A.O. Smith
BTN 120 THRU 400/A Series
warranty
Installation Operation Maintenance Limited Warranty
Install
Heater Wiring
Warranty
Dimension
Maintenance
System Diagnostics
Recommended Procedure For
Checklist
Replacement Parts
Precautions
Page 1
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
MODELS BTN 120 THRU 400/A Series
INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY
COMMERCIAL GAS, GLASS-LINED, TANK-TYPE WATER HEATER
TABLE 1. ROUGH-IN-DIMENSIONS
ROUGH-IN-DIMENSIONS
TABLE 3. GASAND ELECTRICAL CHARACTERISTICS
FRONT VIEW
FOREWORD
TABLE OF CONTENTS
PRECAUTIONS
GENERAL SAFETY INFORMATION
GROUNDING INSTRUCTIONS
CHEMICAL VAPOR CORROSION
HIGH ALTITUDE INSTALLATIONS
FEATURES
HIGH LIMIT SWITCH
ELECTRONIC IGNITION CONTROL
DISHWASHING MACHINE REQUIREMENT
CIRCULATING PUMP
UNCRATING
LOCATING THE HEATER
CLEARANCES
LEVELING
HARD WATER
AIR REQUIREMENTS
MULTIPLE HEATER MANIFOLD
VENTING
UNCONFINED SPACE
CONFINED SPACE
TYPE B GAS VENT Multiple Gas Fired Tank-Type Heaters
TABLE 6. TECHNICAL DATA VENTING
TABLE 6. TECHNICAL DATA VENTING Continued
WATER POTABLE HEATING AND SPACE HEATING See pages
WATER LINE CONNECTIONS
THERMOMETERS Not Supplied
RELIEF VALVE
GENERAL
INSTALLATION DIAGRAMS-TOP INLET/OUTLET USAGE
CODE RESTRICTIONS
DANGER
HORIZONTAL STORAGE TANK AND FORCED CIRCULATION
VERTICAL STORAGE TANK AND FORCED CIRCULATION
TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE
TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL
WITH RECIRCULATION OF SANITIZING LOOP
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE
TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATER
INSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE
WITH OR WITHOUT BUILDING RECIRCULATION
STORAGE WITH OR WITHOUT RECIRCULATION
ONE OR TWO TEMPERATURE - ONE HEATERS,HIGH TEMPERATURE
HEATER WITH OR WITHOUT MIXING VALVE
HEATER WITH MIXING VALVE AND RECIRCULATED SANITIZING LOOP
HEATER WITH OR WITHOUT BUILING RECIRCULATION
TWO TEMPERATURE - TWO PRE-HEATERS WITH MIXING VALVE OR BOOSTER
TWO PRE-HEATERS WITH MIXING VALVE
TWO PRE-HEATERS WITH BOOSTER HEATER
CIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION
MEDIUM TEMPERATURE - ONE HEATER WITH AUXILIARY STORAGE TANK FORCED
VERTICAL STORAGE TANK
HORIZONTAL STORAGE TANK
TWO UNIT MANIFOLD KIT
MANIFOLD KITS
THREE UNIT MANIFOLD KIT
FOUR UNIT MANIFOLD KIT
FIGURE 9 - SINGLE UNIT WIRING DIAGRAM BTN-120 THROUGH 400A
HEATER WIRING
GAS PRESSURE REGULATOR
GAS PIPING
TABLE 7 - GAS SUPPLY LINE SIZES IN INCHES MAXIMUM CAPACITY OF PIPE IN
CUBIC FEET PER HOUR
MANIFOLD GAS PRESSURE IN INCHES OF WATER COLUMN ALL MODELS
OPERATION
APPROXIMATE TIME REQUIRED TO CONSUME
1 CU. FT. OF GAS AT FULL CAPACITY
SEQUENCE OF OPERATION
LIGHTING AND OPERATION INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
OPERATING INSTRUCTIONS
CHECK THE IGNITOR ASSEMBLY
PREVENTIVE MAINTENANCE
IGNITOR ASSEMBLY
WATER TEMPERATURE CONTROL
GAS VALVES
MAIN BURNER
CHECKING THE INPUT
FIGURE 11, IGNITOR
REMOTE STORAGE TANK TEMPERATURE CONTROL
VENTING SYSTEM
HOT WATER ODOR
ANODE ROD INSPECTION
TANK CLEANOUT PROCEDURE
RECOMMENDED PROCEDURE FOR
DELIMING SOLVENTS
DELIMING USING FLO-JUG METHOD
SYSTEM DIAGNOSTICS
SERVICE
IGNITION MODULE SYSTEM
ELECTRICAL SERVICING
SEQUENCE OF OPERATION FLOW CHART
REPLACEMENT PARTS, SERVICE HANDBOOKS AND TRAINING AIDS
REPLACEMENT PARTS
SERVICEMAN
OPERATIONAL CHECKLIST
REMEDY
COMPLAINT
4. SERVICEANDREPAIREXPENSES
Model BTN Limited Warranty
6. CLAIMPROCEDURE
KEEPTHISWARRANTYPOSTEDADJACENTTOTHEHEATERFORFUTUREREFERENCE
Related pages
All Install page
Reinstallation for Linux for Samsung CLX4195FW
Installation Space for Samsung RF217AB
’INSTALLATION Instructions Importantes for Genie 2024
Installing Software for Network Printing for Samsung CLP-650 Series
Cushion System Installation for SMC Networks 5000
Installation for Haier 1590 SB
Installation, cont’d for Extron electronic HSA 822
Before Installing the Product Installation Guide for Samsung LH55WMHPTWC/EN
Software Installation for Moxa Technologies C168P
Installing steps for Yamaha LIT-11616-16-02
How do the accessories in the
HP DesignJet Z5200 manual
enhance printing?
Top
Page
Image
Contents