Heat & Glo LifeStyle 350TRSI-AUF Log Placement Instructions, Log Assembly LOGS-350CE-D

Page 65

E. Log Placement Instructions

Log Assembly: LOGS-350CE-D

 

 

 

 

1

2 4

3 5

6

PILOT

BRACKET TABSUPPORT BRACKET

BURNER TABS

Carefully remove the logs from the packaging. CAUTION: Logs are fragile!

1

1

LOG #1 (SRV327-701):Place log #1 at the rear of the unit, with the left edge behind the tab on the pilot bracket. The right side sits behind the tab on the support bracket.

2

2

LOG #2 (SRV2033-701):Locate the bottom groove of log #2 over the left most grate tine and align over the burner by placing the log slot over the burner tab as shown.

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

65

Image 65
Contents What to do if you smell gas Models 350TRSI-AUF 350TRSILP-AUFDo Discardnot Hot glass will cause burnsModels 350TRSI-AUF, 350TRSILP-AUF Homeowner Reference Information CongratulationsSans Novida Testing ServiceSans Compliance User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Australian Warranty InformationOther Rights Warranty Conditions and ExclusionsWarranty Exclusions Melbourne Perth This warranty is void ifHOW to Claim Listing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearance to heat shield Constructing the Appliance ChaseClearances Minimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationUSE SLP Series Components only Minimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsMAX. RUN Top Vent Vertical TerminationStraight Up Vertical Flue System Flue Termination Approvals Flue System Approvals And InstallationsModel H1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsOne 45º Elbow Rear Vent Horizontal Termination No ElbowUSE DVP Series Components only H1 Minimum H1 MaximumH3H2 Rear Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-240V Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardParts Replacement Components Removal For ServiceAdjustments And Replacement Parts Install Trim and/or SurroundAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Installation Precautions Kit ContentsFireplace Specific Information IntroductionInstallation of Remote Control Housing Changing Temperature ScaleFan Installation AUX300CE Module InstallationProgramming the RC300AU to the Control Module Remote Position Learn ButtonStandby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/Troubleshooting741 837 FinishingFacing Material Remove Fixed Glass Assembly Appliance SetupClean the Appliance AccessoriesLog Assembly LOGS-350CE-D Log Placement InstructionsHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsMm Heat Shield 15-1/8 384 mm DVP-TRAP2Effective Length Horizontal Termination CapDVP-HRC-SS DVP-HRC-ZC-SS SLP90 SLP45SLP-PIPE SLP-WSVertical Termination Cap SLP-TVHWDVP-FBHT SLP90 SL-2DVP DVP-FBHTDescription Comments Part Number Log Set AssemblyBeginning Manufacturing Date July Ending Manufacturing Date Service PartsConversion Kits Service Parts ListContact Information