Gas Control Assembly
Gas Control Assembly to the Thermal Well (cont’d)
Step 2. Route the wire leads back into relief opening.
Wire leads on thermal well
Slots in thermal well
Relief opening
Step 3. Align the slots located on the thermal well flange with the tabs located on the back of the gas control.
Tabs on back of gas
control
Step 4. Carefully push the gas control back onto the thermal well flange as far as possible towards the water heater. Then, slide the gas control down to lock into posi- tion.
Step 5. Install the burner assembly and connect the pilot and main feedlines to the gas control using a 7/16” and 3/4” wrench, respectively.
Pilot and main
feedlines
Step 6. Reconnect the wire harnesses to the gas control.
Wire harnesses
Step 7. Reconnect the gas piping to the gas control. Re- store the gas supply and check for gas leaks.
Page 39
39