Heat & Glo LifeStyle ST-38HV-AU manual Flue Termination, Hole and New Framing Members

Page 16

Drill a hole or drive a nail through this center point.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the heater and flue system, if neces- sary, to accommodate the ceiling joists and/or obstructions.

Cut an 11-inch X 11-inch (280 mm X 280 mm) hole through the ceiling, using the center point previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

NAILS (4 REQUIRED)

RAFTER

CEILING

11”

11”

(280mm)

CEILING FIRESTOP

(280mm)

CHIMNEY

HOLE

NEW

FRAMING

CEILING MEMBERS

EXISTING

CEILING

JOISTS

Figure 16 Hole and New Framing Members

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 17 Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

Figure 18 Attic Firestop

C. Flue Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal flue:

Rotate and interlock the ends as described at the beginning of the Installing Flue Components sec- tion.

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior po- sition on the building.

!WARNING: THE TERMINATION CAP MUST BE POSITIONED SO THAT THE ARROW IS POINTING UP.

Use the exterior pipelock hole provided on the round flange of the wall firestop to secure the flue pipe in place.

Use a high-temperature sealant or fiberglass rope gasket to seal between the pipe and exterior firestop.

See Figure 4 for flue termination clearances.

16

Image 16
Contents Model ST-38HV-AU Kensington Blvd., Lakeville, MN 55044, USA 952Installation and Operation Instructions Table of Contents Installation Instructions Diagram of ST-38HV-AUClearance Requirements Top Ceiling Front HeaterModel ST-38HV-AU Framing only and no Sheetrock on IN- Terior of FramingClearances Flue System Approvals and Installations Straight OUT Horizontal Flue SystemElbows ONE 1 90-DEGREE ElbowVertical Flueing Straight OUT Horizontal FlueingFlueing with ONE 1 90 Elbow Flueing with TWO 2 90 Elbows Flueing with Three 3 90 Elbows Flueing with Three 3 90 Elbows Installing Flue Components Install Support BracketsAttach the First Flue Component to the Starting Collars Continue Adding Flue ComponentsInstalling Support Brackets Install Firestops For Vertical RunsFlue Termination Hole and New Framing MembersFAN Connecting the GAS SupplyFor Vertical Terminations To locate the flue Junction BOX Detail LOG Installation Installing the Electrical Service to the Junction BOXMantel Clearances LOG Placement Instructions Page Page Installer Testing Operating InstructionsSafety & Lighting Information Operating CautionsLighting Instructions Safety Information For Your Safety Read Before LightingTo Turn OFF GAS Appliance Servicing and Maintenance FAN OperationRemoval of Components for Service Parts ReplacementAdjustments and Replacement Parts Removal of Covers for ServicingTroubleshooting ST-38HV-AU Symptom Possible Cause Corrective ActionSymptom Possible Cause Corrective Action Symptom Symptom Possible Cause VII. Flame burns blue and lifts off burnerST-38HV-AU Service Parts List ST-38HV-AUService Parts Limited 10 Year Warranty Heat & GLO, a brand of Hearth & Home Technologies Inc