Heat & Glo LifeStyle 350TRSI-AUF, 350TRSILP-AUF Mantel and Wall Projections, Combustible Mantels

Page 23

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of non- combustible materials (i.e., steel studs, concrete board, etc).

Combustible Mantels

 

 

 

305

 

 

 

 

279

 

NON-COMBUSTIBLE

 

 

254

 

 

229

 

BOARD

 

203

 

 

 

178

 

305

 

152

 

 

279

127

 

254

 

102

 

 

229

 

76

 

 

203

 

 

 

127 152178

 

51

76

102

 

51

 

 

 

 

 

 

 

 

 

TOP FRONT EDGE

OF FIREPLACE

Note: All measurements in millimeters.

Note: Measurement is taken from top of the opening, NOT the top of the fireplace.

Figure 5.4 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles

Combustible Mantel Legs or Wall Projections

*Add 1/2 in. (13 mm for rear vent)

3-1/2 in.

1/2 in. (13 mm)

SHEETROCK

(89 mm)

 

 

NON-COMBUSTIBLE

 

BOARD SHIPPED

 

WITH APPLIANCE

1/2 in.

 

(13 mm)

 

NON-COMBUSTIBLE ZONE

Figure 5.6 Non-combustible zone

If joints between the finished walls and the heater surround (top and sides) are sealed, a 149 ºC (300 ºF) minimum seal- ant material must be used. These joints are not required to be sealed. Only non-combustible material (using 149 °C (300 ºF) minimum adhesive, if needed) can be applied as facing to the heater surround. See Figure 5.7.

FINISH WALL MATERIAL MAY BE

COMBUSTIBLE - TOP AND SIDES

TOP VIEW

2-7/8 in.*

(876 mm)

MINIMUM

1/2 in.* (13 mm)

MINIMUM

3 ft. (914 mm) MAXIMUM

NON-COMBUSTIBLE

BOARD

Figure 5.5 Clearances to Mantel Legs or Wall Projections (Acceptable on both sides of opening.)

HIGH TEMPERATURE (149 ºC (300 ºF MIN.)

TOP AND SIDE SEAL JOINT

Note: Zero clearance finishing allowed on sides of surround and top of non-combustible board.

Figure 5.7

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

23

Image 23
Contents Hot glass will cause burns Models 350TRSI-AUF 350TRSILP-AUFWhat to do if you smell gas Do DiscardnotModels 350TRSI-AUF, 350TRSILP-AUF Homeowner Reference Information CongratulationsSans Novida Testing ServiceSans Compliance User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Warranty Conditions and ExclusionsWarranty Exclusions Melbourne Perth This warranty is void ifHOW to Claim Listing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearance to heat shield Constructing the Appliance ChaseClearances Minimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationUSE SLP Series Components only Minimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsMAX. RUN Top Vent Vertical TerminationStraight Up Vertical Flue System Flue Termination Approvals Flue System Approvals And InstallationsModel H1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow USE DVP Series Components onlyH3H2 Rear Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleRemote Position Learn Button AUX300CE Module InstallationFan Installation Programming the RC300AU to the Control ModuleFunction Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/Troubleshooting741 837 FinishingFacing Material Accessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceLog Assembly LOGS-350CE-D Log Placement InstructionsHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAP2Mm Heat Shield 15-1/8 384 mm Effective LengthDVP-HRC-SS DVP-HRC-ZC-SS SLP-WS SLP45SLP90 SLP-PIPEDVP-FBHT SLP-TVHWVertical Termination Cap DVP-FBHT SLP90 SL-2DVPDescription Comments Part Number Log Set AssemblyBeginning Manufacturing Date July Ending Manufacturing Date Service PartsConversion Kits Service Parts ListContact Information