Bradford-White Corp
BWCV
warranty
Internet Version for Reference Only, Copper Brute, Page
Troubleshooting
SECTION Wiring Diagrams
Error Displayed
Field Wiring
Warranty
Dimension
Maintenance
Outdoor Reset Operation
Main Power
Flow Switch
Page 39
Page 38
Page 40
Image 39
Page 38
Page 40
Contents
Copper Brute
Internet Version for Reference Only
Installation and Operation Instructions for
Installation and Operation Instructions
SECTION 9. Wiring Diagrams
TABLE OF CONTENTS
SECTION 7. Maintenance
SECTION 8. Trouble Shooting
SECTION General Information
1.1 Introduction
1.2 Model Identification
1.4 Dimensions
1.3 Warranty
1.5 Locating the Appliance
Figure 1. Dimensional Data
2.1 Combustion Air
SECTION Venting and Combustion Air
1.6 Locating Pump-Mounted Water Heater with Respect to Storage Tanks
From Outside Wall
2.1.2 Intake Combustion Air
2.2.3 Common Venting Systems
2.2 Venting
2.2.1 Vent Categories
2.2.2 Category I Vent
Figure 3. Combustion Air and Vent Through Side Wall
2.3.2 Side Wall Combustion Air Terminal
2.3 Locating Vent & Combustion Air Terminals
Important Note Massachusetts Code Requirement
2.3.1 Side Wall Vent Terminal
2.3.4 Vertical Combustion Air Terminal
2.4 Common Vent Test
2.5 Vent Terminals for Outdoor Units
2.3.3 Vertical Vent Terminal
3.1 Gas Supply and Piping
SECTION Gas Supply and Piping
4.3 Water Flow Requirements - Water Heater
SECTION Water Connections Copper Brute II Water Heater
4.1 Water System Piping Water Heater
4.2 Hot Water Supply Piping - Water Heater
Figure 4. Water Heater Piping - One Heater, One Tank
Table 8. Water Flow Requirements
Figure 5. Water Heater Piping - Multiple Heaters, One Tank
Figure 6. Water Heater Piping - One Heater, Multiple Tanks
Figure 7. Water Heater Piping - Multiple Heaters, Multiple Tanks
4.5 Freeze Protection - Water Heater
5.1 Main Power
SECTION Electrical Connections
4.4 Combined Water Heating potable and Space Heating - Water Heater
AVERTISSEMENT
5.3 External Staging Control Wiring
SECTION Operating Instructions
6.1 Sequence of Operation
6.2 Programming the Temperature Control
6.2.3 Programming
6.2.1 System Piping “Primary Secondary Piping”
“Parallel Piping”
6.2.2 Choosing the Mode
6.3.3 for more information BOIL MAX Boiler Maximum Temperature
Boiler Start BOIL START The BOIL
Mechanical aquastat in a domestic hot water storage tank
6.2.4 Choosing the Mode for your Application
Mode 5 Primary secondary piping with outdoor reset
6.3 Advanced Topics
6.3.1 Differential
6.3.2 Staging Mode
6.3.3 Boiler Minimum BOIL MIN
6.3.7 Set point Operation
6.3.4 Boiler Maximum BOIL MAX
6.3.5 Boiler Target Temperature
6.3.6 Pump Operation
6.3.9 Outdoor Reset Operation
Outdoor Design OUTDR DSGN - The
6.3.10 External Heater Operation
6.3.12 Advanced Programming Mode
6.4 Operating the Burner and Set Up
6.4.1 Set Up for 0 to 2500 Feet Altitude
6.3.11 Limit Controls
6.6 To Restart the Copper Brute
SECTION Maintenance
7.1 System Maintenance
6.5 Shutting Down the Copper Brute
7.2 Appliance Maintenance and Component Description
7.2.2 Filter
7.2.4 Manual Reset High Limit Control
7.2.5 Automatic Reset High Limit Control
7.2.1 Burners
7.2.11 Blowers
7.2.12 Flow Switch
7.2.9 Ignition Sensors
7.2.10 Transformer
8.3 Short Cycling
SECTION Trouble Shooting
8.1 Resolving Lockouts
8.2 Delayed Ignition - Possible Causes
DESCRIPTION OF ERROR
ERROR DISPLAYED
8.6 Troubleshooting Copper Brute II Controls
Figure 18. Copper Brute II 500 - 750 Ladder Diagram
SECTION Wiring Diagrams
Figure 19. Copper Brute II 1000 Ladder Diagram
Figure 20. Copper Brute II 1250 - 2000 Ladder Diagram
Figure 21. Copper Brute II 500 - 1000 Wiring Schematic
Figure 22. Copper Brute II 1250 - 2000 Wiring Schematic
Note Positions of field wiring terminals may vary, but
Figure 23. Field Wiring
terminal designations are as indicated
MODE
Reference Only
Wiring for Modes 1
Figure 24. Field
Copper Brute II 1250, 1500, 1750 & 2000 4-Stage Heater
Version for Reference Only
25. Field Wiring for Mode
Internet
Related manuals
Manual
64 pages
39.09 Kb
Related pages
How much does the
FPES3085KF Slide-In Range
weigh?
Top
Page
Image
Contents