A.O. Smith HYB-90N warranty Installation Requirements For The Commonwealth Of Massachusetts

Page 10
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

For all side wall terminated, horizontally vented power vent, gas fueled water heaters installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and CSA certified.

SIGNAGE A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1.The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building, or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include

a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

10

www.hotwater.com

Image 10
Contents Installation and Operating Manual For Your SafetyPOWER VENT GAS MODELS HYBRID GAS WATER HEATERSTABLE OF CONTENTS IMPORTANT INFORMATIONSAFE INSTALLATION, USE AND SERVICE IMPORTANT DEFINITIONSGENERAL SAFETY DANGER INTRODUCTION Page REPLACEMENT PARTS AND DELIMING PRODUCTS GET TO KNOW YOUR WATER HEATER - GAS MODELSINSTALLATION CONSIDERATIONS ROUGH IN DIMENSIONSINSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS WATER PIPING - MIXING VALVE USAGE Water Potable Heating All models are consideredFACTS TO CONSIDER ABOUT LOCATION HANDLE INSTALLATION EARTHQUAKE ZONES Access ToScrews Top Casing FrontAPPLIANCES IN UNCONFINED SPACES COMBUSTION AIR AND VENTILATIONAPPLIANCES IN CONFINED SPACES B. ALL AIR FROM OUTDOORS See Figures 12, 13 and CLOSED WATER SYSTEMS CHEMICAL VAPOR CORROSIONWATER PIPING THERMAL EXPANSIONHARD WATER TEMPERATURE-PRESSURE RELIEF VALVET&P Valve and Pipe Insulation if supplied GAS PIPING SEDIMENT TRAPSFLOODING/FREEZING HIGH ALTITUDE INSTALLATIONSGAS LINE PURGING FILLING THE WATER HEATERVENT PIPE TERMINATION If using 2 inch vent pipePLANNING THE VENT SYSTEM TERMINATION ELBOW If using 3 inch vent pipeRODENT SCREEN INSTALL INTO ELBOW GROUND LEVEL OR MAXIMUM SNOW LINE ELBOW STRAPCONDENSATE INSTALLATION OF VENT SYSTEMVENT TERMINAL INSTALLATION, SIDEWALL CONDENSATION WARNINGINSTALLATION SEQUENCE SEQUENCE OF INSTALLATIONSVent terminals supplied with heater must be used INSTALLATION OF VENT SYSTEM, SIDEWALL INSTALLATION OF VERTICAL VENT SYSTEMVENT PIPE PREPARATION STEP A RECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICATIONSSTEP B STEP F U.S. POWER VENTSTEP E STEP G CONNECTION TO VENT PIPEVENT HOODS MAY BE EXTREMELY HOT DURING OPERATION FIGURE 33a ELECTRICAL CONNECTIONSCALIBRATION “OFF”, “up”OPERATING INSTRUCTIONS DISPLAY PANELNumeric Display CONTROLS. WIRING ERRORS CAN CAUTION LABEL ALL WIRES PRIOR TODISCONNECTION WHEN SERVICING CAUSE IMPROPER AND DANGEROUSOPERATING INSTRUCTIONS LIGHTING INSTRUCTIONSFOR YOUR SAFETY READ BEFORE LIGHTING TO TURN OFF GAS TO APPLIANCESTATE HEAT CYCLE DEFINITIONSDESCRIPTION TEMPERATURE REGULATION UNIQUE HYBRID FEATURES Temperature ProbesWater Circulation Pump Line Voltage Monitor START UP CONDITIONS CONSTANT OUTPUT TEMPERATURE CONTROLDetection of Failure to Maintain Desired Constant Temperature OPERATIONAL CONDITIONSVENTING SYSTEM INSPECTION MAINTENANCEHOUSEKEEPING BURNER OPERATION AND INSPECTIONTEMPERATURE-PRESSURE RELIEF VALVE OPERATION ANODE ROD REPLACEMENTCLEANING THE INLET WATER FILTER MOTORSCLEANING THE HEAT ENGINE FLUSHING THE HEAT EXCHANGER LIME BUILD- UPFAULT INDICATION AND ERROR CODES DRAINING THE TANKCode and DIAGNOSTIC DISPLAYDiagnostic DisplayedCause FaultLockout RemedyCode FaultLockout DescriptionCode TROUBLESHOOTING b.The unit display is an error code WHEN THE TAP IS OPENEDCheck if there is any error code on system installed, or there is aSERVICE LEAKAGE CHECKPOINTSITEM # PARTS IDENTIFICATIONA Baffle, Flue B Hot Water Outlet Nipple w/ Anode, Heat Trap AB C DEF G T SH R I Q P REPLACEMENT PARTS DESCRIPTION KIT #CLAIM PROCEDURE LIMITED RESIDENTIAL GAS WARRANTYSERVICE AND LABOR RESPONSIBILITY CONDITIONS AND EXCEPTIONSPage Page 500 TENNESSEE WALTZ PARKWAY ASHLAND CITY, TN PHONE 1-800-433-2545 FAX