Bradford-White Corp U4TW40T*FRN Blower Temperature Switch Testing, Blower Installation cont’d

Page 31

Blower Temperature Switch Testing

Blower Installation (cont’d)

Step 11. Secure blower in place using mounting screws from step 7. Step 12. Reinstall exhaust adapter from step 4.

Step 13. Reinstall dilution air clip from step 5.

Step 14. Reconnect vent system to exhaust adapter.

Step 15. Reconnect cords from step 6.

Step 16. Position gas control power switch to the “ON” position. Step 17. Verify proper blower operation.

Blower Temperature Switch Testing

WARNING

115 volt potential exposure. Use caution making voltage checks to avoid

personal injury.

Step 1. Move the gas control power switch to the “OFF” position.

Gas control power

switch

Step 2. Remove the three screws (Phillips screw driver) from control access cover on blower and remove cover.

Control access

cover

Blower temperature

switch location

Step 3. Locate the blower temperature switch.

Air mixing

inlet

Page 31

31

Image 31
Contents Service Manual Table of Contents Page Page Introduction Bradford White ECO-DEFENDER Safety SystemHow the Safety System Works How to Use this ManualTools Required Tools Required for ServiceSpecifications Gallon Vent TablesSpecifications Control Timings Wiring DiagramSequence of Operation Power Up SequenceNormal Heating Sequence Abnormal Operation Normal Heating Sequence cont’dAbnormal Operation cont’d Sequence of Operation Sequence of Operation LED Status Control Status Probable Cause Service Procedure TroubleshootingTroubleshooting Troubleshooting Burner Cleaning Procedure Burner MaintenanceBurner Inspection Burner Cleaning Procedure cont’d Pilot Inspection, Testing and Replacement Pilot MaintenancePilot Inspection, Testing and Replacement cont’d Page Pressure Switch Testing Pressure Switch TestingPressure Switch Testing cont’d Pressure Switch Replacement Pressure Switch ReplacementBlower Testing Blower TestingPage Blower Installation Blower ReplacementBlower Removal Blower Installation cont’d Blower Temperature Switch TestingBlower Temperature Switch Testing Switch Setting Blower Temperature Switch Testing cont’dBlower Temperature Switch Replacement Blower Temperature Switch ReplacementThermal Well Testing Thermal Well TestingThermal Well Testing cont’d Determine Tank TemperatureDetermine Water Temperature Inside Tank Sensor Resistance at Various Temperatures Component DisassemblyGas Control & Thermal Well Removal From Water Heater Gas Control Removal Gas Control Assembly to the Thermal Well Gas Control AssemblyGas Control Removal From Thermal Well cont’d Gas Control Assembly to the Thermal Well cont’d Flammable Vapor Sensor Testing Flammable Vapor Sensor TestingVAC Circuit Trace Safety Circuit Voltage Trace Safety Circuit Voltage TraceBlower Removal Remove the Blower to Gain Access to the Flue BaffleDip Tube Inspection and Replacement Remove the Blower to Gain Access to the Flue Baffle cont’dDip Tube Inspection Anode Inspection Anode Inspection and ReplacementInner Door Removal Inner Door Removal ProcedureInner Door Removal Procedure cont’d Inner Door Gasket ReplacementInner Door Gasket Replacement Procedure Inner Door Installation with Gasket Inner Door InstallationScreenLok Flame Arrestor Cleaning Procedure Arrestor CleaningCommon Terms Common TermsPart Name and Description Parts ListParts@bradfordwhite.com Techserv@bradfordwhite.com