State Industries SBL85 390NE(A), SBL85 275NE(A), SBL95 199NE Multi Flue Flue 4 Units

Page 46

LEGEND

MULTI FLUE FLUE (4 UNITS)

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

HOT WATER

TO FIXTURES

46

PIPE T&P TO

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

OPEN DRAIN

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

PIPE T&P TO

OPEN DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

COLD WATER

SUPPLY

FINISHED FLOOR

EXPANSION

TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

Image 46
Contents Commercial gas water heaters SBL95 199NE SBL85 275NEA SBL85 390NEA Ultra Low NOx SeriesTable Of Contents Safe Installation, Use and Service ApprovalsFire or Explosion Hazard General Safety InformationFire and Explosion Hazard Grounding Instructions PrecautionsHydrogen Gas Flammable Abbreviations Used Qualified Installer or Service AgencyIntroduction QualificationsBlower/Burner Assembly High Limit Switch Features and ComponentsHydrocannon self-cleaning system ControlsRough-In-Dimensions Installation considerationsRough In Dimensions Recovery Capacities, based on 82% efficiencyLocating the Water Heater ClearancesHard Water NSF Leg KitInsulation Blanket Circulation PumpsHigh Altitude Installations Breathing Hazard Carbon Monoxide GasInstallation Requirements Closed Water Systems Temperature-Pressure Relief ValveDishwashing Machines Thermal ExpansionContaminated Air Water Damage HazardCombustible Material Storage Valve Discharge Pipe RequirementsConfined Space Air RequirementsUnconfined Space VentingOutdoor Air Through Two Openings Multiple Heater Manifold Outdoor Air Through One OpeningFresh Air Openings for Confined Spaces Outdoor Air Through Two Horizontal DuctsOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesType B GAS Vent Technical Data VentingMultiple Gas Fired Tank-Type Heaters Model SBL85 275NEA Water Line Connections Water heater installationValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Heater Wiring Purging Gas Line Leak TestingGas Piping Gas Meter Size Natural Gases OnlyPrior to Start Up Start upInitial Start Up Checking Venting Water Temperature AdjustmentMultiple Appliance Installations Checking the InputSequence of Operation Lighting & Operating LabelSequence of Operation Flow Chart YESVenting System MaintenanceTemperature-Pressure Relief Valve Test Intake Air ScreenTo Drain the Water Heater Storage Tank Draining and FlushingDeliming Solvents To Flush the Water Heater Storage TankDeliming Using Flo-Jug Method Tank Cleanout ProcedureChemical Hazard Ignition Control System System DiagnosticsElectrical Servicing Start Up Conditions High Water Temperature Shut OFF SystemFor Your Information Operational ConditionsQualified Service Agency TroubleshootingComplaint Cause Remedy User Diagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page Limited Warranty ALL Other Parts