MULTI FLUE - (2 UNITS) WITH HORIZONTAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

HOT WATER TO FIXTURES

LEGEND

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

40

 

 

HOT WATER

 

 

RETURN FROM

PIPE T&P TO

PIPE T&P TO

FIXTURES

ALTERNATE

OPEN DRAIN

OPEN DRAIN

LOCATION

 

 

 

 

COLD WATER

 

 

SUPPLY

FINISHED

 

EXPANSION

 

TANK

FLOOR

 

 

 

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 40
Contents Commercial gas water heaters SBL95 199NE SBL85 275NEA SBL85 390NEA Ultra Low NOx SeriesTable Of Contents Safe Installation, Use and Service ApprovalsFire or Explosion Hazard General Safety InformationFire and Explosion Hazard Grounding Instructions PrecautionsHydrogen Gas Flammable Qualified Installer or Service Agency IntroductionAbbreviations Used QualificationsFeatures and Components Hydrocannon self-cleaning systemBlower/Burner Assembly High Limit Switch ControlsInstallation considerations Rough In DimensionsRough-In-Dimensions Recovery Capacities, based on 82% efficiencyLocating the Water Heater ClearancesNSF Leg Kit Insulation BlanketHard Water Circulation PumpsHigh Altitude Installations Breathing Hazard Carbon Monoxide GasInstallation Requirements Temperature-Pressure Relief Valve Dishwashing MachinesClosed Water Systems Thermal ExpansionWater Damage Hazard Combustible Material StorageContaminated Air Valve Discharge Pipe RequirementsAir Requirements Unconfined SpaceConfined Space VentingMultiple Heater Manifold Outdoor Air Through One Opening Fresh Air Openings for Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesType B GAS Vent Technical Data VentingMultiple Gas Fired Tank-Type Heaters Model SBL85 275NEA Water Line Connections Water heater installationValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Heater Wiring Gas Line Leak Testing Gas PipingPurging Gas Meter Size Natural Gases OnlyPrior to Start Up Start upInitial Start Up Water Temperature Adjustment Multiple Appliance InstallationsChecking Venting Checking the InputSequence of Operation Lighting & Operating LabelSequence of Operation Flow Chart YESMaintenance Temperature-Pressure Relief Valve TestVenting System Intake Air ScreenDraining and Flushing Deliming SolventsTo Drain the Water Heater Storage Tank To Flush the Water Heater Storage TankDeliming Using Flo-Jug Method Tank Cleanout ProcedureChemical Hazard Ignition Control System System DiagnosticsElectrical Servicing High Water Temperature Shut OFF System For Your InformationStart Up Conditions Operational ConditionsQualified Service Agency TroubleshootingComplaint Cause Remedy User Diagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page Limited Warranty ALL Other Parts