State Industries SBN85390NE/A warranty TWO PRE-HEATERS with Booster Heater

Page 17

TWO TEMPERATURE - TWO PRE-HEATERS WITH MIXING VALVE OR BOOSTER

HEATER WITH OR WITHOUT BUILING RECIRCULATION

TWO PRE-HEATERS WITH MIXING VALVE

DANGER

TEMPERATURE SETTING SHOULD NOT

EXCEED SAFE USE TEMPERATURE AT

FIXTURES. SEE WATER TEMPERATURE

CONTROL WARNING ON PAGE 25. IF HIGHER

PREHEAT TEMPERATURES ARE NECESSARY

TO OBTAIN ADEQUATE BOOSTER OUTPUT,

ADD AN ANTI-SCALD VALVE FOR HOT WATER

SUPPLIED TO FIXTURES.

TWO PRE-HEATERS WITH BOOSTER HEATER

17

Image 17
Contents Models SBN71120NE Thru SBN85390NE/A Series Gasand Electrical Characteristics ROUGH-IN-DIMENSIONSFront View TOP View Back View ROUGH-IN-DIMENSIONS Foreword Table of ContentsGeneral Safety Information High Altitude Installations FeaturesSELF-CLEANING Hydro Cannon High Limit SwitchCirculating Pump Exhaust Inducer Blower AssyDishwashing Machine Requirement UncratingClearances LevelingModel Right Back Ceiling SideAIR Requirements Hard WaterVenting UnconfinedspaceType B GAS Vent Technical Data VentingTechnical Data Venting Water Line Connections Multiple Heater ManifoldWater Potable Heating and Space Relief ValveTube Inlet Installation Installation DIAGRAMS-TOP INLET/OUTLET UsageGeneral Code RestrictionsHorizontal Storage Tank and Forced Circulation Vertical Storage Tank and Forced CirculationPage Circulating Return Line Connection Installation DIAGRAMS-SIDE INLET/OUTLET UsageHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Manifold Kits Model Dimension aTWO Unit Manifold KIT Three Unit Manifold KIT Four Unit Manifold KITSingle Unit Wiring Diagram SBN-120 Through 400A Heater WiringGAS Piping GAS Pipingand Dirt LEG InstallationGAS Pressure Regulator PurgingFilling OperationManifold GAS Pressure in Inches Water Column ALL Models Sequence of Operation Operating Instructions For Your Safety Read Before OperatingLighting and Operation Instructions Water Temperature Control Preventive MaintenanceCheck the Ignitor Assembly Ignitor AssemblyChecking the Input Main BurnerGAS Valves Venting System Remote Storage Tank Temperature ControlHOT Water Odor Anode ROD InspectionDeliming Solvents Tank Cleanout ProcedureDeliming Using FLO-JUG Method System Diagnostics ServiceIgnition Module System Electrical ServicingYES Replacement PARTS, Service Handbooks and Training AidsSequence of Operation Flow Chart Complaint Cause User Serviceman Operational ChecklistLindahl Parkway Ashland City, TN Phone 800-821-2017 Fax