owner WarrantyIFB/IFW-i&s-05 Table of Contents Do not Checking EquipmentWhat to do if YOU Smell GAS Owner WarningRecommended Service Clearances Installation Procedure Location of UnitTable a Clearances from Combustible ConstructionCombustion Air Direct from Outside Minimum Recommended Combustion Table BAIR Supply to Mechanical Room 500 in2 3226 cm2 667 in2 4303 cm2 000 in2 12,903 cm2Construction Air Filter Construction AIR FilterVenting Construction AIR Filter Kits Table CTable D Category IV Flue Pipe SizesCategory IV Venting Category IV Positive Pressure Venting SystemCategory IV Flue Pipe Materials Venting Guidelines for a Category IV VentGeneral Category IV Vent Termination Clearances Drain Tee InstallationExceed a maximum of 100 equivalent feet 30.5 m in length Vertical Venting Terminations Masonry Chimney InstallationsTable E Sidewall Venting TerminationsSidewall Vent Cap Kits Sidewall VentDirect Vent INTELLI-VENT Systems Location of a Sidewall Vent TerminationDirect Vent and Intelli-Vent Flue Air Inlet Pipe Sizes Table FAir Inlet Length of Air Inlet PipeCombined Combustion Air Inlet Points Vertical Direct Vent SystemsHorizontal Direct Vent Multiple Vertical Direct Vent InstallationsTable G Sidewall Combustion AIR InletLocation of a Sidewall Air Inlet Cap These are Multiple Horizontal Direct Vent InstallationsCombined Air Inlet Points Table HMaximum Length of an Intelli-Vent System Air Inlet Sidewall Input Flue Pipe Btu/hr SizeAir Inlet Sidewall Input Flue Pipe Horizontal INTELLI-VENT with Vertical Combustion AIRBtu/hr Size Cap Kit 500,000 SVK3026Location of a Rooftop Air Inlet Cap Vertical Combustion Horizontal INTELLI-VENT AIR InletTable J Table K GAS Supply GAS Pressure TestGAS Connection Table LMultiple Appliance Installations Gas Pipe Size Chart Recommended Gas Pipe Size Single Appliance InstallationsTable M Table NInstall Piping to Control GAS Manifold Pressure AdjustmentGAS Piping Checking GAS Supply PressureChecking Manifold GAS Pressure Water Connections Water ConnectionsInlet and Outlet Connections Secondary Heat Exchanger Primary Heat ExchangerMinimum Pipe Size Requirements Bypass Valve Synchronization Integral BypassIntegral Circulator Bypass Piping AssemblyOptional Intermittent Pump Operation Bypass Initial Set-up of Maximum Water FlowBtu/hr Input Temperature Rise Minimum Water TemperaturesTable P Bypass OperationTable Q Water Flow SwitchLOW Water Cutoff GAS Train and ControlsDiaphragm GAS Valve Ratio GAS Valve Relief ValveElectrical Connections Jacket AssemblyFront Control Panel Locations Access to Components and ControlsTransformer and Relay Locations Variable Frequency DriveLOW AIR Pressure Switch High GAS Pressure Switch LOW GAS Pressure Switch OptionalExcel Be used as a diagnostic indicator Default Values Pre-programmed in the Excel Temperature AdjustmentTable S To Activate the Manual OverrideConfiguring Command Display Password FunctionTable T Display Default Values Accessing the SIX Changeable Points from Command DisplayTotal Run Time Calculated Set PointSet Point Temp Sequencing TypeCommand Display Data Screen Table U Status PointsStatus Point Operational Modes Hot Surface Igniter OnOptional on Heating Boilers Only Outdoor Reset Function SelectionsEfficiency Optimized with Time Equalization Multiple Appliance InstallationsInterfacing Multiple Appliances Singly Terminated FTT Network Bus Topology SpecificationsTable W Additional Components Used to Interface Multiple Appliances Wire Termination for E-Bus ConnectionTypical Building Management System Diagram High Water Temperature Limit ControlHOT Surface Ignition System Service PartsIgnition Module Lockout Functions Table Y Diagnostic Status IndicationIgnition and Control Timings Table ZIndicator OPERATION/DIAGNOSTIC LIGHTS, Resets and SwitchesBurner Table AACombustion Air Blower and Transition Chamber Combustion AIR BlowerSystem Optional Condensate ManagementTable BB Condensate Drain Location On RearCondensate Trap Installation Condensate TestingReplenishing the Neutralizer Lighting Instructions Install Condensate TrapIgnition System Checkout To Turn OFF GAS to ApplianceHeat Transfer Process Sequence of OperationEnd of Sequence MaintenanceBurner Maintenance Burner Removal and CleaningLocation of Primary Heat Exchanger Burner Cleaning ProcedureSecondary Heat Exchanger Inspection Lubrication Freeze Protection Freeze Protection for a Heating Boiler System If Required Heating Boiler InstallationsWater Treatment Water Connections Heating Boilers onlyPiping Lengths Primary Loop Circulator Pump SpecificationsBoiler Circulator Pump Limitations Circulator Pump OperationPRIMARY/SECONDARY Boiler Piping Minimum Boiler Water TemperaturesTable CC Boiler Temperature Rise Chart Table DDMaximum Flow for Heating Boiler Btu/hr Input Maximum FlowTypical Heating Boiler Installations TEMPERATURE/PRESSURE GaugePlacing the Boiler Operation Boiler Operating Temperature Control Installation with a Chilled Water SystemBoiler Operation Typical Water Heater Piping with Storage Tank Water Velocity ControlTable FF Table EEMaximum Flow Rate Btu/hr Input Water Chemistry Single Water Heater Piping with Two Storage Tanks Piping Multiple Unit InstallationsPump Operation Table GGHeat Exchanger Common ManifoldTable HH Thermostat SettingsThermal Expansion Optional Relief ValveCathodic Protection Ladder Diagram PWM Wiring Diagram
Related manuals
Manual 20 pages 6.19 Kb Manual 52 pages 37.07 Kb Manual 16 pages 33.86 Kb Manual 56 pages 36.01 Kb Manual 56 pages 40.75 Kb

000, 000 through 2, 1 specifications

Lochinvar 1 is a remarkable achievement in the realm of modern technology and engineering. As a powerful and efficient water heater, it has been designed to cater to a wide range of residential and commercial needs. One of the standout features of Lochinvar 1 is its advanced heating technology, which incorporates a high-efficiency condensing design. This technology allows the unit to achieve impressive energy savings by maximizing heat transfer while minimizing energy consumption.

The Lochinvar 1 utilizes a stainless steel heat exchanger that enhances durability and corrosion resistance. This not only extends the lifespan of the unit but also ensures consistent performance over time. Coupled with a user-friendly control system, users can easily adjust settings and monitor performance, enhancing overall convenience and usability.

Another key characteristic of the Lochinvar 1 is its compact design, making it suitable for a variety of installation environments. Whether in a residential basement or a commercial utility room, the unit’s space-saving configuration allows for efficient use of available area without compromising on capability.

Safety features are integral to the Lochinvar 1, providing peace of mind for users. The unit is equipped with advanced monitoring systems that can detect irregularities and automatically shut down the system if necessary. This not only protects the equipment but also enhances the safety of the environment in which it operates.

In terms of performance, Lochinvar 1 boasts a high recovery rate, ensuring hot water is available on demand. This is particularly beneficial for settings with high water usage, allowing simultaneous operations without lag.

Moreover, the unit supports various venting options, offering flexibility during installation. Whether using traditional vertical venting or innovations like direct venting, Lochinvar 1 accommodates different building designs and local codes, making it highly versatile.

In conclusion, Lochinvar 1 epitomizes the melding of efficiency, reliability, and user-friendly technology. With its high-performance features, robust safety systems, and adaptable installation options, it stands out as a forefront player in the water heating industry, meeting the diverse needs of today's consumers and businesses alike.