State Industries SBL95 199NE, SBL85 275NE(A), SBL85 390NE(A) Temperature & Pressure

Page 35

MULTI FLUE - (1 UNIT) WITH HORIZONTAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

HOT WATER TO FIXTURES

35

PIPE T&P TO

OPEN DRAIN

FINISHED

FLOOR

LEGEND

TEMPERATURE & PRESSURE

FULL PORT BALL VALVE

RELIEF VALVE

 

PRESSURE RELIEF VALVE

CHECK VALVE

 

CIRCULATING PUMP

TEMPERATURE GAGE

TANK TEMPERATURE CONTROL

WATER FLOW SWITCH

 

DRAIN

 

CIRCULATING PUMP

HOT WATER

RETURN FROM FIXTURES

ALTERNATE

LOCATION

COLD WATER

SUPPLY

EXPANSION

TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 35
Contents SBL95 199NE SBL85 275NEA SBL85 390NEA Ultra Low NOx Series Commercial gas water heatersTable Of Contents Approvals Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationFire or Explosion Hazard Hydrogen Gas Flammable PrecautionsGrounding Instructions Qualifications Qualified Installer or Service AgencyIntroduction Abbreviations UsedControls Features and ComponentsHydrocannon self-cleaning system Blower/Burner Assembly High Limit SwitchRecovery Capacities, based on 82% efficiency Installation considerationsRough In Dimensions Rough-In-DimensionsClearances Locating the Water HeaterCirculation Pumps NSF Leg KitInsulation Blanket Hard WaterBreathing Hazard Carbon Monoxide Gas High Altitude InstallationsInstallation Requirements Thermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsValve Discharge Pipe Requirements Water Damage HazardCombustible Material Storage Contaminated AirVenting Air RequirementsUnconfined Space Confined SpaceOutdoor Air Through Two Horizontal Ducts Multiple Heater Manifold Outdoor Air Through One OpeningFresh Air Openings for Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingType B GAS Vent Model SBL85 275NEA Valve Discharge Pipe Water heater installationWater Line Connections Installation Diagrams Top Inlet/Outlet Usage Heater Wiring Gas Meter Size Natural Gases Only Gas Line Leak TestingGas Piping PurgingInitial Start Up Start upPrior to Start Up Checking the Input Water Temperature AdjustmentMultiple Appliance Installations Checking VentingLighting & Operating Label Sequence of OperationYES Sequence of Operation Flow ChartIntake Air Screen MaintenanceTemperature-Pressure Relief Valve Test Venting SystemTo Flush the Water Heater Storage Tank Draining and FlushingDeliming Solvents To Drain the Water Heater Storage TankChemical Hazard Tank Cleanout ProcedureDeliming Using Flo-Jug Method Electrical Servicing System DiagnosticsIgnition Control System Operational Conditions High Water Temperature Shut OFF SystemFor Your Information Start Up ConditionsComplaint Cause Remedy User TroubleshootingQualified Service Agency Water Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page ALL Other Parts Limited Warranty