Bradford-White Corp Modulating Boiler, BNTH 6B.1 BNTV Water Quality, 6B.2 Piping Requirements

Page 29
SECTION 6B.

Brute Elite

Page 29

 

 

SECTION 6B.

Water Connections - BNTV Water Heater

Section 6 is divided into two parts. The first is for BNTH models and is Section 6A. The second is for BNTV models and is Section 6B. Refer to the proper section for instructions in installing and piping your product. Refer to Table 9 for pipe sizes required.

6B.1 BNTV Water Quality

BNTV water heaters must be installed in water conditions of 10gpg hardness or less with a pH range of

8.2to 9.5. Operating the BNTV in water with higher hardness levels will cause heat exchanger fouling, erosion, or corrosion leading to premature component failure, reduced efficiency, heat exchanger failure or system failure. Failure of this type will not be warranted. If the water in use exceeds the conditions recommended water softeners or other devices should be installed to improve water quality.

6B.2 Piping Requirements

Water piping should be supported by suitable

hangers and floor stands. Do not support piping with the appliance. Due to expansion and contraction of copper pipe, consideration should be given to the type of hangers and supports used. Rigid hangers may transmit noise through the system resulting from piping sliding in the hangers. It is recommended that padding be used when rigid hangers are installed. Maintain 1" (2.5cm) clearance to combustibles for hot water pipes.

Pipe the discharge of the relief valve (full size) to the drain or in a manner to prevent injury in the event of pressure relief. Install a diaphragm-type expansion tank, flow check, and shutoff valves where needed or as required by code.

Brute Elite 80-500 can be ordered with pumps. Whether the factory pumps or other pumps are installed the piping should be installed such that the pump supplies flow to the heater it is attached to only. The factory pumps are sized for 30 feet and 6 elbows of total pipe length, so the heater should be placed within 15 feet of the tank. If longer runs are required, properly- sized field-supplied pumps should be used.

WARNING: THIS DRAWING SHOWS

SUGGESTED PIPING CONFIGURATION AND

VALVING. CHECK WITH LOCAL CODES AND

ORDINANCES FOR ADDITIONAL REQUIREMENTS.

NOTES:

1.Optional CWMU & Recirc. line location.

2.Locate BNTV DHW sensor or remote aquastat well in lower 1/3 of tank.

3.Back flow preventer may be required - check local codes.

4.Thermal expansion tank may be required - check local codes.

5.Factory mounted pumps are sized for a max pipe length of 30' total, 6-90° elbows, full pipe size.

6.Caution: Pump sizing must be based opon water hardness at job site.

Figure 23. DHW Piping, One Heater, One Vertical Tank.

Image 29
Contents Document Installation and Operation InstructionsInstallation and Operation Instructions for BRUTE ELITEBrute Elite Control Setup and Operation TABLE OF CONTENTSSECTION General InformationTrouble Shooting SECTION MaintenanceReplacement Parts SECTION Modes of Operation1.1 Introduction SECTION General Information1.2 Model Identification Model NomenclatureFigure 2. Location of Components, Sizes Figure 1. Location of Components, SizesFigure 4. Location of Components, Size Figure 3. Location of Components, SizeFigure 6. Location of Components, Size Figure 5. Location of Components, SizeFigure 7. Location of Components, Sizes 750 and 1.6 Dimensions 1.4 Warranty1.3 Appliance Overview 1.5 UnpackingDimensions are nominal and are shown in inches, cm Figure 9. Dimensional Drawing, Sizes2.1 Locating the Appliance Brute Elite is for indoor installations onlySECTION Locating the Appliance 3.1 Combustion Air SECTION Venting and Combustion Air3.1.1 Combustion Air From Room 3.1.2 Ducted Combustion AirTable 5. Required Exhaust Vent Material 3.2 VentingFigure 10. Combustion Air and Vent Through Roof 3.2.1 Venting Requirements Unique to Canada 3.3 Locating Vent & Combustion Air TerminalsA. exhaust vent terminal not included E. CPVC exhaust pipe section 80-500 not incl3.3.2 Side Wall Combustion Air Terminal 3.3.5 Installations in the Commonwealth of Massachusetts5. For concentric vent, follow instructions included with vent kit 3.3.3 Vertical Vent TerminalFigure 12. Combustion Air and Vent Through Side Wall 2. Approved Carbon Monoxide Detectors 3.4 Common Vent Test3. Signage 4. Inspection3. Refer to Tables 6A, 6B, 6C and 6D to size piping SECTION Gas Supply and Piping4.1 Gas Supply and Piping 5.1 Brute Elite Boiler Flow and Head Requirements see Table SECTION Pump Requirements5.2 Brute Elite Water Heater Flow and Head Requirements see Table Table 6A6A.2 BNTH Cold Water Make-Up SECTION 6A Water Connections - BNTH Boiler6A.1 BNTH System Piping Hot Supply Connections 6A.3 Freeze Protection 6A.4 BNTH Suggested Piping Schematics6A.5 Recognized Chemicals 1. Sentinel Performance Solutions Group 2. Hercules Chemical CompanyFigure 15. Hydronic Piping - Single Boiler zoning with circulators Page Figure 17. Hydronic Piping - Multiple Boilers zoning with circulators Page Brute ElitePage Page Brute ElitePage 6B.1 BNTV Water Quality SECTION 6B6B.2 Piping Requirements Water Connections - BNTV Water Heater6B.3 Cold Water Make-Up 6B.5 BNTV Suggested Piping Schematics6B.4 Freeze Protection 6B.6 BNTV Suggested PumpsFigure 26. DHW Piping, Two Heaters, Two Vertical Tanks Figure 25. DHW Piping, Two Heaters, One Vertical TankCaution Pump sizing must be based opon water hardness at job siteSECTION Electrical Connections 7.1 Main Power7.2 Pump Connections 7.10 Lead Lag/ Cascading Wiring Connections7.3 24Vac Transformer with Integral Circuit Breaker 7.4 Hydronic Call for HeatFigure 28. Lead-Lag / Cascading Wiring Connections Figure 29. Ladder Diagram 7.11 Wiring Diagrams see Figures 29 andFigure 30. Wiring Diagram all sizes 8.2 Ignition Control- Sequence of Events SECTION Brute Elite Control Setup and Operation8.1 Display Navigation 8.5 Anti-Short Cycle ASC 8.3 Modulation Control8.5 High Limit 8.7 Outlet Water Temperature8.13 Boiler Pump Interrupt 8.12.5 Lead Lag Base Load Setting8.12.1 Lead Lag Setpoint 8.12.2 Lead Lag Master/Slave Selection9.4 Hydronic Heating Using External Modulation Control 9.2 Hydronic Heating with Outdoor ResetSECTION Modes of Operation 9.1 Hydronic Heating Demand9.7 Warm Weather Shutdown 9.5 Hydronic Heating Using Local Lead- Lag/Cascading Feature9.8 Domestic Hot Water Demand BNTV only Let’s consider the following example9.9 Domestic Hot Water Heating Using External Modulation Control SECTION Operating Instructions 10.2 Operating the Burner and Set Up10.1 Filling the Boiler System 10.2.1 Burner Operation10.3 Shutting Down Brute Elite 10.2.2 Boiler Setup and Adjustment10.4 To Restart Brute Elite 3. WAIT FIVE 5 MINUTESFigure 33B. Brute Elite Gas Valves 600, 750 and 80-285Figure 33A. Brute Elite Gas Valves 285, 399 and 11.1 System Maintenance SECTION Maintenance11.2 Appliance Maintenance and Component Description yearly, unless otherwise notedIgniters and sensors get hot and can cause burns or injury 11.2.4 Ignitor Assembly11.2.5 Flame Sensor 11.2.8 Heat Exchanger Coils 11.2.6 Transformer with Integral Circuit Breaker11.2.7 Blower 12.3 Error Codes - See Table SECTION Trouble Shooting11.2.9 Gas Pressure Switches optional 12.1 Sequence of OperationSOLUTION PROBLEMcontinued next page CODE#see Section Table 18. Error Codes13.2 Parts List SECTION Replacement Parts13.1 General Information Jacket Components - See FigureGas Train Components - See Figure Heat Exchanger Components - See Figure Electrical Components - See Figure Contact Customer Service at 800 900-9275Figure 35. Jacket Components Figure 36B. Internal Components, Sizes Figure 36A. Internal Components, SizesFigure 36C. Internal Components, Sizes Figure 37A. Gas Train Components, Sizes Figure 37B. Gas Train Components, Sizes Figure 38. Heat Exchanger Components Figure 39. Electrical Components Page Service Parts 800 Tech. Service 800Warranty Service 800 Ambler, PA