State Industries warranty Models SBN71120NE Thru SBN85390NE/A Series

Page 1

MODELS SBN71120NE THRU SBN85390NE/A Series 108

COMMERCIAL GAS, GLASS-LINED, TANK-TYPE WATER HEATER

INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY

Thank you for buying this energy efficient water heater from State Water Heaters. We appreciate your confidence in our products.

CAUTION

TEXT PRINTED OR OUTLINED IN RED CONTAINS

INFORMATION RELATIVE TO YOUR SAFETY. PLEASE READ

THOROUGHLY BEFORE INSTALLING AND USING THIS

APPLIANCE.

500 LINDAHL PARKWAY ASHLAND CITY, TN 37015 www.stateind.com

PLACETHESEINSTRUCTIONSADJACENTTOHEATER

ANDNOTIFYOWNERTOKEEPFORFUTUREREFERENCE.

Printed in U.S.A. 0603

PART NO. 195714-001

Image 1
Contents Models SBN71120NE Thru SBN85390NE/A Series Front View TOP View Back View ROUGH-IN-DIMENSIONS ROUGH-IN-DIMENSIONSGasand Electrical Characteristics Foreword Table of ContentsGeneral Safety Information High Altitude Installations FeaturesSELF-CLEANING Hydro Cannon High Limit SwitchCirculating Pump Exhaust Inducer Blower AssyDishwashing Machine Requirement UncratingClearances LevelingModel Right Back Ceiling SideAIR Requirements Hard WaterVenting UnconfinedspaceType B GAS Vent Technical Data VentingTechnical Data Venting Water Line Connections Multiple Heater ManifoldWater Potable Heating and Space Relief ValveTube Inlet Installation Installation DIAGRAMS-TOP INLET/OUTLET UsageGeneral Code RestrictionsHorizontal Storage Tank and Forced Circulation Vertical Storage Tank and Forced CirculationPage Circulating Return Line Connection Installation DIAGRAMS-SIDE INLET/OUTLET UsageHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Manifold Kits Model Dimension aTWO Unit Manifold KIT Three Unit Manifold KIT Four Unit Manifold KITSingle Unit Wiring Diagram SBN-120 Through 400A Heater WiringGAS Piping GAS Pipingand Dirt LEG InstallationGAS Pressure Regulator PurgingManifold GAS Pressure in Inches Water Column ALL Models OperationFilling Sequence of Operation Lighting and Operation Instructions For Your Safety Read Before OperatingOperating Instructions Water Temperature Control Preventive MaintenanceCheck the Ignitor Assembly Ignitor AssemblyGAS Valves Main BurnerChecking the Input Venting System Remote Storage Tank Temperature ControlHOT Water Odor Anode ROD InspectionDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents System Diagnostics ServiceIgnition Module System Electrical ServicingSequence of Operation Flow Chart Replacement PARTS, Service Handbooks and Training AidsYES Complaint Cause User Serviceman Operational ChecklistLindahl Parkway Ashland City, TN Phone 800-821-2017 Fax