State Industries SBN85390NE/A warranty

Page 14

TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE

WITH RECIRCULATION OF SANITIZING LOOP

NOTE 1: TOGGLE SWITCH CONTROLS 180°F (82°C) WATER CIRCULATION. INSTALL ON OR CLOSE TO DISHWASHING MACHINE. TOGGLE SWITCH MUST BE CLOSED (ON) DURING THE RINSE OPERATIONAND OPEN (OFF) WHEN DISHWASHER IS NOT OPERATING OR WHEN ON LONG STANDBY.

NOTE 2: INSTALLLINE TEMPERATURE CONTROL INAN UNINSULATED TEE BEYOND THE DISHWASHING MACHINE TAKEOFF IN THE SANITIZING LOOP. CONTROL SHOULD BE SET AT 185°F (85°C).

NOTE 3: ADJUST PLUG COCK SO THE SANITIZING LOOP FLOW RATE DOESNOTCAUSEUNNECESSARYTURBULENCEINTHETANK.

*TEMPERED WATER LOOP, IF USED, CONNECTTO POINT “A”.

**PIPE RELIEF VALVE TO OPEN DRAIN.

INSTALLIN ACCORDANCE WITH LOCAL CODES.

CAUTION: IF BUILDING COLD WATER SUPPLY HAS A BACKFLOW PREVENTER, CHECK VALVE OR WATER METER WITH CHECK VALVE. PROVISIONS FOR THERMAL EXPANSION OF WATER

IN THE HOTWATER SYSTEM MUST BE PROVIDED.

DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 25. IF HIGHER PREHEAT TEMPERATURES ARE NECESSARYTO OBTAIN ADEQUATE BOOSTER OUTPUT, ADDANANTI- SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

14

Image 14
Contents Models SBN71120NE Thru SBN85390NE/A Series Gasand Electrical Characteristics ROUGH-IN-DIMENSIONSFront View TOP View Back View ROUGH-IN-DIMENSIONS Table of Contents ForewordGeneral Safety Information SELF-CLEANING Hydro Cannon FeaturesHigh Altitude Installations High Limit SwitchDishwashing Machine Requirement Exhaust Inducer Blower AssyCirculating Pump UncratingModel Right LevelingClearances Back Ceiling SideVenting Hard WaterAIR Requirements UnconfinedspaceTechnical Data Venting Type B GAS VentTechnical Data Venting Water Potable Heating and Space Multiple Heater ManifoldWater Line Connections Relief ValveGeneral Installation DIAGRAMS-TOP INLET/OUTLET UsageTube Inlet Installation Code RestrictionsVertical Storage Tank and Forced Circulation Horizontal Storage Tank and Forced CirculationPage Installation DIAGRAMS-SIDE INLET/OUTLET Usage Circulating Return Line ConnectionHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank TWO Unit Manifold KIT Model Dimension aManifold Kits Three Unit Manifold KIT Four Unit Manifold KITHeater Wiring Single Unit Wiring Diagram SBN-120 Through 400AGAS Pressure Regulator GAS Pipingand Dirt LEG InstallationGAS Piping PurgingFilling OperationManifold GAS Pressure in Inches Water Column ALL Models Sequence of Operation Operating Instructions For Your Safety Read Before OperatingLighting and Operation Instructions Check the Ignitor Assembly Preventive MaintenanceWater Temperature Control Ignitor AssemblyChecking the Input Main BurnerGAS Valves HOT Water Odor Remote Storage Tank Temperature ControlVenting System Anode ROD InspectionDeliming Solvents Tank Cleanout ProcedureDeliming Using FLO-JUG Method Ignition Module System ServiceSystem Diagnostics Electrical ServicingYES Replacement PARTS, Service Handbooks and Training AidsSequence of Operation Flow Chart Operational Checklist Complaint Cause User ServicemanLindahl Parkway Ashland City, TN Phone 800-821-2017 Fax