8.6 Troubleshooting Copper Brute II Controls

The Copper Brute II series consists of two 2- stage models (500 and 750), one 3-stage model (1000), and four 4-stage models (1250 to 2000). The 2-stage models have one ignition module, and the 3- and

4-stage models have two ignition modules capable of independent operation.

A diagnostic panel, that includes test points, as well as diagnostic lights, is provided in the control module. It is located on the right side of the module, behind the display. To access, remove the retaining screws from the display cover panel and remove it. Grasp the control module at its base and pull it outward. Ladder diagrams are shown in Figures 18 through 20. Voltage test points on the diagnostic panel are indicated by solid circles connected by short diagonal lines.

Figure 18 shows the diagram for the 2-stage models 500 and 750. These have one blower and one ignition module. The blower is energized directly through the “inducer” terminals F1 and F2 of the (Fenwal) ignition module. The 24V power to the 2nd stage gas valve is routed through the 1st stage VALVE terminal, so that stage 2 cannot fire unless the stage 1 gas valve is open. The 750 differs from the 500 only in that the 750 has two gas trains in stage 1, while the 500 has only one.

The ladder diagram for the model 1000 is shown in Figure 19. Ignition module #1 handles stages 1 and 2, and ignition module #2 handles stage 3. The single blower is energized directly through the “inducer” terminals of either ignition module. The 24V power to the T’STAT terminal of both ignition modules is routed through the safety interlocks.

The ladder diagram for models 1250 to 2000 is shown in Figure 20. These 4-stage models have two ignition modules, each with its own blower, and each controlling 2 stages. The blowers are energized by the ignition modules indirectly via switching relays. When either ignition module receives a call for heat, it switches its blower to high speed and the blower of the idle ignition module to low speed.

The wiring schematics for the Copper Brute II 500 – 1000 are shown in Figure 21, and the schematics for the 1250 to 2000 are shown in Figure 22. All 24V wiring is routed through the diagnostic PC board. Wiring harnesses connect between the diagnostic PC board and the control components, indicator board, or field wiring terminal strip. The diagnostic board contains LEDs that indicate open status of the safety interlocks, and quick-connect terminals that provide tests points for checking voltage/continuity at various points in the control circuit. Line-voltage connections are routed via the line-voltage terminal buss.

Certain control elements that may need to be re-wired in the field are connected via the field wiring terminal strip rather than to the diagnostic PC board. These include the low-water cutoff (LWCO), water flow switch, and inlet/outlet water temperature sensors.

Image 36
Contents Internet Version for Reference Only Installation and Operation Instructions forInstallation and Operation Instructions Copper BruteTABLE OF CONTENTS SECTION 7. MaintenanceSECTION 8. Trouble Shooting SECTION 9. Wiring DiagramsSECTION General Information 1.1 Introduction1.2 Model Identification 1.4 Dimensions 1.3 Warranty1.5 Locating the Appliance Figure 1. Dimensional Data SECTION Venting and Combustion Air 1.6 Locating Pump-Mounted Water Heater with Respect to Storage TanksFrom Outside Wall 2.1 Combustion Air2.1.2 Intake Combustion Air 2.2 Venting 2.2.1 Vent Categories2.2.2 Category I Vent 2.2.3 Common Venting SystemsFigure 3. Combustion Air and Vent Through Side Wall 2.3 Locating Vent & Combustion Air Terminals Important Note Massachusetts Code Requirement2.3.1 Side Wall Vent Terminal 2.3.2 Side Wall Combustion Air Terminal2.4 Common Vent Test 2.5 Vent Terminals for Outdoor Units2.3.3 Vertical Vent Terminal 2.3.4 Vertical Combustion Air TerminalSECTION Gas Supply and Piping 3.1 Gas Supply and PipingSECTION Water Connections Copper Brute II Water Heater 4.1 Water System Piping Water Heater4.2 Hot Water Supply Piping - Water Heater 4.3 Water Flow Requirements - Water HeaterTable 8. Water Flow Requirements Figure 4. Water Heater Piping - One Heater, One TankFigure 5. Water Heater Piping - Multiple Heaters, One Tank Figure 6. Water Heater Piping - One Heater, Multiple Tanks Figure 7. Water Heater Piping - Multiple Heaters, Multiple Tanks 5.1 Main Power SECTION Electrical Connections4.4 Combined Water Heating potable and Space Heating - Water Heater 4.5 Freeze Protection - Water Heater5.3 External Staging Control Wiring AVERTISSEMENTSECTION Operating Instructions 6.1 Sequence of Operation6.2 Programming the Temperature Control 6.2.1 System Piping “Primary Secondary Piping” “Parallel Piping”6.2.2 Choosing the Mode 6.2.3 Programming6.3.3 for more information BOIL MAX Boiler Maximum Temperature Boiler Start BOIL START The BOIL 6.2.4 Choosing the Mode for your Application Mechanical aquastat in a domestic hot water storage tank6.3 Advanced Topics Mode 5 Primary secondary piping with outdoor reset6.3.1 Differential 6.3.2 Staging Mode6.3.3 Boiler Minimum BOIL MIN 6.3.4 Boiler Maximum BOIL MAX 6.3.5 Boiler Target Temperature6.3.6 Pump Operation 6.3.7 Set point Operation6.3.9 Outdoor Reset Operation Outdoor Design OUTDR DSGN - The6.3.10 External Heater Operation 6.4 Operating the Burner and Set Up 6.4.1 Set Up for 0 to 2500 Feet Altitude6.3.11 Limit Controls 6.3.12 Advanced Programming ModeSECTION Maintenance 7.1 System Maintenance6.5 Shutting Down the Copper Brute 6.6 To Restart the Copper Brute7.2 Appliance Maintenance and Component Description 7.2.4 Manual Reset High Limit Control 7.2.5 Automatic Reset High Limit Control7.2.1 Burners 7.2.2 Filter7.2.12 Flow Switch 7.2.9 Ignition Sensors7.2.10 Transformer 7.2.11 BlowersSECTION Trouble Shooting 8.1 Resolving Lockouts8.2 Delayed Ignition - Possible Causes 8.3 Short CyclingERROR DISPLAYED DESCRIPTION OF ERROR8.6 Troubleshooting Copper Brute II Controls SECTION Wiring Diagrams Figure 18. Copper Brute II 500 - 750 Ladder DiagramFigure 19. Copper Brute II 1000 Ladder Diagram Figure 20. Copper Brute II 1250 - 2000 Ladder Diagram Figure 21. Copper Brute II 500 - 1000 Wiring Schematic Figure 22. Copper Brute II 1250 - 2000 Wiring Schematic Note Positions of field wiring terminals may vary, but Figure 23. Field Wiringterminal designations are as indicated Reference Only Wiring for Modes 1Figure 24. Field MODEVersion for Reference Only 25. Field Wiring for ModeInternet Copper Brute II 1250, 1500, 1750 & 2000 4-Stage Heater