Heat & Glo LifeStyle 350TRSILP-AUF Rear Vent Vertical Termination One Elbow Two Elbows

Page 36

Rear Vent - Vertical Termination

One Elbow

V1

H1

Figure 7.16

Two Elbows

V1

V1 Minimum

H1 Maximum

1 ft.

305 mm

3 ft.

914 mm

2 ft.

610 mm

6 ft.

1.83 m

3 ft.

914 mm

8 ft.

2.44 m

4 ft.

1.22 m

11 ft.

3.35 m

5 ft.

1.52 m

12 ft.

3.66 m

V1 + H1 = 36 ft. (10.97 m) Maximum

H1 = 12 ft. (3.66 m) Maximum

USE DVP SERIES COMPONENTS ONLY

V1 Minimum

H1 + H2

Maximum

2 ft.

610 mm

Back to Back 90º Elbows

 

 

 

 

 

1 ft.

310 mm

3 ft.

 

915 mm

2 ft.

610 mm

4 ft.

 

1.22 m

3 ft.

914 mm

8 ft.

 

2.44 m

4 ft.

1.22 m

10 ft.

 

3.05 m

V1 + H1 = 32 ft. (9.75 m) Maximum

H1 + H2 = 9 ft. (2.74 m) Maximum

USE DVP SERIES COMPONENTS ONLY

INSTALLED

HORIZONTALLY H1

H2

Figure 7.17

36

Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF2089-980 Rev. o • 6/12

 

Image 36
Contents Models 350TRSI-AUF 350TRSILP-AUF What to do if you smell gasDo Discardnot Hot glass will cause burnsModels 350TRSI-AUF, 350TRSILP-AUF Congratulations Homeowner Reference InformationNovida Testing Service Sans ComplianceSans Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsAustralian Warranty Information Limited Lifetime WarrantyWarranty Conditions and Exclusions Warranty ExclusionsOther Rights This warranty is void if HOW to ClaimMelbourne Perth Listing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesClearance to heat shield Minimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination USE SLP Series Components onlyV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumTop Vent Horizontal Termination Three Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemMAX. RUN Flue System Approvals And Installations ModelFlue Termination Approvals Top Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumRear Vent Horizontal Termination No Elbow One 45º ElbowUSE DVP Series Components only H1 Minimum H1 MaximumRear Vent Horizontal Termination Two Elbows H3H2Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-240V KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceComponents Removal For Service Parts ReplacementAdjustments And Replacement Parts Install Trim and/or SurroundInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Kit Contents Installation PrecautionsFireplace Specific Information IntroductionChanging Temperature Scale Installation of Remote Control HousingAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Remote Position Learn ButtonIdle When Remote is in on Mode Standby modeDisplay Screen Function ButtonsAbout on Mode About OFF ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Thermostat Adjusting TimerSetting the Child Lock Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFinishing Facing Material741 837 Appliance Setup Remove Fixed Glass AssemblyClean the Appliance AccessoriesLog Placement Instructions Log Assembly LOGS-350CE-DHeat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Heat & Glo 350TRSI-AUF, 350TRSILP-AUF 2089-980 Rev. o 6/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2DVP-TRAP2 Mm Heat Shield 15-1/8 384 mmEffective Length Horizontal Termination CapDVP-HRC-SS DVP-HRC-ZC-SS SLP45 SLP90SLP-PIPE SLP-WSSLP-TVHW Vertical Termination CapDVP-FBHT SLP90 SL-2DVP DVP-FBHTLog Set Assembly Description Comments Part NumberService Parts Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information