INITIAL OPERATION AND TESTING OF CONTROLS (INSTALLER ONLY)
1.Turn on power to the water heater and fully open a hot water tap.
2.Check the operation of the water heater. Check the operation of the remote temperature control(s). Check the operation of the power failure protection system (drain solenoids).
3.Explain the proper operation of the new Bradford White EverHot® water heater to the end user.
Troubleshooting – Electrical
There are a number of (live) tests that are required when fault finding this product. Extreme care should be used at all times to avoid contact with energized components inside the water heater. Only trained and qualified service technicians should attempt to repair this product. Before checking for resistance readings, disconnect the power source to the unit and isolate the item from the circuit (unplug it).
Table 14. (SV1, SV2, SV3, SV4, and POV) Gas Valve and Modulating Solenoids (Set Meter Above 2k).
Wire Color |
| Voltage | Resistance | Connector | Pin | |
| No. | Nos. | ||||
|
|
|
|
| ||
(SV0) |
| B5 | ||||
(SV1) |
| B6 | ||||
(SV2) |
| B7 | ||||
(SV3) |
| B3 | ||||
(SV4) |
| B4 | ||||
(POV) |
| B2 | ||||
| Table 15. (M) Water Flow Control Device Servo. |
| ||||
Wire Color |
|
| Voltage | Resistance | Connector | Pin |
|
| No. | Nos. | |||
|
|
|
|
| ||
Red or |
|
| n/a | G2 | 3 or 4- | |
|
| 8 | ||||
|
|
|
|
|
| |
Blue or White- |
|
| n/a | G2 | 1 or 2- | |
Orange |
|
| 8 | |||
|
|
|
|
| ||
|
| n/a | G2 | |||
|
| n/a | G2 | |||
|
| n/a | G2 | |||
|
| n/a | G2 | |||
Note: The grey | wire listed above | turns to black at F connector on the PCB. | ||||
|
|
| Table 16. (QS) Water Flow Sensor. |
|
| |
Wire Color |
|
| Voltage | Resistance | Connector | Pin |
|
| No. | Nos. | |||
|
|
|
|
| ||
| n/a | E5 | ||||
|
| E5 | ||||
|
|
| Table 17. |
|
| |
Wire Color |
|
| Voltage | Resistance | Connector | Pin |
|
| No. | Nos. | |||
|
|
|
|
| ||
|
|
|
| G1 | ||
|
| G1 | ||||
|
| in operating |
|
| ||
| G1 | |||||
|
| mode) |
| |||
|
|
| G1 | |||
|
|
|
| |||
Ground |
|
|
|
| ||
|
|
|
|
|
|
53