A.O. Smith HYB-90N warranty Step E, Step F, Step G Connection To Vent Pipe, U.S. Power Vent

Page 30
STEP E

D.Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove all dirt, grease or moisture with a clean dry rag. If wiping fails to clean the surfaces, a chemical cleaner must be used. Check for possible damage such as splits or cracks and replace if necessary.

Depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached the bottom of the fitting socket in Step F. Measure the fitting depth and mark this distance on the pipe O.D. You may want to add several inches to the distance and make a second mark as the primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with a natural bristle brush. This process softens and prepares the PVC or CPVC for the solvent cementing step. Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer.

E.Application of solvent cement

Apply the solvent cement evenly and quickly around the outside of the pipe at a width a little greater than the depth of the fitting socket.

Apply a light coat of cement evenly around the inside of the fitting socket. Avoid puddling.

Apply a second coat of cement to the pipe end.

STEP E

F.Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do not continue to rotate the pipe after it has hit the bottom of the fitting socket. A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub. The fitting will have a tendency to slide back while the cement is still wet so hold the joint together for about 15 seconds.

STEP F

G. Cleanup and joint movement

Remove all excess cement from around the pipe and fitting with a dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing procedure, and sufficient time should be allowed for proper curing of the joint. Exact drying time is difficult to predict because it depends on variables such as temperature, humidity and cement integrity. For more specific information, you should contact your solvent cement manufacturer.

STEP G

CONNECTION TO VENT PIPE

The vent system connects to the vent pipe with and elbow or rubber coupling. This coupling includes gear clamps. These connections must be properly seated and tightened to prevent the leakage of flue gases into the installation area.

With 2 in. venting the straight rubber adapter is used for the connection to the vent pipe. With 3 in. venting a transition adapter is required to change from the 2 in. vent pipe to the 3 in. vent size.

Clean and lightly sand the end of the vent piping that will connect to the rubber coupling.

Loosen the upper clamp on the rubber adapter and insert the sanded end of the vent pipe and tighten the gear clamp.

NOTE: Do not glue or seal in the rubber coupling. Check the venting system to ensure that there is no stress on the connection or the vent pipe which will create a twisting or bending.

 

UPPER GEAR

 

CLAMP

 

LOWER

 

GEAR CLAMP

RUBBER COUPLING/

RUBBER ADAPTER (2 in.to

ADAPTER (2”)

3”)

FIGURE 30

U.S. POWER VENT

30

www.hotwater.com

Image 30
Contents Installation and Operating Manual For Your SafetyPOWER VENT GAS MODELS HYBRID GAS WATER HEATERSTABLE OF CONTENTS IMPORTANT INFORMATIONSAFE INSTALLATION, USE AND SERVICE IMPORTANT DEFINITIONSGENERAL SAFETY DANGER INTRODUCTION Page REPLACEMENT PARTS AND DELIMING PRODUCTS GET TO KNOW YOUR WATER HEATER - GAS MODELSINSTALLATION CONSIDERATIONS ROUGH IN DIMENSIONSINSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS WATER PIPING - MIXING VALVE USAGE Water Potable Heating All models are consideredFACTS TO CONSIDER ABOUT LOCATION HANDLE INSTALLATION EARTHQUAKE ZONES Access ToScrews Top Casing FrontCOMBUSTION AIR AND VENTILATION APPLIANCES IN UNCONFINED SPACESAPPLIANCES IN CONFINED SPACES B. ALL AIR FROM OUTDOORS See Figures 12, 13 and CLOSED WATER SYSTEMS CHEMICAL VAPOR CORROSIONWATER PIPING THERMAL EXPANSIONHARD WATER TEMPERATURE-PRESSURE RELIEF VALVET&P Valve and Pipe Insulation if supplied GAS PIPING SEDIMENT TRAPSFLOODING/FREEZING HIGH ALTITUDE INSTALLATIONSGAS LINE PURGING FILLING THE WATER HEATERIf using 2 inch vent pipe VENT PIPE TERMINATIONPLANNING THE VENT SYSTEM TERMINATION ELBOW If using 3 inch vent pipeRODENT SCREEN INSTALL INTO ELBOW GROUND LEVEL OR MAXIMUM SNOW LINE ELBOW STRAPCONDENSATE INSTALLATION OF VENT SYSTEMVENT TERMINAL INSTALLATION, SIDEWALL CONDENSATION WARNINGSEQUENCE OF INSTALLATIONS INSTALLATION SEQUENCEVent terminals supplied with heater must be used INSTALLATION OF VENT SYSTEM, SIDEWALL INSTALLATION OF VERTICAL VENT SYSTEMVENT PIPE PREPARATION RECOMMENDED BRUSH* SIZE FOR PRIMER AND CEMENT APPLICATIONS STEP ASTEP B STEP F U.S. POWER VENTSTEP E STEP G CONNECTION TO VENT PIPEVENT HOODS MAY BE EXTREMELY HOT DURING OPERATION FIGURE 33a ELECTRICAL CONNECTIONSCALIBRATION “OFF”, “up”OPERATING INSTRUCTIONS DISPLAY PANELNumeric Display CONTROLS. WIRING ERRORS CAN CAUTION LABEL ALL WIRES PRIOR TODISCONNECTION WHEN SERVICING CAUSE IMPROPER AND DANGEROUSOPERATING INSTRUCTIONS LIGHTING INSTRUCTIONSFOR YOUR SAFETY READ BEFORE LIGHTING TO TURN OFF GAS TO APPLIANCEHEAT CYCLE DEFINITIONS STATEDESCRIPTION TEMPERATURE REGULATION UNIQUE HYBRID FEATURES Temperature ProbesWater Circulation Pump Line Voltage Monitor START UP CONDITIONS CONSTANT OUTPUT TEMPERATURE CONTROLDetection of Failure to Maintain Desired Constant Temperature OPERATIONAL CONDITIONSVENTING SYSTEM INSPECTION MAINTENANCEHOUSEKEEPING BURNER OPERATION AND INSPECTIONTEMPERATURE-PRESSURE RELIEF VALVE OPERATION ANODE ROD REPLACEMENTCLEANING THE INLET WATER FILTER MOTORSCLEANING THE HEAT ENGINE FLUSHING THE HEAT EXCHANGER LIME BUILD- UPFAULT INDICATION AND ERROR CODES DRAINING THE TANKCode and DIAGNOSTIC DISPLAYDiagnostic DisplayedCause FaultLockout RemedyCode FaultLockout DescriptionCode TROUBLESHOOTING b.The unit display is an error code WHEN THE TAP IS OPENEDCheck if there is any error code on system installed, or there is aSERVICE LEAKAGE CHECKPOINTSPARTS IDENTIFICATION ITEM #A Baffle, Flue B Hot Water Outlet Nipple w/ Anode, Heat Trap AB C DEF G T SH R I Q P REPLACEMENT PARTS DESCRIPTION KIT #CLAIM PROCEDURE LIMITED RESIDENTIAL GAS WARRANTYSERVICE AND LABOR RESPONSIBILITY CONDITIONS AND EXCEPTIONSPage Page 500 TENNESSEE WALTZ PARKWAY ASHLAND CITY, TN PHONE 1-800-433-2545 FAX