Bradford-White Corp U4TW40T*FRN, U4TW50T*FRN, U4TW60T*FRN service manual Blower Testing

Page 28

Blower Testing

Step 5. Disconnect yellow wires from the pres- sure switch.

Yellow pressure

switch wires

Step 6. Reconnect wires from step 5 to new pressure switch.

Step 7. Reconnect tubing to new pressure switch.

Step 8. Carefully position pressure switch into blower housing.

Step 9. Position gas control power switch to the “ON” postion and verify proper heater operation.

Step 10. Replace control access cover form step 2.

Blower Testing

WARNING

115 volt potential exposure. Use caution making voltage checks to avoid

personal injury.

Step 1. Move the gas control power switch to the “ON” position and adjust control to call for heat.

Gas control power

switch

Step 2. Remove the three screws (Phillips screw driver) from the control access cover on the blower as- sembly and remove cover.

Control access

cover

Page 28

28

Image 28
Contents Service Manual Table of Contents Page Page Bradford White ECO-DEFENDER Safety System IntroductionHow to Use this Manual How the Safety System WorksTools Required for Service Tools RequiredSpecifications Vent Tables GallonSpecifications Wiring Diagram Control TimingsSequence of Operation Power Up SequenceNormal Heating Sequence Normal Heating Sequence cont’d Abnormal OperationAbnormal Operation cont’d Sequence of Operation Sequence of Operation Troubleshooting LED Status Control Status Probable Cause Service ProcedureTroubleshooting Troubleshooting Burner Cleaning Procedure Burner MaintenanceBurner Inspection Burner Cleaning Procedure cont’d Pilot Maintenance Pilot Inspection, Testing and ReplacementPilot Inspection, Testing and Replacement cont’d Page Pressure Switch Testing Pressure Switch TestingPressure Switch Testing cont’d Pressure Switch Replacement Pressure Switch ReplacementBlower Testing Blower TestingPage Blower Installation Blower ReplacementBlower Removal Blower Installation cont’d Blower Temperature Switch TestingBlower Temperature Switch Testing Blower Temperature Switch Testing cont’d Switch SettingBlower Temperature Switch Replacement Blower Temperature Switch ReplacementThermal Well Testing Thermal Well TestingThermal Well Testing cont’d Determine Tank TemperatureDetermine Water Temperature Inside Tank Sensor Resistance at Various Temperatures Component DisassemblyGas Control & Thermal Well Removal From Water Heater Gas Control Removal Gas Control Assembly to the Thermal Well Gas Control AssemblyGas Control Removal From Thermal Well cont’d Gas Control Assembly to the Thermal Well cont’d Flammable Vapor Sensor Testing Flammable Vapor Sensor TestingVAC Circuit Trace Safety Circuit Voltage Trace Safety Circuit Voltage TraceRemove the Blower to Gain Access to the Flue Baffle Blower RemovalDip Tube Inspection and Replacement Remove the Blower to Gain Access to the Flue Baffle cont’dDip Tube Inspection Anode Inspection and Replacement Anode InspectionInner Door Removal Procedure Inner Door RemovalInner Door Removal Procedure cont’d Inner Door Gasket ReplacementInner Door Gasket Replacement Procedure Inner Door Installation Inner Door Installation with GasketArrestor Cleaning ScreenLok Flame Arrestor Cleaning ProcedureCommon Terms Common TermsParts List Part Name and DescriptionParts@bradfordwhite.com Techserv@bradfordwhite.com