SERVICE PROCEDURE AG-I

Thermocouple Testing and Replacement

For Models Using Honeywell Gas Control

OPEN CIRCUIT THERMOPILE TESTING

Step 1. Disconnect red and white thermopile wires from the wire harness leading to the gas control.

Step 2. Using a multimeter capable of reading millivolts, check across thermopile leads.

Step 3. Following the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual, proceed to light the pilot and allow the gas control to operate for three minutes.

NOTE:

It may be necessary to hold the gas control knob down in the “PILOT” position continuously throughout this test.

In an OPEN CIRCUIT test:

 

Any reading over 400 millivolts

 

indicates good thermopile output.

 

For readings under 400 millivolts

 

replacement of thermopile is

Figure 5

recommended.

CLOSED CIRCUIT THERMOPILE TESTING

Step 1. Closed circuit testing is the preferred method for testing the thermopile. Following the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual, proceed to light the pilot and allow the control to operate for three minutes.

Step 2. Using a multimeter capable of measuring millivolts, measure across thermopile connections at the gas control (see Figure 6).

In a CLOSED CIRCUIT test:

Any reading over 300 millivolts indicates good thermopile output. For readings under 300 millivolts replacement of thermopile is recommended.

Gas Control

Knob

NOTE:

It may be necessary to hold the gas control knob down in the “PILOT” position continuously throughout this test.

Thermopile

Connections at gas

control

Figure 6

Page 7

7

Image 7
Contents Service Manual Table of Contents Troubleshooting Chart LED Status Control Status Probable Cause LED Status Control Status Probable Cause Service Procedure Open Circuit Thermocouple Testing Service Procedure AG-IThermocouple Replacement A Closed Circuit test Open Circuit Thermopile TestingClosed Circuit Thermopile Testing An Open Circuit testThermopile Replacement Step Turn off gas supply to water heater. Rotate knob Pilot Assembly Inspection Cleaning and Replacement IGNITER/ELECTRODE Testing Replacement Gas Control Testing and Replacement Service Procedure AG-IIILine Pressure Magnet Assembly Testing White Rodgers Control Thermocouple TestingMagnet Assembly Testing Robertshaw Control GAS Control Replacement ECO Energy Cut Off TestingInstallation of gas control Honeywell Thermowell Testing Determine Water Heater Tank Temperature Honeywell GAS Control Removal from Thermowell Honeywell GAS Control & Thermowell RemovalHoneywell GAS Control Assembly to Thermalwell Cast Iron Burner Adjustment Service Procedure AG-IVBurner Cleaning Steel & Cast Iron Burner Cleaning Diptube Inspection and Replacement Service Procedure AG-VTurn gas control knob to OFF position Anode Inspection and ReplacementPage Page