Heat & Glo LifeStyle 350TRSI-AUF owner manual Secure the Vent Sections, Disassemble Vent Sections

Page 47

D. Secure the Vent Sections

Vertical runs of DVP pipe must be supported every 8 ft. (2.44 m) after the 25 ft. (7.62 m) maximum unsupported rise.

Vertical runs of SLP pipe must be supported every 8 ft. (2.44 m).

Horizontal sections must be supported every 5 ft. (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support vent sections. See Figures 10.8 and 10.9.

Wall shield firestops may be used to provide horizontal support vent sections.

SLP ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

120º

Figure 10.8 Securing Vertical Pipe Sections

120º

Figure 10.9 Securing Horizontal Pipe Sections

E. Disassemble Vent Sections

Rotate either section (see Figure 10.10) so the seams on both pipe sections are aligned as shown in Figure 10.11.

Pull carefully to separate the pieces of pipe.

Figure 10.10 Rotate Seams for Disassembly

Figure 10.11 Align and Disassemble Vent Sections

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

47

Image 47
Contents Hot glass will cause burns Models 350TRSI-AUF 350TRSILP-AUFWhat to do if you smell gas Do DiscardnotModels 350TRSI-AUF, 350TRSILP-AUF Homeowner Reference Information CongratulationsSans Novida Testing ServiceSans Compliance User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Warranty Conditions and ExclusionsWarranty Exclusions Melbourne Perth This warranty is void ifHOW to Claim Listing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearance to heat shield Constructing the Appliance ChaseClearances Minimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationUSE SLP Series Components only Minimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsMAX. RUN Top Vent Vertical TerminationStraight Up Vertical Flue System Flue Termination Approvals Flue System Approvals And InstallationsModel H1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow USE DVP Series Components onlyH3H2 Rear Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleRemote Position Learn Button AUX300CE Module InstallationFan Installation Programming the RC300AU to the Control ModuleFunction Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/Troubleshooting741 837 FinishingFacing Material Accessories Appliance SetupRemove Fixed Glass Assembly Clean the ApplianceLog Assembly LOGS-350CE-D Log Placement InstructionsHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAP2Mm Heat Shield 15-1/8 384 mm Effective LengthDVP-HRC-SS DVP-HRC-ZC-SS SLP-WS SLP45SLP90 SLP-PIPEDVP-FBHT SLP-TVHWVertical Termination Cap DVP-FBHT SLP90 SL-2DVPDescription Comments Part Number Log Set AssemblyBeginning Manufacturing Date July Ending Manufacturing Date Service PartsConversion Kits Service Parts ListContact Information