State Industries SBL85 275NE(A), SBL85 390NE(A) Multi Flue 2 Units with Booster TWO Temperature

Page 42

MULTI FLUE (2 UNITS) WITH BOOSTER TWO TEMPERATURE

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

42

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

 

PRE-HEATER

PRE-HEATER

FINISHED FLOOR

MUST BE IDENTICAL HEATERS

LEGEND

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT OUTLET

AT STORED

TEMPERATURE

BOOSTER RETURN (IF USED)

PIPE T&P TO

OPEN DRAIN

BOOSTED

WATER

OUTLETCOLD WATER

SUPPLY

TYPICAL

BOOSTER

HEATER

EXPANSION TANK

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

Image 42
Contents Commercial gas water heaters SBL95 199NE SBL85 275NEA SBL85 390NEA Ultra Low NOx SeriesTable Of Contents Safe Installation, Use and Service ApprovalsGeneral Safety Information Fire or Explosion HazardFire and Explosion Hazard Precautions Grounding InstructionsHydrogen Gas Flammable Abbreviations Used Qualified Installer or Service AgencyIntroduction QualificationsBlower/Burner Assembly High Limit Switch Features and ComponentsHydrocannon self-cleaning system ControlsRough-In-Dimensions Installation considerationsRough In Dimensions Recovery Capacities, based on 82% efficiencyLocating the Water Heater ClearancesHard Water NSF Leg KitInsulation Blanket Circulation PumpsHigh Altitude Installations Breathing Hazard Carbon Monoxide GasInstallation Requirements Closed Water Systems Temperature-Pressure Relief ValveDishwashing Machines Thermal ExpansionContaminated Air Water Damage HazardCombustible Material Storage Valve Discharge Pipe RequirementsConfined Space Air RequirementsUnconfined Space VentingOutdoor Air Through Two Openings Multiple Heater Manifold Outdoor Air Through One OpeningFresh Air Openings for Confined Spaces Outdoor Air Through Two Horizontal DuctsOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesTechnical Data Venting Type B GAS VentMultiple Gas Fired Tank-Type Heaters Model SBL85 275NEA Water heater installation Water Line ConnectionsValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Heater Wiring Purging Gas Line Leak TestingGas Piping Gas Meter Size Natural Gases OnlyStart up Prior to Start UpInitial Start Up Checking Venting Water Temperature AdjustmentMultiple Appliance Installations Checking the InputSequence of Operation Lighting & Operating LabelSequence of Operation Flow Chart YESVenting System MaintenanceTemperature-Pressure Relief Valve Test Intake Air ScreenTo Drain the Water Heater Storage Tank Draining and FlushingDeliming Solvents To Flush the Water Heater Storage TankTank Cleanout Procedure Deliming Using Flo-Jug MethodChemical Hazard System Diagnostics Ignition Control SystemElectrical Servicing Start Up Conditions High Water Temperature Shut OFF SystemFor Your Information Operational ConditionsTroubleshooting Qualified Service AgencyComplaint Cause Remedy User Diagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page Limited Warranty ALL Other Parts