State Industries SBN85390NE/A warranty Manifold Kits, TWO Unit Manifold KIT, Model Dimension a

Page 19

MANIFOLD KITS

TWO UNIT MANIFOLD KIT

(PART NO. 78692)

MODEL

DIMENSION “A”

SBN71120NE

63”

SBN81154NE

68”

SBN100180NE

72”

SBN100199NE

72”

SBN100250NE

72”

SBN100275NE

72”

SBN85310NE

73”

SBN85366NE

73”

SBN85390NE

73”

THREE UNIT MANIFOLD KIT

(PART NO. 78593)

FOUR UNIT MANIFOLD KIT

(PART NO. 78694)

19

Image 19
Contents Models SBN71120NE Thru SBN85390NE/A Series Front View TOP View Back View ROUGH-IN-DIMENSIONS ROUGH-IN-DIMENSIONSGasand Electrical Characteristics Foreword Table of ContentsGeneral Safety Information High Limit Switch FeaturesHigh Altitude Installations SELF-CLEANING Hydro CannonUncrating Exhaust Inducer Blower AssyCirculating Pump Dishwashing Machine RequirementBack Ceiling Side LevelingClearances Model RightUnconfinedspace Hard WaterAIR Requirements VentingType B GAS Vent Technical Data VentingTechnical Data Venting Relief Valve Multiple Heater ManifoldWater Line Connections Water Potable Heating and SpaceCode Restrictions Installation DIAGRAMS-TOP INLET/OUTLET UsageTube Inlet Installation GeneralHorizontal Storage Tank and Forced Circulation Vertical Storage Tank and Forced CirculationPage Circulating Return Line Connection Installation DIAGRAMS-SIDE INLET/OUTLET UsageHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Three Unit Manifold KIT Four Unit Manifold KIT Model Dimension aManifold Kits TWO Unit Manifold KITSingle Unit Wiring Diagram SBN-120 Through 400A Heater WiringPurging GAS Pipingand Dirt LEG InstallationGAS Piping GAS Pressure RegulatorManifold GAS Pressure in Inches Water Column ALL Models OperationFilling Sequence of Operation Lighting and Operation Instructions For Your Safety Read Before OperatingOperating Instructions Ignitor Assembly Preventive MaintenanceWater Temperature Control Check the Ignitor AssemblyGAS Valves Main BurnerChecking the Input Anode ROD Inspection Remote Storage Tank Temperature ControlVenting System HOT Water OdorDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents Electrical Servicing ServiceSystem Diagnostics Ignition Module SystemSequence of Operation Flow Chart Replacement PARTS, Service Handbooks and Training AidsYES Complaint Cause User Serviceman Operational ChecklistLindahl Parkway Ashland City, TN Phone 800-821-2017 Fax