Heat & Glo LifeStyle 350TRSI-AUF, 350TRSILP-AUF owner manual Installing the Non-combustible Board

Page 43

Figure 9.13 Attach the first vent section (it will snap into place). Slide the insulation gasket onto the vent section, up against the appliance and over the tabs.

C. Installing the Non-combustible Board

The factory supplied non-combustible board must be used. See Figure 9.14.

HEADER

Figure 9.14 Non-combustible Board

D. Securing and Leveling the Appliance

WARNING! Risk of Fire! Prevent contact with:

Sagging or loose insulation

Insulation backing or plastic

Framing and other combustible materials

Block openings into the chase to prevent entry of blown- in insulation. Make sure insulation and other materials are secured.

DO NOT notch the framing around the appliance standoffs.

Failure to maintain air space clearance may cause overheating and fire.

The diagram shows how to properly position and secure the appliance (see Figure 9.16). Nailing tabs are provided to secure the appliance to the framing members.

Bend out nailing tabs on each side.

Place the appliance into position.

Keep nailing tabs flush with the framing.

Level the appliance from side to side and front to back.

“Square” the unit by securing diagonal dimensions to within 1/4 inch (6 mm) of each other. See Figure 9.15.

Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance.

Secure the appliance to the framing by using nails or screws through the nailing tabs.

Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance.

A B

Note: Diagonal dimensions (A) and (B) must be within 1/4 inch (6 mm) of each other.

Figure 9.15 Positioning the Appliance Squarely

NAILING TABS

(BOTH SIDES)

PILOT HOLES

Figure 9.16 Proper Positioning and Securing of an Appliance

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

43

Image 43
Contents Hot glass will cause burns Models 350TRSI-AUF 350TRSILP-AUFWhat to do if you smell gas Do DiscardnotModels 350TRSI-AUF, 350TRSILP-AUF Homeowner Reference Information CongratulationsSans Compliance Novida Testing ServiceSans User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Australian Warranty InformationWarranty Exclusions Warranty Conditions and ExclusionsOther Rights HOW to Claim This warranty is void ifMelbourne Perth Listing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseClearance to heat shield Minimum Framing Dimensions Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams USE SLP Series Components only Top Vent Horizontal TerminationV1 Minimum H1 Maximum Minimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationMAX. RUN Model Flue System Approvals And InstallationsFlue Termination Approvals H1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow USE DVP Series Components onlyH3H2 Rear Vent Horizontal Termination Two ElbowsMinimum Maximum Rear Vent Vertical Termination One Elbow Two ElbowsV1 Minimum H1 + H2 Maximum Maximum Minimum + H 2 Maximum Rear Vent Vertical Termination Three ElbowsMinimum + H 2 + H Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleRemote Position Learn Button AUX300CE Module InstallationFan Installation Programming the RC300AU to the Control ModuleFunction Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFacing Material Finishing741 837 Accessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceLog Assembly LOGS-350CE-D Log Placement InstructionsHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAP2Mm Heat Shield 15-1/8 384 mm Effective LengthDVP-HRC-SS DVP-HRC-ZC-SS SLP-WS SLP45SLP90 SLP-PIPEDVP-FBHT SLP-TVHWVertical Termination Cap DVP-FBHT SLP90 SL-2DVPDescription Comments Part Number Log Set AssemblyBeginning Manufacturing Date July Ending Manufacturing Date Service PartsConversion Kits Service Parts ListContact Information