Bradford-White Corp CX, D)W275T*(BN, C(S ECO Energy Cut Off Testing, GAS Control Replacement

Page 14

SERVICE PROCEDURE AG-III

Gas Control Testing and Replacement

For Models using White Rodgers or

Robertshaw Gas Control

ECO (Energy Cut Off) TESTING

Step 1. Disconnect thermocouple from gas control.

Step 2.

Using a multimeter capable of measuring Ohms (or continuity),

 

 

 

attach one lead (alligator clip) to the pilot tube. Insert the other lead

 

 

 

(probe) fully into the magnet opening, Be sure the probe makes

 

 

 

contact only at the top center of the magnet opening. Do not allow

Figure 23

 

 

the probe to make contact with the threaded sides of the opening.

 

 

 

Step 3.

If continuity is indicated, the ECO is OK. If continuity is not indicated, the ECO has opened and the

 

gas control must be replaced.

 

 

GAS CONTROL REPLACEMENT

Step 1. Rotate knob of the gas control

to the “OFF” position.

Step 2. Turn off gas supply to water heater.

Step 3. Disconnect gas supply line from gas control.

Step 4. Turn off water supply and drain water heater completely.

Step 5. Remove outer jacket burner access door.

Step 6. Slide open inner combustion chamber door.

For White Rodgers gas control, depress knob slightly and rotate clockwise to the “OFF” position.

Figure 24

For Robertshaw gas control, rotate knob clockwise to the “OFF” position.

Figure 25

Figure 26

Page 14

14

Image 14
Contents Service Manual Table of Contents Troubleshooting Chart LED Status Control Status Probable Cause LED Status Control Status Probable Cause Service Procedure Thermocouple Replacement Service Procedure AG-IOpen Circuit Thermocouple Testing An Open Circuit test Open Circuit Thermopile TestingClosed Circuit Thermopile Testing A Closed Circuit testThermopile Replacement Step Turn off gas supply to water heater. Rotate knob Pilot Assembly Inspection Cleaning and Replacement IGNITER/ELECTRODE Testing Replacement Line Pressure Service Procedure AG-IIIGas Control Testing and Replacement Magnet Assembly Testing Robertshaw Control Thermocouple TestingMagnet Assembly Testing White Rodgers Control ECO Energy Cut Off Testing GAS Control ReplacementInstallation of gas control Honeywell Thermowell Testing Determine Water Heater Tank Temperature Honeywell GAS Control & Thermowell Removal Honeywell GAS Control Removal from ThermowellHoneywell GAS Control Assembly to Thermalwell Service Procedure AG-IV Cast Iron Burner AdjustmentBurner Cleaning Steel & Cast Iron Burner Cleaning Service Procedure AG-V Diptube Inspection and ReplacementAnode Inspection and Replacement Turn gas control knob to OFF positionPage Page