Bradford-White Corp U4TW60T*FRN, U4TW50T*FRN, U4TW40T*FRN Control Timings, Wiring Diagram

Page 11

Specifications

 

Control Timings

 

 

Ignition State

Timing

 

 

Pre-purge

15 seconds

 

 

Trial for Ignition

90 seconds

 

 

Flame Stabilization Period

3 seconds

 

 

Inter-purge

15 seconds

 

 

Flame Failure Response Time

1.5 seconds (2 second maximum, 1 second minimum)

 

 

Post-purge

15 seconds

 

 

PS Fault Delay (failed open/close)

Retry after 2 minutes

 

 

Soft Lockout

Retry after 5 minutes

 

 

TCO Limit Lockout

Indefinite (see page 34 to reset)

 

 

Verify Resistive Delay

Retry after 2 minutes (repeats 5 times)

 

 

Simulated Resistive Load Lockout

Indefinite (cycle power to reset)

 

 

Hardware Error Lockout

Indefinite (self clears if fault clears for at least 15 seconds)

 

 

Wiring Diagram

BLOWER

 

 

 

BLOWER

 

 

BLOWER

TEMPERATURE

 

 

MOTOR

SWITCH

 

 

 

 

 

 

M

PRESSURE

G

 

 

 

 

BL

SWITCH W

 

Y

 

 

 

W

 

R

BK

 

Y

 

G

 

 

 

 

 

PILOT

 

 

 

W

Honeywell

 

PLUG

 

BKBK

 

BK

G W

Y

 

R

 

BK BL

WATER TEMPERATURE

 

SENSOR

RESETTABLE

FLAMMABLE

 

THERMAL

VAPOR SENSOR

 

Page 11

11

Image 11
Contents Service Manual Table of Contents Page Page Introduction Bradford White ECO-DEFENDER Safety SystemHow the Safety System Works How to Use this ManualTools Required Tools Required for ServiceSpecifications Gallon Vent TablesSpecifications Control Timings Wiring DiagramNormal Heating Sequence Power Up SequenceSequence of Operation Abnormal Operation Normal Heating Sequence cont’dAbnormal Operation cont’d Sequence of Operation Sequence of Operation LED Status Control Status Probable Cause Service Procedure TroubleshootingTroubleshooting Troubleshooting Burner Inspection Burner MaintenanceBurner Cleaning Procedure Burner Cleaning Procedure cont’d Pilot Inspection, Testing and Replacement Pilot MaintenancePilot Inspection, Testing and Replacement cont’d Page Pressure Switch Testing Pressure Switch TestingPressure Switch Testing cont’d Pressure Switch Replacement Pressure Switch ReplacementBlower Testing Blower TestingPage Blower Removal Blower ReplacementBlower Installation Blower Temperature Switch Testing Blower Temperature Switch TestingBlower Installation cont’d Switch Setting Blower Temperature Switch Testing cont’dBlower Temperature Switch Replacement Blower Temperature Switch ReplacementThermal Well Testing Thermal Well TestingDetermine Water Temperature Inside Tank Determine Tank TemperatureThermal Well Testing cont’d Gas Control & Thermal Well Removal From Water Heater Component DisassemblySensor Resistance at Various Temperatures Gas Control Removal Gas Control Removal From Thermal Well cont’d Gas Control AssemblyGas Control Assembly to the Thermal Well Gas Control Assembly to the Thermal Well cont’d Flammable Vapor Sensor Testing Flammable Vapor Sensor TestingVAC Circuit Trace Safety Circuit Voltage Trace Safety Circuit Voltage TraceBlower Removal Remove the Blower to Gain Access to the Flue BaffleDip Tube Inspection Remove the Blower to Gain Access to the Flue Baffle cont’dDip Tube Inspection and Replacement Anode Inspection Anode Inspection and ReplacementInner Door Removal Inner Door Removal ProcedureInner Door Gasket Replacement Procedure Inner Door Gasket ReplacementInner Door Removal Procedure cont’d Inner Door Installation with Gasket Inner Door InstallationScreenLok Flame Arrestor Cleaning Procedure Arrestor CleaningCommon Terms Common TermsPart Name and Description Parts ListParts@bradfordwhite.com Techserv@bradfordwhite.com