Bradford-White Corp U4TW60T*FRN, U4TW50T*FRN Gas Control Assembly to the Thermal Well

Page 38

Gas Control Assembly

Gas Control Removal From Thermal Well (cont’d)

Step 3. Turn off the gas supply to the water heater and disconnect the gas piping from the gas control.

Step 4. Disconnect the pilot tube using a 7/16” wrench and the main burner feedline with a 3/4” wrench from the gas control.

Pilot and main

feedlines

Step 5. Disconnect the wire harnesses and spark igniter/ flame sense wire from the gas control.

Gas control

Spark igniter/flame

sensor wire

Step 6. Using the gas control service tool, p/n 239-45991- 00, available from your BWC parts supplier, insert the tool into the back of the gas control.

Gas control service

tool

Step 7. Pivot the tool towards the water heater, as far as possible. Lift straight up on the gas control. The gas control should move about 1/8". Hold the gas control in position and remove the tool. Lift straight up on the gas control to remove it completely from the thermal well.

Gas Control Assembly to the Thermal Well

Step 1. Install the threaded end of the thermal well into the tank. Be sure the thermal well flange is positioned properly to allow for proper gas control installation. Tighten the thermal well using a 1-5/16” wrench.

Page 38

38

Image 38
Contents Service Manual Table of Contents Page Page Bradford White ECO-DEFENDER Safety System IntroductionHow to Use this Manual How the Safety System WorksTools Required for Service Tools RequiredSpecifications Vent Tables GallonSpecifications Wiring Diagram Control TimingsNormal Heating Sequence Power Up SequenceSequence of Operation Normal Heating Sequence cont’d Abnormal OperationAbnormal Operation cont’d Sequence of Operation Sequence of Operation Troubleshooting LED Status Control Status Probable Cause Service ProcedureTroubleshooting Troubleshooting Burner Inspection Burner MaintenanceBurner Cleaning Procedure Burner Cleaning Procedure cont’d Pilot Maintenance Pilot Inspection, Testing and ReplacementPilot Inspection, Testing and Replacement cont’d Page Pressure Switch Testing Pressure Switch TestingPressure Switch Testing cont’d Pressure Switch Replacement Pressure Switch ReplacementBlower Testing Blower TestingPage Blower Removal Blower ReplacementBlower Installation Blower Temperature Switch Testing Blower Temperature Switch TestingBlower Installation cont’d Blower Temperature Switch Testing cont’d Switch SettingBlower Temperature Switch Replacement Blower Temperature Switch ReplacementThermal Well Testing Thermal Well TestingDetermine Water Temperature Inside Tank Determine Tank TemperatureThermal Well Testing cont’d Gas Control & Thermal Well Removal From Water Heater Component DisassemblySensor Resistance at Various Temperatures Gas Control Removal Gas Control Removal From Thermal Well cont’d Gas Control AssemblyGas Control Assembly to the Thermal Well Gas Control Assembly to the Thermal Well cont’d Flammable Vapor Sensor Testing Flammable Vapor Sensor TestingVAC Circuit Trace Safety Circuit Voltage Trace Safety Circuit Voltage TraceRemove the Blower to Gain Access to the Flue Baffle Blower RemovalDip Tube Inspection Remove the Blower to Gain Access to the Flue Baffle cont’dDip Tube Inspection and Replacement Anode Inspection and Replacement Anode InspectionInner Door Removal Procedure Inner Door RemovalInner Door Gasket Replacement Procedure Inner Door Gasket ReplacementInner Door Removal Procedure cont’d Inner Door Installation Inner Door Installation with GasketArrestor Cleaning ScreenLok Flame Arrestor Cleaning ProcedureCommon Terms Common TermsParts List Part Name and DescriptionParts@bradfordwhite.com Techserv@bradfordwhite.com