Heat & Glo LifeStyle 350TRSILP-AUF, 350TRSI-AUF owner manual Minimum Framing Dimensions

Page 22

Note: The clearance to ceil- ing is measured from the top of the unit and it does not

Ainclude the standoffs.

B

C

D

1 in.

E (25 mm)

J

F

G

H

NOTE: FRAME OPENING HEIGHT IS GREATER THAN PLASTER OPENING HEIGHT.

I

*MINIMUM FRAMING DIMENSIONS

 

 

A

 

B

C

 

D

E

F

G

H

I

J

Models

DVP Pipe

SLP Pipe

Rough

**DVP Pipe

SLP Pipe

Rough

 

 

 

 

 

 

 

 

 

 

 

Clearance

Combustible

Combustible

Behind

Sides of

Front of

Rough

 

Rough

Rough

Rough

 

 

 

Opening

Opening

to Ceiling

Floor

Flooring

Appliance

Appliance

Appliance

 

 

Opening

 

Opening

Opening

Opening

 

 

 

(Height)

(Width)

 

 

 

 

 

 

 

 

(Width)

 

(Width)

 

(Depth)

(Depth)

 

 

 

 

 

 

 

350TRSI-AUF

in.

10

 

8-5/8

32-3/4

16-1/4

16-1/4

34

32

0

0

1/2

1/2

36

350TRSILP-AUF

mm

254

 

219

832

413

413

864

813

0

0

13

13

915

*Adjust framing dimensions for interior sheathing (such as sheetrock) C** Add 12 in. (305 mm) for rear venting with one 90º elbow.

Figure 5.3 Clearances to Combustibles

22

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

 

Image 22
Contents Do Discardnot Models 350TRSI-AUF 350TRSILP-AUFWhat to do if you smell gas Hot glass will cause burnsModels 350TRSI-AUF, 350TRSILP-AUF Congratulations Homeowner Reference InformationSans Compliance Novida Testing ServiceSans Table of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsAustralian Warranty Information Limited Lifetime WarrantyWarranty Exclusions Warranty Conditions and ExclusionsOther Rights HOW to Claim This warranty is void ifMelbourne Perth Listing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationClearances Constructing the Appliance ChaseClearance to heat shield Minimum Framing Dimensions Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams USE SLP Series Components only Top Vent Horizontal TerminationV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumTop Vent Horizontal Termination Three Elbows Min MaxStraight Up Vertical Flue System Top Vent Vertical TerminationMAX. RUN Model Flue System Approvals And InstallationsFlue Termination Approvals Top Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumUSE DVP Series Components only Rear Vent Horizontal Termination No ElbowOne 45º Elbow H1 Minimum H1 MaximumRear Vent Horizontal Termination Two Elbows H3H2Minimum Maximum Rear Vent Vertical Termination One Elbow Two ElbowsV1 Minimum H1 + H2 Maximum Maximum Minimum + H 2 Maximum Rear Vent Vertical Termination Three ElbowsMinimum + H 2 + H Maximum Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAdjustments And Replacement Parts Components Removal For ServiceParts Replacement Install Trim and/or SurroundAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationBlower Fireplace Specific Information Kit ContentsInstallation Precautions IntroductionChanging Temperature Scale Installation of Remote Control HousingProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Remote Position Learn ButtonDisplay Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFacing Material Finishing741 837 Clean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesLog Placement Instructions Log Assembly LOGS-350CE-DHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Effective Length DVP-TRAP2Mm Heat Shield 15-1/8 384 mm Horizontal Termination CapDVP-HRC-SS DVP-HRC-ZC-SS SLP-PIPE SLP45SLP90 SLP-WSDVP-FBHT SLP90 SL-2DVP SLP-TVHWVertical Termination Cap DVP-FBHTLog Set Assembly Description Comments Part NumberService Parts Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information