State Industries SBL85 275NE(A), SBL85 390NE(A) Start up, Prior to Start Up, Initial Start Up

Page 24

Start up

Prior to Start Up

Installation and start up of this water heater requires abilities and skills equivalent to that of a licensed tradesman in the field involved, see Qualifications on page 6.

Do not place the water heater in operation if any part has been under water. Immediately call a qualified service technician to inspect the water heater and to replace any part of the control system and any gas control which has been under water.

Light the water heater in accordance with the Lighting and Operation Instruction label on the water heater and in this manual on page 26.

The water heaters covered by this manual are equipped with an electronic control system that automatically sequences the Blower, the Igniter, the 24 VAC Gas Valve, Burner ignition, and flame sensing. The control system will lock out after three unsuccessful ignition attempts.

Before attempting start up, thoroughly study and familiarize yourself with the exact Sequence Of Operation, see the written Sequence Of Operation on page 26 and the Sequence Of Operation Flow Chart on page 27.

Be certain that the water heater is full of water, that air is purged from the gas and water lines and that there are no leaks in the gas and water lines. Ensure all inlet water valves are open.

Filling The Water Heater

Follow these steps to fill the water heater prior to start up.

1.Close the heater drain valve.

2.Open a nearby hot water faucet to permit the air in the system to escape.

3.Fully open the cold water inlet valve allowing the piping and water heater to fill with water.

4.Close the hot water faucet opened in Step 2 as water starts to flow.

Supply Gas Line Purging

Fire or Explosion Hazard

Gas line purging is required with new piping or systems in which air has entered.

To avoid risk of fire or explosion purge discharge must not enter into confined areas or spaces where ignition can occur.

The area must be well ventilated and all sources of ignition must be deactivated or removed.

Use only the gas shown on the water heater rating label.

Keep ignition sources away from faucets after extended periods of non-use.

Read instruction manual before

installing, using or servicing

water heater.

1.Close the Main Gas Shutoff Valve, see Figure 21 on page 23.

2.Purge all air from the supply gas line up to the water heater’s Main Gas Shutoff Valve.

3.When all air has been purged from the supply gas line, tighten all supply gas line connections.

4.Check for gas leaks, see Gas Line Leak Testing on page 23 and repair any leaks found.

Initial Start Up

Required Test Equipment

U-tube manometer, pressure gauge, or digital manometer. Recommended range: 20” W.C. (5 kPa).

Note: All test equipment must be acclimated to ambient temperature before calibration and use.

Preparation

1.Adjust the thermostat to the lowest temperature setting.

2.Turn the water heater’s on/off switch to the “off” position.

3.Close the Main Gas Shut Off Valve, see Figure 21 on page 23.

4.Wait five (5) minutes for any residual gas to clear.

5.Open the Supply Gas Pressure Port on the gas valve by turning the center screw counter-clockwise. Connect the manometer to the supply gas pressure test port, see Figure 22 on page 25.

6.Open the Main Gas Shutoff Valve.

7.Measure and record the supply gas pressure, this is a “static” supply gas pressure reading; while the water heater is not firing.

Figure 22. – Top View

Lighting The Water Heater

1.Turn the water heater’s on/off switch to the “on” position.

2.Adjust the thermostat to the desired water temperature.

3.Record the supply gas pressure when the 24 VAC Gas Valve is energized and the Burner is operating. This is a “dynamic” gas pressure reading; while the water heater is firing.

4.Compare the actual supply gas pressure reading recorded above to the required minimum/maximum values given in Table 3 on page 8. Adjust supply gas pressure as necessary, see the instructions that follow.

5.After the supply gas pressure adjustments are complete, turn off the water heater and close the Main Gas Supply Shut Off Valve. Disconnect the manometer from the Supply Gas Pressure Port and turn the center screw clockwise until the port is closed.

Supply Gas Pressure Adjustment

Fire and Explosion Hazard

Do not use water heater with any gas other than the gas shown on the rating label.

Excessive gas pressure to gas valve can cause serious injury or death.

Turn off gas lines during installation.

Contact a qualified installer or service agency for installation and service.

24

Image 24
Contents Commercial gas water heaters SBL95 199NE SBL85 275NEA SBL85 390NEA Ultra Low NOx SeriesTable Of Contents Safe Installation, Use and Service ApprovalsGeneral Safety Information Fire or Explosion HazardFire and Explosion Hazard Precautions Grounding InstructionsHydrogen Gas Flammable Qualified Installer or Service Agency IntroductionAbbreviations Used QualificationsFeatures and Components Hydrocannon self-cleaning systemBlower/Burner Assembly High Limit Switch ControlsInstallation considerations Rough In DimensionsRough-In-Dimensions Recovery Capacities, based on 82% efficiencyLocating the Water Heater ClearancesNSF Leg Kit Insulation BlanketHard Water Circulation PumpsHigh Altitude Installations Breathing Hazard Carbon Monoxide GasInstallation Requirements Temperature-Pressure Relief Valve Dishwashing MachinesClosed Water Systems Thermal ExpansionWater Damage Hazard Combustible Material StorageContaminated Air Valve Discharge Pipe RequirementsAir Requirements Unconfined SpaceConfined Space VentingMultiple Heater Manifold Outdoor Air Through One Opening Fresh Air Openings for Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesTechnical Data Venting Type B GAS VentMultiple Gas Fired Tank-Type Heaters Model SBL85 275NEA Water heater installation Water Line ConnectionsValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Heater Wiring Gas Line Leak Testing Gas PipingPurging Gas Meter Size Natural Gases OnlyStart up Prior to Start UpInitial Start Up Water Temperature Adjustment Multiple Appliance InstallationsChecking Venting Checking the InputSequence of Operation Lighting & Operating LabelSequence of Operation Flow Chart YESMaintenance Temperature-Pressure Relief Valve TestVenting System Intake Air ScreenDraining and Flushing Deliming SolventsTo Drain the Water Heater Storage Tank To Flush the Water Heater Storage TankTank Cleanout Procedure Deliming Using Flo-Jug MethodChemical Hazard System Diagnostics Ignition Control SystemElectrical Servicing High Water Temperature Shut OFF System For Your InformationStart Up Conditions Operational ConditionsTroubleshooting Qualified Service AgencyComplaint Cause Remedy User Diagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page Limited Warranty ALL Other Parts