replace cable.

8)Reinstall burners, being careful to put the pilot main burner in its original location.

9)Inspect all boiler wiring for loose connections or deterioration.

10)Inspect the vent system:

Make sure that the vent system is free of obstructions.

Make sure that all vent system supports are intact.

Inspect joints for signs of condensate or flue gas leakage.

Inspect venting components for corrosion or other deterioration. Replace any defective vent components.

11)Inspect the boiler and system for leaks.

12)Inspect the low water cut-off:

For Hydrolevel CG400A low water cut-offs - Remove and inspect the probe for scale and sediment buildup. Clean any sediment or scale from the probe with a scouring pad or steel wool. Consult the Hydrolevel CG400 manual for any additional maintenance information. Test the low water cut-off before placing the boiler back into service.

For McDonnell & Miller #67 low water cut-offs - Remove and inspect switch and float mechanism. Inspect float bowl for mud accumulation. Clean as required. Replace the switch and float mechanism every five years or 100,000 cycles. Consult the McDonnell and Miller #67 manual for any additional maintenance information. Test the low water cut-off before placing the boiler back into service.

13)Allow the boiler to cool to room temperature. Remove the drain valve and 2 x 3/4 bushing on the left side of the boiler. Use a flashlight to inspect the bottom row of pushnipples for accumulated scale or mud. If a significant amount is present, use the following procedure to clean the inside of the heat exchanger:

a)Temporarily install a 1 1/4 inch or larger full port ball valve in place of the boiler drain. Temporarily pipe the outlet of this valve to a location where hot water and steam can be safely discharged.

b)Make sure that this valve is closed and that the water level is at the normal water line.

c)If a king valve is present in the steam main takeoff, close it. Alternatively, temporarily replace enough of the vents on the mains and/or radiators with plugs so that 2-5 psi can be developed when the boiler is fired.

d)Fire the boiler and allow it to steam until 2-5 psi is registered on the gauge.

e)Turn off the burners and immediately fully open the 1-1/4 valve.

f)Allow the boiler to blow down until either the water runs clear or the water level reaches the bottom of the gauge glass.

g)Allow all parts of the boiler to cool to room temperature. Drain the boiler completely and remove the 1-1/4 valve.

h)If significant mud or scale is still present in the bottom of the boiler, repeat steps (b) through (g) until all mud or scale is removed.

i)Once all mud or scale is removed, replace the 1-1/4 valve and temporary blow-down piping with the standard drain valve. After all parts of the boiler are at room temperature, refill the boiler to the normal water line.

14)Place the boiler back in operation using the procedure outlined in “Start-up”. Check the pilot line and any other gas piping

NOTE

A large accumulation of mud or scale in the bottom of the heat exchanger is usually a sign of excessive feedwater make-up. Such accumulations can cause severe heat exchanger damage. If mud or scale accumulations are found:

Make sure that all vents are in working order. Vents should not permit any passage of steam or water.

Check all steam and return piping for leaks. Be aware that buried return piping can leak and go undetected during normal operation.

33

32

Image 33
Contents BSI Series Product Description Table of ContentsBSI Specifications II SpecificationsIV Locating the Boiler III Before InstallingAir for Combustion and Ventilation ForBuildingsofUnusuallyTightConstruction For Buildings of Other than Unusually Tight ConstructionBOILERINSTALLEDINCONFINEDSPACE, ALL AIR from Inside ALL AIR from OUTDOORS, Using Openings Into Boiler Room VI Venting Removing an Existing Boiler from a Common Chimney BSI Boilertypicalventsystem Installation and Components Gasconnectiontoboiler VII Gas PipingGeneral Piping Notes Viii System PipingPipingInstallation Common NEAR-BOILER Piping Mistakes Indirectwater Heater BOILER-SIDE Piping IX Indirect Water Heater PipingWiring Indirect Water Heater Wiring Wiring Indirectwater Heater to Boiler Sequence of Operation, Standing Pilot BSI Control System Sequence of OperationVent Damper Note Less Vent GAS Valve BSI379 Honeywell VR8204/VR8304 Series GAS Valves BSI069 Robertshaw 2423 XI Start-up and CheckoutStanding Pilot Burner Flame For Your Safety Read Before Operating For Your Safety Read Before Lighting For Your Safety Read Before Lighting Position Indicator High Altitude Burners GASVALVEDETAIL-HONEYWELLVR8200ORVR8300STANDINGPILOT On a continuous basis XII Service and MaintenanceOn at least a weekly basis On an annual basisPage Heat Exchanger Cleaning Procedure Xiii Troubleshooting Start END Start END Standing Pilot Ignition System Troubleshooting Chart Intermittent Ignition System Troubleshooting Chart XIV Parts Page KEY # Page Boilers only Page Before Installing Appendix a Knockdown Boiler Assembly InstructionsFIGUREA1 BASE, Heat EXCHANGER, Flue Collector Assembly Gas Valve Installation Figure A2 Jacket Installation Complete Installation Electrical Wiring ConnectionsFigure A3 Tapping Locations see Text for Tapping Uses Crown